X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-059-24520"

m
m
Line 11: Line 11:
 
| County: [[Guernsey_County,_Ohio|Guernsey]]
 
| County: [[Guernsey_County,_Ohio|Guernsey]]
 
|-
 
|-
| Municipality: [[Millwood Township,_Guernsey_County,_Ohio|Millwood Township]]
+
| Municipality: [[Millwood_Township,_Guernsey_County,_Ohio|Millwood Township]]
 
|-
 
|-
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
Line 33: Line 33:
 
| Configuration: Horizontal
 
| Configuration: Horizontal
 
|-
 
|-
| Latitude: <Latitude>
+
| Latitude: 39.978003584
 
|-
 
|-
 
| Longitude: -81.34837348
 
| Longitude: -81.34837348
Line 355: Line 355:
 
| style="text-align: right;" | 195
 
| style="text-align: right;" | 195
 
|-
 
|-
| 1-Propanaminium, 3-amino-n-(carboxymethyl)-n, n-dimethyl-n-coco alkyl derivatives, hydroxides and inner salts
+
| 1-Propanaminium, 3-amino-n-(carboxymethyl)-n,
 +
n-dimethyl-n-coco
 +
alkyl derivatives, hydroxides and inner salts
 
| 61789-40-0
 
| 61789-40-0
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 60
Line 373: Line 375:
 
| style="text-align: right;" | 294
 
| style="text-align: right;" | 294
 
|-
 
|-
| Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-, branched
+
| Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
 +
branched
 
| 127087-87-0
 
| 127087-87-0
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 5
Line 409: Line 412:
 
| style="text-align: right;" | 2811
 
| style="text-align: right;" | 2811
 
|-
 
|-
| Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl chlorides
+
| Quaternary ammonium compounds,
 +
benzyl-C12-16-alkyldimethyl chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 5

Revision as of 23:47, 31 August 2019

Well Details

Well ID: 34-059-24520
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001546
Farm/Lease Name: JUPITER B UNIT
License Status: Producing
License Date: 2018-04-06
Spud Date: 2018-01-30
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-05-16
Well Total Depth: 27535 ft
Configuration: Horizontal
Latitude: 39.978003584
Longitude: -81.34837348

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-09-28 Proposed Formations:TRENTON, Issued Date:9/28/2017, Expired Date:9/28/2019 12:00:00 PM, Drilling unit acres:, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-04-06 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/6/2018, Expired Date:4/5/2020 12:00:00 PM, Drilling unit acres:1178.185, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-05-16
Correction to Well 2018-08-24 TAKE TARGET UPDATE AS-DRILLED
Completion Report Received 2018-11-28
Record Last Modified 2018-12-13
Construction Permit Expires 2020-04-05

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-12-12 7953 8067 0
2018-12-12 27275 27380 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/18/2018 08/18/2018 7483.6 37,136,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Produced Water Operator Base Fluid Water 7732-18-5 100 9.18165 34,363,500.0
HP-9601 One AquaSource Inc. Breaker Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
HP-2814 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SCALECHEK LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
LD-2850 Multi-chem Friction Reducer Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
HP-2220 One AquaSource Inc. Scale Inhibitor Listed Below Listed Below 0 0 0
HP-2816 One AquaSource Inc. Friction Reducer Listed Below Listed Below 0 0 0
LD-2550 Multi-chem Friction Reducer Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50 Halliburton Proppant Listed Below Listed Below 0 0 0
MB-7532 One AquaSource Inc. Biocide Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.289571 1,083,760.0
Ammonium chloride 12125-02-9 1.5 0.000822961 3081
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.00987554 36961
Ethanol 64-17-5 60 0.000323121 1210
Naphthalene 91-20-3 5 0.00002636 99
Sodium hydroxide 7647-14-5 10 0.00116198 4350
Methanol 67-56-1 60 0.000508609 1905
Propargyl alcohol 107-19-7 10 0.00005187 195
1-Propanaminium, 3-amino-n-(carboxymethyl)-n,

n-dimethyl-n-coco alkyl derivatives, hydroxides and inner salts

61789-40-0 60 0.000939515 3517
Phosphate of a Diamine, Sodium Salt Proprietary 30 0.000196412 736
Glycerine 56-81-5 5 0.00007829 294
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002636 99
Phosphoric acid 7664-38-2 0.1 0.00000068 3
Organic phosphate copolymer 71050-62-9 25 0.00287658 10766
Sodium chloride 7647-14-5 30 0.000751075 2811
Olefins Proprietary 5 0.00006225 236
Hydrotreated light petroleum distillates 64742-47-8 30 0.000751075 2811
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00003421 129
Citric acid 77-92-9 60 0.00216943 8120
Poly(oxy-1,2-ethanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 5 0.000380677 1425
9-Octodecenamide, n, n-bis-2 (hydroxy-ethyl)-, (Z) 93-83-4 5 0.000125179 469
1,2,4 Trimethylbenzene 95-63-6 1 0.00000527 20
Distillate (petroleum), hydrotreated light) 64742-47-8 20 0.00152271 5699
Crystalline silica, quartz 14808-60-7 100 9.47304 35,454,000.0
Hydrochloric acid 7647-01-0 15 0.0429661 160806
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00015814 592
Ethoxylated alcohols Proprietary 30 0.00015562 583
Fatty acids, tall oil Proprietary 30 0.00015562 583
Oxyalkylated phenolic resin Proprietary 30 0.000210853 790
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.000125179 469
Modified thiourea polymer Proprietary 30 0.00015562 583
Ammonium persulfate 7727-54-0 95 0.00179104 6704
Glutaraldehyde 111-30-8 30 0.000205252 769
Dazomet 533-74-4 24 0.00603234 22577
Fresh Water Operator Base Fluid Water 7732-18-5 100 80.9478 302,957,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-18 H2O 15 334158 Gal 274800 Halliburton STAGE 1/130

STAGES 2-129 SEE IMAGES

2018-08-18 H2O 15 300941 Gal 272660 Halliburton STAGE 130/130

STAGES 2-129 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 568759 168583 93
2019 ECLIPSE RESOURCES I LP 561457 147565 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 38837 93
2019 ECLIPSE RESOURCES I LP Brine 25441 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0212186130 2018-10-09 Preliminary Restoration No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of four sand traps, 4 gas production units, and two 400-barrel tanks. Identification was posted at the wellhead. Southern Fencing company was on location installing chain link fencing around the pad. Location meets requirements for preliminary restoration.
0500703194 2018-01-29 Casing String Witnessed No Violations On the day of my inspection after receiving a call from Eclipse Consultant Charlie Frazier concerning the wellbore caving in after spudding the well on 1/27/18, I witnessed the below the cellar the sand based material had collapsed into the wellbore with drilling ceased. A meeting with Mr. Frazier and Cement Specialist Lex Cook was held where they propose to clean the wellbore up with a 42 inch diameter bit and install 36 inch drive pipe into bedrock and remove any excess water and then utilizing 9-grout fill the backside to surface. Precision cleaned the wellbore up with a 42 inch diameter bit to 16 feet and ran 21 feet of 36 inch 195.175 pound per foot drive pipe and drove it leaving it set at 5 feet below surface. Water was removed from the annulus and Caldwell Redi-Mix pumped 10 yards of 9-sack grout bringing grout to surface. Tomorrow Precision Rathole will commence drilling a 30 inch diameter hole to the total depth of 120 feet and then running 24 inch diameter conductor pipe with cement to follow.
0709172815 2019-03-12 Production Wells No Violations I was accompanied by ODNR Southeast Regional Manager Brent Bear and the purpose of our inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 1290 pounds per square inch, the 5.5-inch diameter production casing had 461 pounds per square inch, and the 2.875-inch diameter tubing had 900 pounds per square inch. The production equipment consisted of four sand traps, four gas production units, and two 400-barrel tanks. The produced water was being separated on pad and being stored in the 400-barrel tanks. Produced oil and gas was being gathered at the Eclipse outlaw pad via pipeline. Identification was located at the wellhead.
1006008437 2018-01-30 Casing String Witnessed No Violations On the day of my inspection I witnessed Precision Rathole drill through the grout and cleaned the wellbore up with a 42 inch diameter bit to 16 feet and ran 21 feet of 36 inch 195.175 pound per foot drive pipe and drove it to 26 feet leaving it set at 5 feet below surface. Water was removed from the annulus and Caldwell Redi-Mix pumped 10 yards of 9-sack grout bringing grout to surface.
1525104112 2018-04-30 Drill / Deepen / Reopen No Violations During my inspection H&P Drilling Rig 531 was on location drilling the 12.25 inch diameter intermediate borehole at 4166 feet in depth. 9.625 inch diameter casing was laid out on the pipe racks. The Eclipse company man estimates that the cement job will be Wednesday 5/2/18.
1548946965 2019-01-31 Production Wells No Violations The purpose of my inspection was a status check. The pad is named Jupiter and on this date the pad consist of two production wells 3405924520 and 3405924521. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 0 pounds per square inch, the 9.625-inch diameter intermediate casing had 1100 pounds per square inch, the 5.5-inch diameter production casing had 530 pounds per square inch, and the 2.875-inch diameter tubing had 1100 pounds per square inch. The production equipment consisted of four sand traps, four gas production units, four frac tanks, and two 400-barrel tanks. The produced water was being separated on pad and distributed in the frac and 400-barrel tanks. The oil and gas were being gathered at the Eclipse outlaw pad via pipeline. Identification was located at the wellhead.
1754808326 2018-09-10 Completion Testing No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection Deep Well Services stand alone snubbing unit 10 was on location drilling out frac plugs on 3405924521 and production equipment was being assembled. The area affected by pad construction has all been remediated with vegetation growth. The lease road was paved with asphalt and concrete and the pad was gravel. The location meets the preliminary restoration requirements for 1509.072 (A).
2046745238 2018-02-01 Casing String Witnessed No Violations On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 100 feet and ran 102 feet of 24 inch diameter 94.62 pounds per foot conductor pipe with a 2 foot stick up. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 300 pounds per square inch pressure test and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 92 feet with 48.3 barrels of fresh water with good cement returns of 12 barrels to surface. Mix water was tested revealing chlorides of 32 parts per million, pH 7 and 57 degrees.

For data sources see[10]

References