X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24418

Well Details

Well ID: 34-059-24418
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001114
Farm/Lease Name: FINERAN B
License Status: Producing
License Date: 2019-01-14
Spud Date: 2014-08-25
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2019-01-13
Well Total Depth: 25084.00 ft
Configuration: Horizontal
Latitude: 40.020000
Longitude: -81.340000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-25 Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-12-16 Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-10-30 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-13
APP 2019-01-14 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-04-08
Correction to Well 2019-04-12 PLAT CHANGE TAKE/TARGET
Construction Permit Expires 2021-01-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
24830 24934 0
8156 8278 0
8156 8278 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2019-02-12 ACID 0 0 Gal 0 PRO FRAC Stage 1 completed by Pro Frac.

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1175727417 2019-5-28 0:00: CT No Violations 0.30
-1294514554 2020-6-11 0:00: PW No Violations 1.00
-1303073387 2019-4-30 0:00: CT No Violations 0.20
-1779971934 2015-4-29 0:00: PL No Violations 0.50
-2028860933 2019-5-13 0:00: CT No Violations 0.30
-2075133240 2019-12-11 0:00 PW No Violations 0.20
-29698074 2019-2-12 0:00: CT No Violations 2.00
0029698074 2019-02-12 Completion Testing No Violations The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection Pro Frac Services were pumping the first stage. The top perforation was at 24830 and the bottom perforation was at 24828. 2000 gallon of 15 percent hydrochloric acid was utilized. The 9.625-inch diameter intermediate casing was evaluated prior to the stage and the gauge present read 0 pounds per square inch.
0744591187 2014-09-09 Casing String Witnessed No Violations I was onsite to witness the 18-5/8 surface casing being cemented to the surface. The pipe was ran to a depth of 440ft. Halliburton was onsite to do the cementing of this well. They used a total of 245sks of Bondcem cement with a return of 5bbls to the surface.
0964349339 2019-01-22 Drill / Deepen / Reopen No Violations Drilling operations have been completed and the well awaits completion within the point pleasant formation.
1175727417 2019-05-28 Completion Testing No Violations The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location.
1303073387 2019-04-30 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection a service rig was drilling out frac plugs. 11 stages of 111 frac plugs have been drilled out.
1424351450 2015-02-19 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Precision Drilling Rig #110 was drilling ahead on 10.8# SOBM at with a 12 inch diameter bit at depth of 6493 feet with a planned td of 6580 feet and 9.625 inch casing and cementing to follow. Completed walk around with Consultant Jeb Dobbs revealing no violations.
1546271670 2018-12-28 Drill / Deepen / Reopen No Violations The purpose of my inspection was a status check on drilling operations. During my inspection H&P 531 was in the process of walking to the well. The 9.625 -inch diameter intermediate casing was set and cemented at 6595-feet on 2/20/2015. I met with Eclipse Company Man Wade Gray.
1779971934 2015-04-29 Preliminary Restoration No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
2028860933 2019-05-13 Completion Testing No Violations During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well.
744591187 2014-9-9 0:00:0 CS No Violations 7.00
964349339 2019-1-22 0:00: DD No Violations 0.10

For data sources see[5]

References