X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24384

Well Details

Well ID: 34-059-24384
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001064
Farm/Lease Name: WEEKENDER
License Status: Producing
License Date: 2014-07-11
Spud Date: 2014-06-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-09-24
Well Total Depth: 15304.00 ft
Configuration: Horizontal
Latitude: 40.050000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-06 Proposed Formations:TRENTON, Issued Date:6/6/2014, Expired Date:6/5/2016 12:00:00 PM, Drilling unit acres:650.448, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2014-09-24
Correction to Well 2014-12-05 CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR.
Correction to Well 2015-12-11 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-05-22
Construction Permit Expires 2016-07-10
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/04/2015 06/04/2015 8104 9,139,970.0 115500

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.1357 76,135,700.0
BC-140, FR-76, OPTIFLO-HTE, SAND-COMMON

WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK, SP BREAKER, WG-36 GELLING AGENT

Halliburton Breaker, Crosslinker, Friction Reducer, Gelling Agent, Proppant NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients C.I. Pigment Red 5 6410-41-9 1 0.00000680 6
Hydrotreated light petroleum distillate 64742-47-8 30 0.0324793 28058
Guar gum 9000-30-0 100 0.0677487 58525
Sodium persulfate 7775-27-1 100 0.00223165 1928
Acrylamide acrylate polymer Confidential 30 0.0324793 28058
Hydrochloric acid 7647-01-0 60 0.787784 680524
Dazomet 533-74-4 24 0.00703532 6078
Surfactant mixture Confidential 1 0.00135497 1172
Enzyme Confidential 5 0.00003402 30
Crystalline Silica, Quartz 14808-60-7 0.1 0.00006775 59
Organic phosphate 71050-62-9 25 0.00337367 2915
Silica gel 112926-00-8 1 0.000677487 586
Walnut hulls NA 100 0.00068033 588
Ethylene glycol 107-21-1 30 0.00206634 1785
Monoethanolamine borate 26038-87-9 60 0.00413268 3570
Sodium chloride 7647-14-5 30 0.0324793 28058
Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 5 0.00338743 2927
Crystalline silica, quartz 14808-60-7 100 10.3229 8,917,380.0
Cured acrylic resin Confidential 30 0.000210902 183
Water 7732-18-5 100 1.38206 1,193,890.0
Sodium Hydroxide 1310-73-2 4 0.00117255 1013
Sodium sulfate 7757-82-6 0.1 0.00000223 2
HP 2220, MB 7530 One AquaSource Biocide, Scale Inhibitor NA NA 0 0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-06-03 H2O 0 330325 Gal 323000 Halliburton Perforations:

7 shots .45inch diameter from 10260-10259 7 shots .45inch diameter from 10214-10213 7 shots .45inch diameter from 10167-10166 7 shots .45inch diameter from 10120-10119 7 shots .45inch diameter from 10073-10071

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP 295825 33557 100
2016 ECLIPSE RESOURCES I LP 781034 34962 360
2017 ECLIPSE RESOURCES I LP 398440 12836 363
2018 ECLIPSE RESOURCES I LP 275081 6024 362
2019 ECLIPSE RESOURCES I LP 58531 1070 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP Brine 5576 100
2016 ECLIPSE RESOURCES I LP Brine 11734 360
2017 ECLIPSE RESOURCES I LP Brine 4260 363
2018 ECLIPSE RESOURCES I LP Brine 2731 362
2019 ECLIPSE RESOURCES I LP Brine 532 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1343006105 2015-12-23 0:00 PW No Violations 0.50
-147694603 2015-4-16 0:00: PL No Violations 0.50
-1526745356 2016-6-13 0:00: PW No Violations 0.50
-1643058355 2017-6-7 0:00:0 PW No Violations 0.30
-1880294231 2014-8-14 0:00: DD No Violations 2.00
-1947782611 2016-11-28 0:00 PW No Violations 0.50
-2147467551 2015-6-3 0:00:0 CT No Violations 3.00
-37549249 2014-9-24 0:00: DD No Violations 2.50
0037549249 2014-09-24 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Patterson UTI Drilling Rig #328 had ran and cemented their production casing and were preparing to skid the rig to the 6H.
0147694603 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1343006105 2015-12-23 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Jim Nicholson I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 1950psi on the tubing and 2050psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1403652435 2014-06-24 Drill / Deepen / Reopen No Violations On the day of my inspection, I witnessed Universal Well Service break circulation with fresh water then displace four hundred five sacks of Type-1 cement with a weight of 15.6 and a yield of 1.21 down the well bore to a depth of one hundred foot, I witnessed twenty two barrels of cement returns back to the cellar.
1407719616 2014-08-10 Casing String Witnessed No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 24inch diameter hole to the depth of 438 feet and ran 442 feet of 18.625 inch 87.5#/ft. J-55 casing 4 feet above KB. The last joint of casing had to be washed down. Halliburton was on site gained circulation while washing casing down with 210bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 430 sacks of Class A cement and displaced cement with 122bbls of fresh water. Had good cement returns of 32bbls and cement stayed at surface.
1430002132 2020-6-17 0:00: PW No Violations 1.00
1467429087 2020-9-3 0:00:0 PW No Violations 1.00
1526745356 2016-06-13 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the closed position with 1535psi on the tubing and 1540psi on the casing.
1643058355 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with a plunger lift system with valves in the open position with 370 pounds per square inch on the tubing and 530 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1880294231 2014-08-14 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 was drilling a 12.5 inch diameter hole at a depth of 5132 feet with a planned td of 6900 feet. Completed walk around with Eclipse EHS Technician Mike Hartshorn which revealed no violations.
1947782611 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 560 pounds per square inch on the tubing and 740 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
2147467551 2015-06-03 Completion Testing No Violations On the day of my inspection I witnessed Halliburton frac stage 22 of 30 with a breakdown pressure of 9256psi, average treating pressure of 7895psi, average rate of 90.1bbls/min with 323000lbs of propant pumped.
468250663 2019-11-27 0:00 PW No Violations 0.20

For data sources see[9]

References