X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24338"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Deerfield Township,_Portage_County,_Ohio|Deerfield Township]]
+
| Municipality: [[Deerfield_Township,_Portage_County,_Ohio|Deerfield Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 01:59, 1 September 2019

Well Details

Well ID: 34-133-24338
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Deerfield Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: TURNER UNIT
License Status: Producing
License Date: 2008-06-30
Spud Date: 2008-07-07
Spud Drilling Contractor: UNION DRLG
Final Drill Date: 2008-07-15
Well Total Depth: 5564 ft
Configuration: Directional
Latitude: 41.009544733
Longitude: -81.04876442

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-04-10 Proposed Formations:CLINTON, Issued Date:4/10/2007, Expired Date:4/9/2008 6:00:00 AM, Drilling unit acres:42.88, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2008-06-30 Proposed Formations:CLINTON, Issued Date:6/30/2008, Expired Date:6/30/2009 6:00:00 AM, Drilling unit acres:42.88, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-07-15
Completion Report Received 2008-09-15
Construction Permit Expires 2009-06-30
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-10-22 5300 5390 97

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2928 Bbl 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P 15 276 365
2009 EVERFLOW EASTERN PTNS L P 1654 947 365
2010 EVERFLOW EASTERN PTNS L P 4292 620 365
2011 EVERFLOW EASTERN PTNS L P 5139 487 365
2012 EVERFLOW EASTERN PTNS L P 6490 485 366
2013 EVERFLOW EASTERN PTNS L P 6833 378 365
2014 EVERFLOW EASTERN PTNS L P 5657 311 365
2015 EVERFLOW EASTERN PTNS L P 5747 270 365
2016 EVERFLOW EASTERN PTNS L P 5548 315 365
2017 EVERFLOW EASTERN PTNS L P 6683 239 365
2018 EVERFLOW EASTERN PTNS L P 5814 208 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P Brine 59 365
2009 EVERFLOW EASTERN PTNS L P Brine 169 365
2010 EVERFLOW EASTERN PTNS L P Brine 100 365
2011 EVERFLOW EASTERN PTNS L P Brine 60 365
2012 EVERFLOW EASTERN PTNS L P Brine 36 366
2013 EVERFLOW EASTERN PTNS L P Brine 53 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 365
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 23 365
2017 EVERFLOW EASTERN PTNS L P Brine 28 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0036209404 2008-09-10 Production Wells No Violations The affected area has been graded and seeded. As soon as the vegetation establishes, preliminary restoration will be approved. No violations at this time.
0282642092 2009-04-16 Preliminary Restoration No Violations Preliminary restoration is approved.
0356389517 2018-03-12 Production Wells No Violations Status check inspection of this directional Clinton Sandstone well. My inspection found the wellhead fenced and locked. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. Gauges indicate 260psi on the 4.5 production casing and 50psi on the tubing. This well produces to a diked and fenced tank battery on location and is shared with the Turner #1 (PN#23626). The battery contains two (2) dedicated 100 barrel tanks, two (2) dedicated horizontal separators, and a shared 70 barrel tank. The required ID is posted at the wellhead and at the tank battery. No violations.
0608618253 2008-07-15 Drill / Deepen / Reopen No Violations Union is drillng ahead and will TD the well later today. The pits are fenced, lined and in good condition.
0831848380 2008-07-17 Drill / Deepen / Reopen No Violations Union is rigging down and will move tomorrow.
0908998398 2008-07-07 Drill / Deepen / Reopen No Violations Union is drilling ahead and will set conductor casing later today.
1072413549 2008-07-10 Drill / Deepen / Reopen No Violations Union is drilling ahead just past the kick-off point. The pits are fenced, lined and in good condition.
1082339909 2008-08-14 Drill / Deepen / Reopen No Violations Dailey Excavating was on site to solidify the drilling pits and start reclaiming the site. No violations at this time.
1217621228 2008-07-23 Drill / Deepen / Reopen No Violations J-M Water Service was on site to empty the drilling pits. The pits are fenced, lined and in good condition.
1595766951 2008-07-02 Drill / Deepen / Reopen No Violations Union Drilling Rig 24 has moved on site and will spud the well after the July 4 holiday.

For data sources see[9]

References