If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45793 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW | |
License Status: Active | |
Spud Date: 2015-02-09 | |
Permit Date: 2014-11-03 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.379569 | |
Longitude: -79.764356 |
Date | Event |
---|---|
2014-11-03 | New Permit Application |
2015-02-09 | Performed Spud Operation |
2015-02-11 | Drilling Completion |
2016-08-01 | Perforation |
2016-08-02 | Performed Stage 1 of Stimulation |
2016-08-02 | Performed Stage 2 of Stimulation |
2016-08-02 | Performed Stage 3 of Stimulation |
2016-08-02 | Performed Stage 4 of Stimulation |
2016-08-02 | Performed Stage 5 of Stimulation |
2016-08-02 | Performed Stage 6 of Stimulation |
2016-08-18 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-08-02 | 1 | Sand | 0 | 1,500 | 3,500 |
2016-08-02 | 2 | Sand | 0 | 1,500 | 500 |
2016-08-02 | 3 | Sand | 0 | 1,500 | 3,000 |
2016-08-02 | 4 | Sand | 0 | 2,000 | 2,700 |
2016-08-02 | 5 | Sand | 0 | 2,400 | 3,100 |
2016-08-02 | 6 | Sand | 0 | 2,000 | 2,900 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 1419.57 | 213 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 7.69 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 80.77 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 64.62 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 11.54 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 3,451.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 157.69 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 46.92 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 21.08 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 2,118.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 155.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 688.46 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 278.46 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 50.77 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2343022 | Primary Facility | 2015-02-11 | Administrative/File Review | No Violations Noted | |
2348664 | Primary Facility | 2015-03-04 | Administrative/File Review | No Violations Noted | |
2414759 | Primary Facility | 2015-10-07 | Routine/Complete Inspection | No Violations Noted | |
2416326 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
2422181 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
2506768 | Primary Facility | 2016-08-02 | Drilling/Alteration | No Violations Noted | |
2509767 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | |
2510792 | Primary Facility | 2016-08-16 | Administrative/File Review | No Violations Noted | |
2658152 | Primary Facility | 2017-11-07 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative coverage and is stable. There are no E&S issues. The site is considered restored. |
2767554 | Primary Facility | 2018-08-24 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There is a tank battery located at the well site that appears in good shape housing three 210 bbl. steel tanks and a 100 bbl. fiber glass tank. There is also a lower tank battery that houses a 50 bbl. poly tank and a 50 bbl. steel tank. The site is stable with no E&S issues. |
For data sources see[8]