X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-45793"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-45793
 
| Well ID: 37-121-45793
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.379569, -79.764356 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.379569, -79.764356 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: DEEP HOLLOW 3421
+
| Farm/Lease Name: DEEP HOLLOW
 
|-
 
|-
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/09/2015
+
| Spud Date: 2015-02-09
 
|-
 
|-
| Permit Date: 11/3/2014
+
| Permit Date: 2014-11-03
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.379569
 
| Latitude: 41.379569
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-11-03
 +
| New Permit Application
 +
|-
 +
| 2015-02-09
 +
| Performed Spud Operation
 +
|-
 +
| 2015-02-11
 +
| Drilling Completion
 +
|-
 +
| 2016-08-01
 +
| Perforation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2016-08-02
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2016-08-18
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 1
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 3,500
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 2
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 500
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 3
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,500
 +
| style="text-align: right;" | 3,000
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 4
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 2,700
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 5
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2,400
 +
| style="text-align: right;" | 3,100
 +
|-
 +
| 2016-08-02
 +
| style="text-align: right;" | 6
 +
| Sand
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 2,000
 +
| style="text-align: right;" | 2,900
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 192:
 
|-
 
|-
 
| 2015
 
| 2015
| style="text-align: right;" |
+
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
| style="text-align: right;" | 1,419.57
+
| style="text-align: right;" | 1419.57
 
| style="text-align: right;" | 213
 
| style="text-align: right;" | 213
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 471.68
 
| style="text-align: right;" | 471.68
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 286.05
 
| style="text-align: right;" | 286.05
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 106: Line 237:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 111: Line 243:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8.46 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 2,163.85 Bbl
 
| style="text-align: right;" | 2,163.85 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,163.85 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2016
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 7.69 Bbl
 
| style="text-align: right;" | 7.69 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 8.46 Bbl
 
| style="text-align: right;" | 8.46 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 3,451.83 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| style="text-align: right;" | 80.77 Bbl
| PA0101508
+
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 +
|  
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 64.62 Bbl
 
| style="text-align: right;" | 64.62 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 80.77 Bbl
+
| Produced Fluid
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|
 
|-
 
| 2017-0
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 11.54 Bbl
 
| style="text-align: right;" | 11.54 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 42.31 Bbl
+
| Produced Fluid
| ROAD SPREADING
+
| style="text-align: right;" | 3,451.83 Bbl
|
 
|-
 
| 2018-0
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,118.35 Bbl
 
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 157.69 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2018
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 46.92 Bbl
 
| style="text-align: right;" | 46.92 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
| 34-155-24079
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 21.08 Bbl
 
| style="text-align: right;" | 21.08 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 157.69 Bbl
+
| Produced Fluid
| PUBLIC SEWAGE TREATMENT PLANT
+
| style="text-align: right;" | 2,118.35 Bbl
| PA0023213
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 8.46 Bbl
 
| style="text-align: right;" | 8.46 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 155.38 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 688.46 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D215BWAR
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 278.46 Bbl
 +
| PUBLIC SEWAGE TREATMENT PLANT
 +
| PA0023213
 +
|-
 +
| 2019
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.77 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| 001-A
 
|-
 
|-
 
|}
 
|}
Line 208: Line 395:
 
| 2343022
 
| 2343022
 
| Primary Facility
 
| Primary Facility
| 02/11/2015
+
| 2015-02-11
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 215: Line 402:
 
| 2348664
 
| 2348664
 
| Primary Facility
 
| Primary Facility
| 03/04/2015
+
| 2015-03-04
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 222: Line 409:
 
| 2414759
 
| 2414759
 
| Primary Facility
 
| Primary Facility
| 10/07/2015
+
| 2015-10-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 229: Line 416:
 
| 2416326
 
| 2416326
 
| Primary Facility
 
| Primary Facility
| 10/13/2015
+
| 2015-10-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 236: Line 423:
 
| 2422181
 
| 2422181
 
| Primary Facility
 
| Primary Facility
| 10/28/2015
+
| 2015-10-28
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 493:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 11:38, 15 May 2020

Well Details

Well ID: 37-121-45793
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Cranberry Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: DEEP HOLLOW
License Status: Active
Spud Date: 2015-02-09
Permit Date: 2014-11-03
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.379569
Longitude: -79.764356

For data sources see[1][2][3]

Well History

Date Event
2014-11-03 New Permit Application
2015-02-09 Performed Spud Operation
2015-02-11 Drilling Completion
2016-08-01 Perforation
2016-08-02 Performed Stage 1 of Stimulation
2016-08-02 Performed Stage 2 of Stimulation
2016-08-02 Performed Stage 3 of Stimulation
2016-08-02 Performed Stage 4 of Stimulation
2016-08-02 Performed Stage 5 of Stimulation
2016-08-02 Performed Stage 6 of Stimulation
2016-08-18 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-08-02 1 Sand 0 1,500 3,500
2016-08-02 2 Sand 0 1,500 500
2016-08-02 3 Sand 0 1,500 3,000
2016-08-02 4 Sand 0 2,000 2,700
2016-08-02 5 Sand 0 2,400 3,100
2016-08-02 6 Sand 0 2,000 2,900

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 1419.57 213 0.00 0
2017 CATALYST ENERGY INC 0.00 0 471.68 365 0.00 0
2018 CATALYST ENERGY INC 0.00 0 286.05 365 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 CATALYST ENERGY INC Produced Fluid 8.46 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 2,163.85 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 7.69 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 8.46 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 80.77 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2017 CATALYST ENERGY INC Produced Fluid 64.62 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 11.54 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CATALYST ENERGY INC Produced Fluid 3,451.83 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 157.69 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 46.92 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 CATALYST ENERGY INC Produced Fluid 21.08 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 2,118.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 CATALYST ENERGY INC Produced Fluid 8.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 CATALYST ENERGY INC Produced Fluid 155.38 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 CATALYST ENERGY INC Produced Fluid 688.46 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 CATALYST ENERGY INC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 278.46 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2019 CATALYST ENERGY INC Produced Fluid 50.77 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2343022 Primary Facility 2015-02-11 Administrative/File Review No Violations Noted
2348664 Primary Facility 2015-03-04 Administrative/File Review No Violations Noted
2414759 Primary Facility 2015-10-07 Routine/Complete Inspection No Violations Noted
2416326 Primary Facility 2015-10-13 Routine/Complete Inspection No Violations Noted
2422181 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2506768 Primary Facility 2016-08-02 Drilling/Alteration No Violations Noted
2509767 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted
2510792 Primary Facility 2016-08-16 Administrative/File Review No Violations Noted
2658152 Primary Facility 2017-11-07 Site Restoration No Violations Noted Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative coverage and is stable. There are no E&S issues. The site is considered restored.
2767554 Primary Facility 2018-08-24 Routine/Complete Inspection No Violations Noted Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. There is a tank battery located at the well site that appears in good shape housing three 210 bbl. steel tanks and a 100 bbl. fiber glass tank. There is also a lower tank battery that houses a 50 bbl. poly tank and a 50 bbl. steel tank. The site is stable with no E&S issues.

For data sources see[8]

References