If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24338 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41,"lon":-81.04,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Deerfield Township | |
| Operator Name: EVERFLOW EASTERN PARTNERS LP | |
| Well Pad ID: | |
| Farm/Lease Name: TURNER UNIT | |
| License Status: Producing | |
| License Date: 2008-06-30 | |
| Spud Date: 2008-07-07 | |
| Spud Drilling Contractor: UNION DRLG | |
| Final Drill Date: 2008-07-15 | |
| Well Total Depth: 5564.00 ft | |
| Configuration: Directional | |
| Latitude: 41.000000 | |
| Longitude: -81.040000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-04-10 | Proposed Formations:CLINTON, Issued Date:4/10/2007, Expired Date:4/9/2008 6:00:00 AM, Drilling unit acres:42.88, Proposed Well Type:OG, Proposed Well Class:POOL |
| APP | 2008-06-30 | Proposed Formations:CLINTON, Issued Date:6/30/2008, Expired Date:6/30/2009 6:00:00 AM, Drilling unit acres:42.88, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-07-15 | |
| Completion Report Received | 2008-09-15 | |
| Construction Permit Expires | 2009-06-30 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-10-22 | 5300 | 5390 | 97 |
| 5300 | 5390 | 97 | |
| 5300 | 5390 | 97 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2928 Bbl | 100000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | EVERFLOW EASTERN PARTNERS LP | 15.00 | 276.00 | 365 |
| 2009 | EVERFLOW EASTERN PARTNERS LP | 1654.00 | 947.00 | 365 |
| 2010 | EVERFLOW EASTERN PARTNERS LP | 4292.00 | 620.00 | 365 |
| 2011 | EVERFLOW EASTERN PARTNERS LP | 5139.00 | 487.00 | 365 |
| 2012 | EVERFLOW EASTERN PARTNERS LP | 6490.00 | 485.00 | 366 |
| 2013 | EVERFLOW EASTERN PARTNERS LP | 6833.00 | 378.00 | 365 |
| 2014 | EVERFLOW EASTERN PARTNERS LP | 5657.00 | 311.00 | 365 |
| 2015 | EVERFLOW EASTERN PARTNERS LP | 5747.00 | 270.00 | 365 |
| 2016 | EVERFLOW EASTERN PARTNERS LP | 5548.00 | 315.00 | 365 |
| 2017 | EVERFLOW EASTERN PARTNERS LP | 6683.00 | 239.00 | 365 |
| 2018 | EVERFLOW EASTERN PARTNERS LP | 5814.00 | 208.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 59 | 365 |
| 2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 169 | 365 |
| 2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 100 | 365 |
| 2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 60 | 365 |
| 2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 36 | 366 |
| 2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 53 | 365 |
| 2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
| 2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
| 2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 23 | 365 |
| 2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 28 | 365 |
| 2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1072413549 | 2008-7-10 0:00: | DD | No Violations | |
| -1082339909 | 2008-8-14 0:00: | DD | No Violations | |
| -1595766951 | 2008-7-2 0:00:0 | DD | No Violations | |
| -356389517 | 2018-3-12 0:00: | PW | No Violations | 0.70 |
| -36209404 | 2008-9-10 0:00: | PW | No Violations | |
| -608618253 | 2008-7-15 0:00: | DD | No Violations | |
| -831848380 | 2008-7-17 0:00: | DD | No Violations | |
| -908998398 | 2008-7-7 0:00:0 | DD | No Violations | |
| 0036209404 | 2008-09-10 | Production Wells | No Violations | The affected area has been graded and seeded. As soon as the vegetation establishes, preliminary restoration will be approved. No violations at this time. |
| 0282642092 | 2009-04-16 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 0356389517 | 2018-03-12 | Production Wells | No Violations | Status check inspection of this directional Clinton Sandstone well. My inspection found the wellhead fenced and locked. The wellhead is equipped with 1.5 tubing and operating with the aid of a plunger lift system. Gauges indicate 260psi on the 4.5 production casing and 50psi on the tubing. This well produces to a diked and fenced tank battery on location and is shared with the Turner #1 (PN#23626). The battery contains two (2) dedicated 100 barrel tanks, two (2) dedicated horizontal separators, and a shared 70 barrel tank. The required ID is posted at the wellhead and at the tank battery. No violations. |
| 0608618253 | 2008-07-15 | Drill / Deepen / Reopen | No Violations | Union is drillng ahead and will TD the well later today. The pits are fenced, lined and in good condition. |
| 0831848380 | 2008-07-17 | Drill / Deepen / Reopen | No Violations | Union is rigging down and will move tomorrow. |
| 0908998398 | 2008-07-07 | Drill / Deepen / Reopen | No Violations | Union is drilling ahead and will set conductor casing later today. |
| 1072413549 | 2008-07-10 | Drill / Deepen / Reopen | No Violations | Union is drilling ahead just past the kick-off point. The pits are fenced, lined and in good condition. |
| 1082339909 | 2008-08-14 | Drill / Deepen / Reopen | No Violations | Dailey Excavating was on site to solidify the drilling pits and start reclaiming the site. No violations at this time. |
| 1217621228 | 2008-07-23 | Drill / Deepen / Reopen | No Violations | J-M Water Service was on site to empty the drilling pits. The pits are fenced, lined and in good condition. |
| 1595766951 | 2008-07-02 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 has moved on site and will spud the well after the July 4 holiday. |
| 282642092 | 2009-4-16 0:00: | PL | No Violations |
For data sources see[9]