X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-015-23374"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-015-23374
 
| Well ID: 37-015-23374
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.562122, -76.301647 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.562122, -76.301647 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 04/18/2018
+
| Spud Date: 2018-04-18
 
|-
 
|-
| Permit Date: 9/21/2017
+
| Permit Date: 2017-09-21
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2018
 
| [[CHIEF OIL & GAS LLC]]
 
| style="text-align: right;" | 145,638.37
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[CHIEF OIL & GAS LLC]]
 
| style="text-align: right;" | 690,467.75
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2018-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 1,092.31 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2018-10
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 6.73 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2018-11
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 2.61 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,387.82 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 10.63 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,500.08 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 814.56 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-02
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 7.09 Tons
 
| LANDFILL
 
| 301358
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,513.88 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2725336
 
| Primary Facility
 
| 2018-05-02
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| The 4H and 5H wells were spudded on 4/18/2018. Conductors set. The 1H, 2H and 3H wells are staged for production. A soil stockpile was installed as shown on site plans. Soil stabilized with straw. It is unknown if fertilizer and seed mixture was applied. Silt stock applied around stockpile. No leaks from production equipment.
 
|-
 
| 2740826
 
| Primary Facility
 
| 2018-06-13
 
| Drilling/Alteration
 
| No Violations Noted
 
| Two wells being drilled. The 5H is currently being drilled. Containment appears sound. No leaks detected.
 
|-
 
| 2831475
 
| Primary Facility
 
| 2019-01-03
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| I arrived at the site at 12:05. The weather conditions are cloudy skies, chilly, with occasional snow flurries, and temperatures  in the mid 30's.  A vacuum truck is on site in the process of removing storm water on the pad surface adjacent to the production fluid tanks containment unit.  There was no other activity or personnel at the site.  The Kaufmann 1H-5H wells are in production.  Chief submitted a stimulation notification to the Department on 11/29/18 at 8:58 AM.  The comments in the notification indicate the frac started on the 4H well at 7:28 AM on 11/29/18.  The 4H and 5H wells are the most recently completed wells.  Completions operations consists of hydraulic fracturing (stimulation), hydraulic fracturing plug drill-outs, and flowback.  The secondary containment liner and equipment utilized for completions, along with frac tanks, remains on the pad surface.  Impacted material associated with a spill of fluid out of a frac blender tub remains on the pad surface in the northeast quadrant of the pad
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 238: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 12/05/2018
+
| 2018-12-05
| 12/09/2018
+
| 2018-12-09
 
| style="text-align: right;" | 8592
 
| style="text-align: right;" | 8592
 
| style="text-align: right;" | 9,010,430.0
 
| style="text-align: right;" | 9,010,430.0
Line 380: Line 202:
 
| style="text-align: right;" | 8371
 
| style="text-align: right;" | 8371
 
|-
 
|-
| Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt
+
| Ethanol, 2,2',2"-nitrilotris-,<br/> tris(dihydrogen phosphate) (ester), sodium salt
 
| 68171-29-9
 
| 68171-29-9
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
Line 470: Line 292:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 145,638.37
 +
| style="text-align: right;" | 17
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 690,467.75
 +
| style="text-align: right;" | 90
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,387.82 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 19.97 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 1,092.31 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,828.52 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 7.09 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 120.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2725336
 +
| Primary Facility
 +
| 2018-05-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The 4H and 5H wells were spudded on 4/18/2018. Conductors set. The 1H, 2H and 3H wells are staged for production. A soil stockpile was installed as shown on site plans. Soil stabilized with straw. It is unknown if fertilizer and seed mixture was applied. Silt stock applied around stockpile. No leaks from production equipment.
 +
|-
 +
| 2740826
 +
| Primary Facility
 +
| 2018-06-13
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Two wells being drilled. The 5H is currently being drilled. Containment appears sound. No leaks detected.
 +
|-
 +
| 2831475
 +
| Primary Facility
 +
| 2019-01-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I arrived at the site at 12:05. The weather conditions are cloudy skies, chilly, with occasional snow flurries, and temperatures  in the mid 30's.  A vacuum truck is on site in the process of removing storm water on the pad surface adjacent to the production fluid tanks containment unit.  There was no other activity or personnel at the site.  The Kaufmann 1H-5H wells are in production.  Chief submitted a stimulation notification to the Department on 11/29/18 at 8:58 AM.  The comments in the notification indicate the frac started on the 4H well at 7:28 AM on 11/29/18.  The 4H and 5H wells are the most recently completed wells.  Completions operations consists of hydraulic fracturing (stimulation), hydraulic fracturing plug drill-outs, and flowback.  The secondary containment liner and equipment utilized for completions, along with frac tanks, remains on the pad surface.  Impacted material associated with a spill of fluid out of a frac blender tub remains on the pad surface in the northeast quadrant of the pad
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 13:34, 20 August 2019

Well Details

Well ID: 37-015-23374
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Wilmot Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 147311
Farm/Lease Name: KAUFMANN EAST UNIT 5H
License Status: Active
Spud Date: 2018-04-18
Permit Date: 2017-09-21
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.562122
Longitude: -76.301647

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-05 2018-12-09 8592 9,010,430.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid PVS Acidizing Listed Below
Sand Sargent/Unimin Proppant Listed Below
FR-11 Chemplex, Slovay Group Friction Reducer Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00006000 57
Methanol 67-56-1 45 0.01048 9418
Quaternary ammonium compound 68424-85-1 10 0.00233 2093
Oleic acid diethanolamide 93-83-4 2 0.00136 1222
Water 7732-18-5 50 0.03399 30551
Crystallilne silica 14808-60-7 100 16.115 14,483,300.0
Ethylene glycol 107-21-1 30 0.00158 1420
Thiourea 62-56-6 1 0.00001000 1
Formaldehyde 50-00-0 1 0.00001000 1
Water 7732-18-5 85 0.10651 95728
Methanol 67-56-1 5 0.00001000 5
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00004000 33
Water 7732-18-5 40 0.00931 8371
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00158 1420
Water 7732-18-5 40 0.00211 1893
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.0136 12220
Acetophenone 98-86-2 1 0.00001000 1
Hydrochloric acid 7647-01-0 15 0.0188 16893
Water 7732-18-5 100 83.6631 75,192,000.0
Glutaraldehyde 111-30-8 5 0.00116 1046
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00136 1222
Copolymer of 2-Propenamide 79-06-1 20 0.0136 12220
BIO11219A Nalco Champion Biocide Listed Below
Unihib G GeoSafe Acid Inhibitor Listed Below
SCAL16486A Nalco Champion Scale Inhibitor Listed Below

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHIEF OIL & GAS LLC 145,638.37 17 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 690,467.75 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 3,387.82 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials (in Tons) RWC 806 19.97 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Drill Cuttings (in Tons) RWC 810 1,092.31 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 3,828.52 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials (in Tons) RWC 806 7.09 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2725336 Primary Facility 2018-05-02 Routine/Complete Inspection No Violations Noted The 4H and 5H wells were spudded on 4/18/2018. Conductors set. The 1H, 2H and 3H wells are staged for production. A soil stockpile was installed as shown on site plans. Soil stabilized with straw. It is unknown if fertilizer and seed mixture was applied. Silt stock applied around stockpile. No leaks from production equipment.
2740826 Primary Facility 2018-06-13 Drilling/Alteration No Violations Noted Two wells being drilled. The 5H is currently being drilled. Containment appears sound. No leaks detected.
2831475 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:05. The weather conditions are cloudy skies, chilly, with occasional snow flurries, and temperatures in the mid 30's. A vacuum truck is on site in the process of removing storm water on the pad surface adjacent to the production fluid tanks containment unit. There was no other activity or personnel at the site. The Kaufmann 1H-5H wells are in production. Chief submitted a stimulation notification to the Department on 11/29/18 at 8:58 AM. The comments in the notification indicate the frac started on the 4H well at 7:28 AM on 11/29/18. The 4H and 5H wells are the most recently completed wells. Completions operations consists of hydraulic fracturing (stimulation), hydraulic fracturing plug drill-outs, and flowback. The secondary containment liner and equipment utilized for completions, along with frac tanks, remains on the pad surface. Impacted material associated with a spill of fluid out of a frac blender tub remains on the pad surface in the northeast quadrant of the pad

For data sources see[7]

References