If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Guernsey_County,_Ohio|Guernsey]] | | County: [[Guernsey_County,_Ohio|Guernsey]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Wills_Township,_Guernsey_County,_Ohio|Wills Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
Line 33: | Line 33: | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: 40.028684404 |
|- | |- | ||
| Longitude: -81.34652564 | | Longitude: -81.34652564 |
Well ID: 34-059-24418 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.028684404,"lon":-81.34652564,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001114 | |
Farm/Lease Name: FINERAN B | |
License Status: Well Drilled | |
License Date: 2019-01-14 | |
Spud Date: 2014-08-25 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2019-01-13 | |
Well Total Depth: 25084 ft | |
Configuration: Horizontal | |
Latitude: 40.028684404 | |
Longitude: -81.34652564 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-25 | Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-12-16 | Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-10-30 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2019-01-13 | |
APP | 2019-01-14 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-04-08 | |
Correction to Well | 2019-04-12 | PLAT CHANGE TAKE/TARGET |
Construction Permit Expires | 2021-01-13 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-02-12 | ACID | 0 | 0 Gal | 0 | PRO FRAC | Stage 1 completed by Pro Frac. |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0029698074 | 2019-02-12 | Completion Testing | No Violations | The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection Pro Frac Services were pumping the first stage. The top perforation was at 24830 and the bottom perforation was at 24828. 2000 gallon of 15 percent hydrochloric acid was utilized. The 9.625-inch diameter intermediate casing was evaluated prior to the stage and the gauge present read 0 pounds per square inch. |
0744591187 | 2014-09-09 | Casing String Witnessed | No Violations | I was onsite to witness the 18-5/8 surface casing being cemented to the surface. The pipe was ran to a depth of 440ft. Halliburton was onsite to do the cementing of this well. They used a total of 245sks of Bondcem cement with a return of 5bbls to the surface. |
0964349339 | 2019-01-22 | Drill / Deepen / Reopen | No Violations | Drilling operations have been completed and the well awaits completion within the point pleasant formation. |
1175727417 | 2019-05-28 | Completion Testing | No Violations | The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location. |
1303073387 | 2019-04-30 | Completion Testing | No Violations | The purpose of my inspection was a status check on completion operations. During my inspection a service rig was drilling out frac plugs. 11 stages of 111 frac plugs have been drilled out. |
1424351450 | 2015-02-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Precision Drilling Rig #110 was drilling ahead on 10.8# SOBM at with a 12 inch diameter bit at depth of 6493 feet with a planned td of 6580 feet and 9.625 inch casing and cementing to follow. Completed walk around with Consultant Jeb Dobbs revealing no violations. |
1546271670 | 2018-12-28 | Drill / Deepen / Reopen | No Violations | The purpose of my inspection was a status check on drilling operations. During my inspection H&P 531 was in the process of walking to the well. The 9.625 -inch diameter intermediate casing was set and cemented at 6595-feet on 2/20/2015. I met with Eclipse Company Man Wade Gray. |
1779971934 | 2015-04-29 | Preliminary Restoration | No Violations | On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A. |
2028860933 | 2019-05-13 | Completion Testing | No Violations | During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well. |
For data sources see[4]