If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23374 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.562122,"lon":-76.301647,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Wilmot Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147311 | |
Farm/Lease Name: KAUFMANN EAST UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-09-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.562122 | |
Longitude: -76.301647 |
Date | Event |
---|---|
2017-09-21 | New Permit Application |
2018-04-18 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-12-05 | 2018-12-09 | 8,592 | 9,010,430 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | PVS | Acidizing | Listed Below | ||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
FR-11 | Chemplex, Slovay Group | Friction Reducer | Listed Below | |||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00006000 | 57 | ||||
Methanol | 67-56-1 | 45 | 0.01048 | 9418 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00233 | 2093 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.00136 | 1222 | ||||
Water | 7732-18-5 | 50 | 0.03399 | 30551 | ||||
Crystallilne silica | 14808-60-7 | 100 | 16.115 | 14,483,300.0 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00158 | 1420 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Water | 7732-18-5 | 85 | 0.10651 | 95728 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 5 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 33 | ||||
Water | 7732-18-5 | 40 | 0.00931 | 8371 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00158 | 1420 | ||||
Water | 7732-18-5 | 40 | 0.00211 | 1893 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 20 | 0.0136 | 12220 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0188 | 16893 | ||||
Water | 7732-18-5 | 100 | 83.6631 | 75,192,000.0 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00116 | 1046 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00136 | 1222 | ||||
Copolymer of 2-Propenamide | 79-06-1 | 20 | 0.0136 | 12220 | ||||
BIO11219A | Nalco Champion | Biocide | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
SCAL16486A | Nalco Champion | Scale Inhibitor | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | 145,638.37 | 17 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,859,153.70 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 3,387.82 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,092.31 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 19.97 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 9.13 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 7,486.06 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2725336 | Primary Facility | 2018-05-02 | Routine/Complete Inspection | No Violations Noted | The 4H and 5H wells were spudded on 4/18/2018. Conductors set. The 1H, 2H and 3H wells are staged for production. A soil stockpile was installed as shown on site plans. Soil stabilized with straw. It is unknown if fertilizer and seed mixture was applied. Silt stock applied around stockpile. No leaks from production equipment. |
2740826 | Primary Facility | 2018-06-13 | Drilling/Alteration | No Violations Noted | Two wells being drilled. The 5H is currently being drilled. Containment appears sound. No leaks detected. |
2831475 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:05. The weather conditions are cloudy skies, chilly, with occasional snow flurries, and temperatures in the mid 30's. A vacuum truck is on site in the process of removing storm water on the pad surface adjacent to the production fluid tanks containment unit. There was no other activity or personnel at the site. The Kaufmann 1H-5H wells are in production. Chief submitted a stimulation notification to the Department on 11/29/18 at 8:58 AM. The comments in the notification indicate the frac started on the 4H well at 7:28 AM on 11/29/18. The 4H and 5H wells are the most recently completed wells. Completions operations consists of hydraulic fracturing (stimulation), hydraulic fracturing plug drill-outs, and flowback. The secondary containment liner and equipment utilized for completions, along with frac tanks, remains on the pad surface. Impacted material associated with a spill of fluid out of a frac blender tub remains on the pad surface in the northeast quadrant of the pad |
For data sources see[8]