If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-27729 | | Well ID: 37-125-27729 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.097597, -80.130958 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 17: | Line 17: | ||
| Well Pad ID: [[153033]] | | Well Pad ID: [[153033]] | ||
|- | |- | ||
− | | Farm/Lease Name: FOWLER | + | | Farm/Lease Name: FOWLER |
|- | |- | ||
| License Status: Active | | License Status: Active | ||
Line 24: | Line 24: | ||
|- | |- | ||
| Permit Date: 2015-10-02 | | Permit Date: 2015-10-02 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 40.097597 | | Latitude: 40.097597 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2015-10-02 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2015-10-21 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2015-11-30 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-01-27 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-03-13 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-13 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Performed Stage 8 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | Performed Stage 9 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | Performed Stage 10 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | Performed Stage 11 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | Performed Stage 12 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | Performed Stage 13 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | Performed Stage 14 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | Performed Stage 15 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | Performed Stage 16 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | Performed Stage 17 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Performed Stage 18 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Performed Stage 19 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Performed Stage 20 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Performed Stage 21 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | Performed Stage 22 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | Performed Stage 23 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | Performed Stage 24 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | Performed Stage 25 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | Performed Stage 26 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Performed Stage 27 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Performed Stage 28 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Performed Stage 29 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Performed Stage 30 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | Performed Stage 31 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Performed Stage 32 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Performed Stage 33 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Performed Stage 34 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Performed Stage 35 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | Performed Stage 36 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Performed Stage 37 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Performed Stage 38 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Performed Stage 39 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Performed Stage 40 of Stimulation | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | Performed Stage 41 of Stimulation | ||
+ | |- | ||
+ | | 2018-07-17 | ||
+ | | Deviated | ||
+ | |- | ||
+ | | 2018-07-17 | ||
+ | | Newly Drilled | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 74: | Line 260: | ||
|}--> | |}--> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2016-03-13 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,141 | ||
+ | | style="text-align: right;" | 5,648 | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,965 | ||
+ | | style="text-align: right;" | 5,951 | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,248 | ||
+ | | style="text-align: right;" | 5,654 | ||
+ | |- | ||
+ | | 2016-03-14 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,161 | ||
+ | | style="text-align: right;" | 5,983 | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,228 | ||
+ | | style="text-align: right;" | 5,875 | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,193 | ||
+ | | style="text-align: right;" | 5,761 | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,115 | ||
+ | | style="text-align: right;" | 5,779 | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | style="text-align: right;" | 8 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,158 | ||
+ | | style="text-align: right;" | 5,865 | ||
+ | |- | ||
+ | | 2016-03-15 | ||
+ | | style="text-align: right;" | 9 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,101 | ||
+ | | style="text-align: right;" | 5,497 | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | style="text-align: right;" | 10 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,065 | ||
+ | | style="text-align: right;" | 5,851 | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | style="text-align: right;" | 11 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,090 | ||
+ | | style="text-align: right;" | 5,611 | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | style="text-align: right;" | 12 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,301 | ||
+ | | style="text-align: right;" | 5,743 | ||
+ | |- | ||
+ | | 2016-03-16 | ||
+ | | style="text-align: right;" | 13 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,045 | ||
+ | | style="text-align: right;" | 5,808 | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | style="text-align: right;" | 14 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,019 | ||
+ | | style="text-align: right;" | 5,847 | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,882 | ||
+ | | style="text-align: right;" | 5,887 | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | style="text-align: right;" | 16 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,081 | ||
+ | | style="text-align: right;" | 6,155 | ||
+ | |- | ||
+ | | 2016-03-17 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,016 | ||
+ | | style="text-align: right;" | 5,775 | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | style="text-align: right;" | 18 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,166 | ||
+ | | style="text-align: right;" | 6,176 | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | style="text-align: right;" | 19 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,161 | ||
+ | | style="text-align: right;" | 5,722 | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | style="text-align: right;" | 20 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,947 | ||
+ | | style="text-align: right;" | 5,908 | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | style="text-align: right;" | 21 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,995 | ||
+ | | style="text-align: right;" | 6,115 | ||
+ | |- | ||
+ | | 2016-03-18 | ||
+ | | style="text-align: right;" | 22 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,071 | ||
+ | | style="text-align: right;" | 5,801 | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,139 | ||
+ | | style="text-align: right;" | 5,779 | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | style="text-align: right;" | 24 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,059 | ||
+ | | style="text-align: right;" | 5,869 | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | style="text-align: right;" | 25 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,146 | ||
+ | | style="text-align: right;" | 6,148 | ||
+ | |- | ||
+ | | 2016-03-19 | ||
+ | | style="text-align: right;" | 26 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,063 | ||
+ | | style="text-align: right;" | 5,779 | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | style="text-align: right;" | 27 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,993 | ||
+ | | style="text-align: right;" | 6,037 | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | style="text-align: right;" | 28 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,145 | ||
+ | | style="text-align: right;" | 6,123 | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | style="text-align: right;" | 29 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,995 | ||
+ | | style="text-align: right;" | 6,115 | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,023 | ||
+ | | style="text-align: right;" | 6,294 | ||
+ | |- | ||
+ | | 2016-03-20 | ||
+ | | style="text-align: right;" | 31 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,011 | ||
+ | | style="text-align: right;" | 6,141 | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | style="text-align: right;" | 32 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,008 | ||
+ | | style="text-align: right;" | 5,829 | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | style="text-align: right;" | 33 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,739 | ||
+ | | style="text-align: right;" | 6,090 | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | style="text-align: right;" | 34 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,851 | ||
+ | | style="text-align: right;" | 6,187 | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | style="text-align: right;" | 35 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,894 | ||
+ | | style="text-align: right;" | 5,926 | ||
+ | |- | ||
+ | | 2016-03-21 | ||
+ | | style="text-align: right;" | 36 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,964 | ||
+ | | style="text-align: right;" | 5,958 | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | style="text-align: right;" | 37 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,051 | ||
+ | | style="text-align: right;" | 6,001 | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | style="text-align: right;" | 38 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,855 | ||
+ | | style="text-align: right;" | 6,137 | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | style="text-align: right;" | 39 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,677 | ||
+ | | style="text-align: right;" | 6,434 | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | style="text-align: right;" | 40 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 9,161 | ||
+ | | style="text-align: right;" | 6,741 | ||
+ | |- | ||
+ | | 2016-03-22 | ||
+ | | style="text-align: right;" | 41 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 7,776,426 | ||
+ | | style="text-align: right;" | 8,943 | ||
+ | | style="text-align: right;" | 6,952 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 123: | Line 612: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,384,931.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 365 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 148: | Line 637: | ||
| 2015 | | 2015 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | + | | Drilling Fluid Waste | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drilling Fluid Waste | ||
| style="text-align: right;" | 577.00 Bbl | | style="text-align: right;" | 577.00 Bbl | ||
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
Line 162: | Line 644: | ||
| 2015 | | 2015 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | + | | Drill Cuttings | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drill Cuttings | ||
| style="text-align: right;" | 254.20 Tons | | style="text-align: right;" | 254.20 Tons | ||
| RESIDUAL WASTE TRANSFER FACILITY | | RESIDUAL WASTE TRANSFER FACILITY | ||
Line 176: | Line 651: | ||
| 2015 | | 2015 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 247.74 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
|- | |- | ||
− | | | + | | 2015 |
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 164.00 Bbl |
− | | | + | | REUSE OTHER THAN ROAD SPREADING |
− | | | + | | |
|- | |- | ||
− | | | + | | 2015 |
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 22.17 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100172 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Drill Cuttings |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 12.09 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | PAD059087072 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 87.00 Bbl |
− | | | + | | REUSE OTHER THAN ROAD SPREADING |
− | | | + | | |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 369.34 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 218: | Line 693: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 766.42 Bbl |
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Waste Water Treatment Sludge | ||
+ | | style="text-align: right;" | 0.32 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100663 | | 100663 | ||
Line 225: | Line 707: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | 21 | + | | style="text-align: right;" | 1.96 Bbl |
− | | | + | | LANDFILL |
− | | | + | | 100172 |
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 499.21 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Drill Cuttings | + | | Drill Cuttings |
| style="text-align: right;" | 232.64 Tons | | style="text-align: right;" | 232.64 Tons | ||
| RESIDUAL WASTE TRANSFER FACILITY | | RESIDUAL WASTE TRANSFER FACILITY | ||
Line 239: | Line 728: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 66.92 Bbl |
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Servicing Fluid | ||
+ | | style="text-align: right;" | 5.49 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100592 | | 100592 | ||
Line 246: | Line 742: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Fracturing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 17,538.38 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 253: | Line 749: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 788.67 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
| WMGR123SW019 | | WMGR123SW019 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 37.00 Bbl |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) |
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,287.43 Bbl |
− | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | |
− | + | | WMGR123SW005 | |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Fracturing Fluid Waste | + | | Fracturing Fluid Waste |
| style="text-align: right;" | 22.00 Bbl | | style="text-align: right;" | 22.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
Line 288: | Line 777: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Fracturing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3,982.09 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
| WMGR123SW019 | | WMGR123SW019 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Fracturing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 16.67 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100592 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Drilling Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 9.78 Bbl |
− | | | + | | LANDFILL |
− | | | + | | 100592 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 48.89 Bbl |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE PROCESSING FACILITY |
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | + | | Drill Cuttings | |
− | + | | style="text-align: right;" | 144.16 Tons | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | Drill Cuttings | ||
− | | style="text-align: right;" | | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Fracturing Fluid Waste |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 45.72 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 956.45 Bbl |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE PROCESSING FACILITY |
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 21,622.90 Bbl |
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
Line 351: | Line 833: | ||
| 2016 | | 2016 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Drill Cuttings | + | | Synthetic Liner Materials |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 15.40 Tons |
+ | | LANDFILL | ||
+ | | 100663 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 203.58 Tons | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100172 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 124.39 Bbl | | style="text-align: right;" | 124.39 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 365: | Line 854: | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 77.68 Bbl |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123SW005 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 194.16 Bbl | | style="text-align: right;" | 194.16 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
Line 379: | Line 868: | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | 1, | + | | style="text-align: right;" | 1,511.48 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
Line 393: | Line 875: | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Waste Water Treatment Sludge |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 3.10 Tons |
− | | RESIDUAL WASTE | + | | RESIDUAL WASTE TRANSFER FACILITY |
− | | | + | | 101532 |
|- | |- | ||
| 2017 | | 2017 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 8.45 Bbl | | style="text-align: right;" | 8.45 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW019 | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,863.18 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 23.22 Bbl | | style="text-align: right;" | 23.22 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 414: | Line 903: | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,071.99 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
Line 421: | Line 910: | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 23.48 Bbl | | style="text-align: right;" | 23.48 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
Line 428: | Line 917: | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 22.00 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
Line 435: | Line 924: | ||
| 2018 | | 2018 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 370.38 Bbl | | style="text-align: right;" | 370.38 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
Line 442: | Line 931: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 99.27 Bbl |
− | | | + | | SURFACE IMPOUNDMENT |
− | | | + | | 95-7-37312-19 |
|- | |- | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Other Oil & Gas Wastes | + | | Other Oil & Gas Wastes |
| style="text-align: right;" | 10.00 Bbl | | style="text-align: right;" | 10.00 Bbl | ||
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
Line 456: | Line 945: | ||
| 2019 | | 2019 | ||
| [[RICE DRILLING B LLC]] | | [[RICE DRILLING B LLC]] | ||
− | | Other Oil & Gas Wastes ( | + | | Other Oil & Gas Wastes |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 328.18 Bbl |
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,604.87 Bbl | ||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 20.65 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 98.63 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
|- | |- | ||
|} | |} |
Well ID: 37-125-27729 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.097597,"lon":-80.130958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153033 | |
Farm/Lease Name: FOWLER | |
License Status: Active | |
Spud Date: 2015-10-21 | |
Permit Date: 2015-10-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.097597 | |
Longitude: -80.130958 |
Date | Event |
---|---|
2015-10-02 | New Permit Application |
2015-10-21 | Performed Spud Operation |
2015-11-30 | Drilling Completion |
2016-01-27 | Drilling Completion |
2016-03-13 | Perforation |
2016-03-13 | Performed Stage 1 of Stimulation |
2016-03-14 | Perforation |
2016-03-14 | Performed Stage 2 of Stimulation |
2016-03-14 | Performed Stage 3 of Stimulation |
2016-03-14 | Performed Stage 4 of Stimulation |
2016-03-15 | Perforation |
2016-03-15 | Performed Stage 5 of Stimulation |
2016-03-15 | Performed Stage 6 of Stimulation |
2016-03-15 | Performed Stage 7 of Stimulation |
2016-03-15 | Performed Stage 8 of Stimulation |
2016-03-15 | Performed Stage 9 of Stimulation |
2016-03-16 | Perforation |
2016-03-16 | Performed Stage 10 of Stimulation |
2016-03-16 | Performed Stage 11 of Stimulation |
2016-03-16 | Performed Stage 12 of Stimulation |
2016-03-16 | Performed Stage 13 of Stimulation |
2016-03-17 | Perforation |
2016-03-17 | Performed Stage 14 of Stimulation |
2016-03-17 | Performed Stage 15 of Stimulation |
2016-03-17 | Performed Stage 16 of Stimulation |
2016-03-17 | Performed Stage 17 of Stimulation |
2016-03-18 | Perforation |
2016-03-18 | Performed Stage 18 of Stimulation |
2016-03-18 | Performed Stage 19 of Stimulation |
2016-03-18 | Performed Stage 20 of Stimulation |
2016-03-18 | Performed Stage 21 of Stimulation |
2016-03-18 | Performed Stage 22 of Stimulation |
2016-03-19 | Perforation |
2016-03-19 | Performed Stage 23 of Stimulation |
2016-03-19 | Performed Stage 24 of Stimulation |
2016-03-19 | Performed Stage 25 of Stimulation |
2016-03-19 | Performed Stage 26 of Stimulation |
2016-03-20 | Perforation |
2016-03-20 | Performed Stage 27 of Stimulation |
2016-03-20 | Performed Stage 28 of Stimulation |
2016-03-20 | Performed Stage 29 of Stimulation |
2016-03-20 | Performed Stage 30 of Stimulation |
2016-03-20 | Performed Stage 31 of Stimulation |
2016-03-21 | Perforation |
2016-03-21 | Performed Stage 32 of Stimulation |
2016-03-21 | Performed Stage 33 of Stimulation |
2016-03-21 | Performed Stage 34 of Stimulation |
2016-03-21 | Performed Stage 35 of Stimulation |
2016-03-21 | Performed Stage 36 of Stimulation |
2016-03-22 | Perforation |
2016-03-22 | Performed Stage 37 of Stimulation |
2016-03-22 | Performed Stage 38 of Stimulation |
2016-03-22 | Performed Stage 39 of Stimulation |
2016-03-22 | Performed Stage 40 of Stimulation |
2016-03-22 | Performed Stage 41 of Stimulation |
2018-07-17 | Deviated |
2018-07-17 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-03-13 | 1 | Silica Sand | 7,776,426 | 9,141 | 5,648 |
2016-03-14 | 2 | Silica Sand | 7,776,426 | 8,965 | 5,951 |
2016-03-14 | 3 | Silica Sand | 7,776,426 | 9,248 | 5,654 |
2016-03-14 | 4 | Silica Sand | 7,776,426 | 9,161 | 5,983 |
2016-03-15 | 5 | Silica Sand | 7,776,426 | 9,228 | 5,875 |
2016-03-15 | 6 | Silica Sand | 7,776,426 | 9,193 | 5,761 |
2016-03-15 | 7 | Silica Sand | 7,776,426 | 9,115 | 5,779 |
2016-03-15 | 8 | Silica Sand | 7,776,426 | 9,158 | 5,865 |
2016-03-15 | 9 | Silica Sand | 7,776,426 | 9,101 | 5,497 |
2016-03-16 | 10 | Silica Sand | 7,776,426 | 9,065 | 5,851 |
2016-03-16 | 11 | Silica Sand | 7,776,426 | 9,090 | 5,611 |
2016-03-16 | 12 | Silica Sand | 7,776,426 | 9,301 | 5,743 |
2016-03-16 | 13 | Silica Sand | 7,776,426 | 9,045 | 5,808 |
2016-03-17 | 14 | Silica Sand | 7,776,426 | 9,019 | 5,847 |
2016-03-17 | 15 | Silica Sand | 7,776,426 | 8,882 | 5,887 |
2016-03-17 | 16 | Silica Sand | 7,776,426 | 9,081 | 6,155 |
2016-03-17 | 17 | Silica Sand | 7,776,426 | 9,016 | 5,775 |
2016-03-18 | 18 | Silica Sand | 7,776,426 | 9,166 | 6,176 |
2016-03-18 | 19 | Silica Sand | 7,776,426 | 9,161 | 5,722 |
2016-03-18 | 20 | Silica Sand | 7,776,426 | 8,947 | 5,908 |
2016-03-18 | 21 | Silica Sand | 7,776,426 | 8,995 | 6,115 |
2016-03-18 | 22 | Silica Sand | 7,776,426 | 9,071 | 5,801 |
2016-03-19 | 23 | Silica Sand | 7,776,426 | 9,139 | 5,779 |
2016-03-19 | 24 | Silica Sand | 7,776,426 | 9,059 | 5,869 |
2016-03-19 | 25 | Silica Sand | 7,776,426 | 9,146 | 6,148 |
2016-03-19 | 26 | Silica Sand | 7,776,426 | 9,063 | 5,779 |
2016-03-20 | 27 | Silica Sand | 7,776,426 | 8,993 | 6,037 |
2016-03-20 | 28 | Silica Sand | 7,776,426 | 9,145 | 6,123 |
2016-03-20 | 29 | Silica Sand | 7,776,426 | 8,995 | 6,115 |
2016-03-20 | 30 | Silica Sand | 7,776,426 | 9,023 | 6,294 |
2016-03-20 | 31 | Silica Sand | 7,776,426 | 9,011 | 6,141 |
2016-03-21 | 32 | Silica Sand | 7,776,426 | 9,008 | 5,829 |
2016-03-21 | 33 | Silica Sand | 7,776,426 | 8,739 | 6,090 |
2016-03-21 | 34 | Silica Sand | 7,776,426 | 8,851 | 6,187 |
2016-03-21 | 35 | Silica Sand | 7,776,426 | 8,894 | 5,926 |
2016-03-21 | 36 | Silica Sand | 7,776,426 | 8,964 | 5,958 |
2016-03-22 | 37 | Silica Sand | 7,776,426 | 9,051 | 6,001 |
2016-03-22 | 38 | Silica Sand | 7,776,426 | 8,855 | 6,137 |
2016-03-22 | 39 | Silica Sand | 7,776,426 | 8,677 | 6,434 |
2016-03-22 | 40 | Silica Sand | 7,776,426 | 9,161 | 6,741 |
2016-03-22 | 41 | Silica Sand | 7,776,426 | 8,943 | 6,952 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 2,753,258.61 | 255 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,178,607.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,454,999.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,384,931.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 577.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 254.20 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 247.74 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Produced Fluid | 164.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 22.17 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 12.09 Tons | LANDFILL | PAD059087072 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 87.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 369.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 766.42 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 0.32 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 1.96 Bbl | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Produced Fluid | 499.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 232.64 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2016 | RICE DRILLING B LLC | Produced Fluid | 66.92 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 5.49 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 17,538.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 788.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 37.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2,287.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 22.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3,982.09 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 16.67 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 9.78 Bbl | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 144.16 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 45.72 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Produced Fluid | 956.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 21,622.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 15.40 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 203.58 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 124.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 77.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 194.16 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,511.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 3.10 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 8.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,863.18 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 23.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Produced Fluid | 1,071.99 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 23.48 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 370.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 99.27 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 328.18 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,604.87 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 20.65 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 98.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2418682 | Primary Facility | 2015-10-23 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig |
2424464 | Primary Facility | 2015-10-26 | Routine/Complete Inspection | No Violations Noted | On 10/26/15, I performed a routine complete inspection of the Fowler pad in response to an operator request for a preoperation inspection and made the following observations: |
2425049 | Primary Facility | 2015-10-29 | Preoperation Inspection | No Violations Noted | On 10/29/15, I performed a preoperation inspection for the Fowler site in response to a request from the operator and made the following observations: |
2426959 | Primary Facility | 2015-11-20 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2431522 | Primary Facility | 2015-12-07 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2435592 | Primary Facility | 2015-12-22 | Routine/Partial Inspection | No Violations Noted | On Tuesday December 22nd, 2015, I conducted a routine/partial inspection of the Fowler Well Site located in North Bethlehem Township, Washington County with John Parry (DEP) following an operator requested site meeting concerning potential modifications to the current permit. The following observations were made: |
2440786 | Primary Facility | 2015-12-31 | Follow-up Inspection | No Violations Noted | On 12/31/15, WQS Supervisor John Carson, Environmental Trainee John Parry, and I performed a follow up inspection at the Fowler Well Site in response to questions raised by the operator in regards to a 12/22/15 violation at the same site and made the following observations: |
2443279 | Primary Facility | 2016-01-22 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 1/22/2016. Currently nippling up and testing BOP’s. |
2446546 | Primary Facility | 2016-02-02 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
KOP was at 7196 ft. EOB on the curve was at 8229 ft. MD (7554 ft. TVD). TD was at 15,898 ft. MD (7527 ft. TVD) on 1/25/16. The 5 ½” casing was set at 15,890 ft. and cemented to surface with 10 bbls returned. |
2473589 | Primary Facility | 2016-03-31 | Administrative/File Review | In Compliance with Policy | An equipment malfunction caused some production water to be released onto containment. The containment had previously been vacuumed on March 30, 2016 due to recent heavy precipitation. The remaining rain water mixed with the production water within containment. On March 31, 2016, some heavy equipment inadvertently ran over the berm of the containment, thereby damaging it and releasing the estimated five gallon mixture of rain water and production water from containment and onto the pad. Their incident response team was notified and responded by vacuuming up the fluids and removing the impacted material for disposal. It was later estimated that three to four gallons of the mixed fluid had been released.
No impact to water had occurred. The incident was promptly reported to the Department and the area remediated. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time. |
2530325 | Primary Facility | 2016-10-13 | Incident- Response to Accident or Event | In Compliance with Policy | Incident response conducted in response to operator notification of a release. |
2536498 | Primary Facility | 2016-03-08 | Compliance Evaluation | No Violations Noted | On 3/8/16, I performed a follow up inspection at the Fowler site accompanied by DEP engineer Emmanuel Nwaobilo in response to previous violations noted on 12/22/15 and 12/31/15 and made the following observations:
•Site plans showing the updated access road were not present on site at the time of inspection. No violation, remediation requested. •A drainage culvert on the south side of the access road was poorly constructed and at the time of inspection allowing sediment laden water to leave the site. Remediation recommended, no violation. |
For data sources see[8]