X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-45793"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2015
 
| 2015
| style="text-align: right;" |
+
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 131: Line 131:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 136: Line 137:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 2,163.85 Bbl
+
| style="text-align: right;" | 8.46 Bbl
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| STORAGE PENDING DISPOSAL OR REUSE
| PA0101508
+
|  
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 7.69 Bbl
 
| style="text-align: right;" | 7.69 Bbl
Line 148: Line 151:
 
|  
 
|  
 
|-
 
|-
| 2016-A00
+
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2,163.85 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 8.46 Bbl
+
| style="text-align: right;" | 42.31 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-A00
+
| 2017
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,451.83 Bbl
 
| style="text-align: right;" | 3,451.83 Bbl
Line 160: Line 172:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-A00
+
| 2017
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 80.77 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|
 +
|-
 +
| 2017
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 64.62 Bbl
 
| style="text-align: right;" | 64.62 Bbl
Line 166: Line 186:
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 80.77 Bbl
 
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|
 
|-
 
| 2017-A00
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 11.54 Bbl
 
| style="text-align: right;" | 11.54 Bbl
Line 178: Line 193:
 
|  
 
|  
 
|-
 
|-
| 2017-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 42.31 Bbl
 
| ROAD SPREADING
 
|
 
|-
 
| 2018-A00
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,118.35 Bbl
 
| style="text-align: right;" | 2,118.35 Bbl
Line 190: Line 200:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-A00
+
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 8.46 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 157.69 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 46.92 Bbl
 
| style="text-align: right;" | 46.92 Bbl
Line 196: Line 221:
 
| 34-155-24079
 
| 34-155-24079
 
|-
 
|-
| 2018-A00
+
| 2018
 +
| [[CATALYST ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 21.08 Bbl
 
| style="text-align: right;" | 21.08 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
|-
 
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 157.69 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0023213
 
|-
 
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.46 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
 
|-
 
|-
 
|}
 
|}

Revision as of 03:21, 20 August 2019

Well Details

Well ID: 37-121-45793
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW 3421
License Status: Active
Spud Date: 2015-02-09
Permit Date: 2014-11-03
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.379569
Longitude: -79.764356

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 1,419.57 213 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 8.46 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 7.69 Bbl ROAD SPREADING
2016 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 2,163.85 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 42.31 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 3,451.83 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 80.77 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 64.62 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 11.54 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 2,118.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 8.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 157.69 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 46.92 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid (in Barrels) RWC 802 21.08 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2343022 Primary Facility 2015-02-11 Administrative/File Review No Violations Noted
2348664 Primary Facility 2015-03-04 Administrative/File Review No Violations Noted
2414759 Primary Facility 2015-10-07 Routine/Complete Inspection No Violations Noted
2416326 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2422181 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2506768 Primary Facility 2016-08-02 Drilling/Alteration No Violations Noted
2509767 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted
2510792 Primary Facility 2016-08-16 Administrative/File Review No Violations Noted
2658152 Primary Facility 2017-11-07 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative coverage and is stable. There are no E&S issues. The site is considered restored.
2767554 Primary Facility 2018-08-24 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There is a tank battery located at the well site that appears in good shape housing three 210 bbl. steel tanks and a 100 bbl. fiber glass tank. There is also a lower tank battery that houses a 50 bbl. poly tank and a 50 bbl. steel tank. The site is stable with no E&S issues.

For data sources see[6]

References