If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-27729 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.097597,"lon":-80.130958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: North Bethlehem Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 153033 | |
Farm/Lease Name: FOWLER | |
License Status: Active | |
Spud Date: 2015-10-21 | |
Permit Date: 2015-10-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.097597 | |
Longitude: -80.130958 |
Date | Event |
---|---|
2015-10-02 | New Permit Application |
2015-10-21 | Performed Spud Operation |
2015-11-30 | Drilling Completion |
2016-01-27 | Drilling Completion |
2016-03-13 | Perforation |
2016-03-13 | Performed Stage 1 of Stimulation |
2016-03-14 | Perforation |
2016-03-14 | Performed Stage 2 of Stimulation |
2016-03-14 | Performed Stage 3 of Stimulation |
2016-03-14 | Performed Stage 4 of Stimulation |
2016-03-15 | Perforation |
2016-03-15 | Performed Stage 5 of Stimulation |
2016-03-15 | Performed Stage 6 of Stimulation |
2016-03-15 | Performed Stage 7 of Stimulation |
2016-03-15 | Performed Stage 8 of Stimulation |
2016-03-15 | Performed Stage 9 of Stimulation |
2016-03-16 | Perforation |
2016-03-16 | Performed Stage 10 of Stimulation |
2016-03-16 | Performed Stage 11 of Stimulation |
2016-03-16 | Performed Stage 12 of Stimulation |
2016-03-16 | Performed Stage 13 of Stimulation |
2016-03-17 | Perforation |
2016-03-17 | Performed Stage 14 of Stimulation |
2016-03-17 | Performed Stage 15 of Stimulation |
2016-03-17 | Performed Stage 16 of Stimulation |
2016-03-17 | Performed Stage 17 of Stimulation |
2016-03-18 | Perforation |
2016-03-18 | Performed Stage 18 of Stimulation |
2016-03-18 | Performed Stage 19 of Stimulation |
2016-03-18 | Performed Stage 20 of Stimulation |
2016-03-18 | Performed Stage 21 of Stimulation |
2016-03-18 | Performed Stage 22 of Stimulation |
2016-03-19 | Perforation |
2016-03-19 | Performed Stage 23 of Stimulation |
2016-03-19 | Performed Stage 24 of Stimulation |
2016-03-19 | Performed Stage 25 of Stimulation |
2016-03-19 | Performed Stage 26 of Stimulation |
2016-03-20 | Perforation |
2016-03-20 | Performed Stage 27 of Stimulation |
2016-03-20 | Performed Stage 28 of Stimulation |
2016-03-20 | Performed Stage 29 of Stimulation |
2016-03-20 | Performed Stage 30 of Stimulation |
2016-03-20 | Performed Stage 31 of Stimulation |
2016-03-21 | Perforation |
2016-03-21 | Performed Stage 32 of Stimulation |
2016-03-21 | Performed Stage 33 of Stimulation |
2016-03-21 | Performed Stage 34 of Stimulation |
2016-03-21 | Performed Stage 35 of Stimulation |
2016-03-21 | Performed Stage 36 of Stimulation |
2016-03-22 | Perforation |
2016-03-22 | Performed Stage 37 of Stimulation |
2016-03-22 | Performed Stage 38 of Stimulation |
2016-03-22 | Performed Stage 39 of Stimulation |
2016-03-22 | Performed Stage 40 of Stimulation |
2016-03-22 | Performed Stage 41 of Stimulation |
2018-07-17 | Deviated |
2018-07-17 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-03-13 | 1 | Silica Sand | 7,776,426 | 9,141 | 5,648 |
2016-03-14 | 2 | Silica Sand | 7,776,426 | 8,965 | 5,951 |
2016-03-14 | 3 | Silica Sand | 7,776,426 | 9,248 | 5,654 |
2016-03-14 | 4 | Silica Sand | 7,776,426 | 9,161 | 5,983 |
2016-03-15 | 5 | Silica Sand | 7,776,426 | 9,228 | 5,875 |
2016-03-15 | 6 | Silica Sand | 7,776,426 | 9,193 | 5,761 |
2016-03-15 | 7 | Silica Sand | 7,776,426 | 9,115 | 5,779 |
2016-03-15 | 8 | Silica Sand | 7,776,426 | 9,158 | 5,865 |
2016-03-15 | 9 | Silica Sand | 7,776,426 | 9,101 | 5,497 |
2016-03-16 | 10 | Silica Sand | 7,776,426 | 9,065 | 5,851 |
2016-03-16 | 11 | Silica Sand | 7,776,426 | 9,090 | 5,611 |
2016-03-16 | 12 | Silica Sand | 7,776,426 | 9,301 | 5,743 |
2016-03-16 | 13 | Silica Sand | 7,776,426 | 9,045 | 5,808 |
2016-03-17 | 14 | Silica Sand | 7,776,426 | 9,019 | 5,847 |
2016-03-17 | 15 | Silica Sand | 7,776,426 | 8,882 | 5,887 |
2016-03-17 | 16 | Silica Sand | 7,776,426 | 9,081 | 6,155 |
2016-03-17 | 17 | Silica Sand | 7,776,426 | 9,016 | 5,775 |
2016-03-18 | 18 | Silica Sand | 7,776,426 | 9,166 | 6,176 |
2016-03-18 | 19 | Silica Sand | 7,776,426 | 9,161 | 5,722 |
2016-03-18 | 20 | Silica Sand | 7,776,426 | 8,947 | 5,908 |
2016-03-18 | 21 | Silica Sand | 7,776,426 | 8,995 | 6,115 |
2016-03-18 | 22 | Silica Sand | 7,776,426 | 9,071 | 5,801 |
2016-03-19 | 23 | Silica Sand | 7,776,426 | 9,139 | 5,779 |
2016-03-19 | 24 | Silica Sand | 7,776,426 | 9,059 | 5,869 |
2016-03-19 | 25 | Silica Sand | 7,776,426 | 9,146 | 6,148 |
2016-03-19 | 26 | Silica Sand | 7,776,426 | 9,063 | 5,779 |
2016-03-20 | 27 | Silica Sand | 7,776,426 | 8,993 | 6,037 |
2016-03-20 | 28 | Silica Sand | 7,776,426 | 9,145 | 6,123 |
2016-03-20 | 29 | Silica Sand | 7,776,426 | 8,995 | 6,115 |
2016-03-20 | 30 | Silica Sand | 7,776,426 | 9,023 | 6,294 |
2016-03-20 | 31 | Silica Sand | 7,776,426 | 9,011 | 6,141 |
2016-03-21 | 32 | Silica Sand | 7,776,426 | 9,008 | 5,829 |
2016-03-21 | 33 | Silica Sand | 7,776,426 | 8,739 | 6,090 |
2016-03-21 | 34 | Silica Sand | 7,776,426 | 8,851 | 6,187 |
2016-03-21 | 35 | Silica Sand | 7,776,426 | 8,894 | 5,926 |
2016-03-21 | 36 | Silica Sand | 7,776,426 | 8,964 | 5,958 |
2016-03-22 | 37 | Silica Sand | 7,776,426 | 9,051 | 6,001 |
2016-03-22 | 38 | Silica Sand | 7,776,426 | 8,855 | 6,137 |
2016-03-22 | 39 | Silica Sand | 7,776,426 | 8,677 | 6,434 |
2016-03-22 | 40 | Silica Sand | 7,776,426 | 9,161 | 6,741 |
2016-03-22 | 41 | Silica Sand | 7,776,426 | 8,943 | 6,952 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 2,753,258.61 | 255 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 2,178,607.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,454,999.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,384,931.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 577.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 254.20 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2015 | RICE DRILLING B LLC | Drill Cuttings | 247.74 Tons | LANDFILL | 100663 |
2015 | RICE DRILLING B LLC | Produced Fluid | 164.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | RICE DRILLING B LLC | Drill Cuttings | 22.17 Tons | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 12.09 Tons | LANDFILL | PAD059087072 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 87.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 369.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 766.42 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 0.32 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 1.96 Bbl | LANDFILL | 100172 |
2016 | RICE DRILLING B LLC | Produced Fluid | 499.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 232.64 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2016 | RICE DRILLING B LLC | Produced Fluid | 66.92 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Servicing Fluid | 5.49 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 17,538.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Produced Fluid | 788.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 37.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2,287.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 22.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 3,982.09 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 16.67 Tons | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Drilling Fluid Waste | 9.78 Bbl | LANDFILL | 100592 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 48.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 144.16 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Fracturing Fluid Waste | 45.72 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Produced Fluid | 956.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 21,622.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Synthetic Liner Materials | 15.40 Tons | LANDFILL | 100663 |
2016 | RICE DRILLING B LLC | Drill Cuttings | 203.58 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 124.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 77.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 194.16 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,511.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 3.10 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 8.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1,863.18 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 23.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Produced Fluid | 1,071.99 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 23.48 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 370.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 99.27 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 328.18 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 1,604.87 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 20.65 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | RICE DRILLING B LLC | Produced Fluid | 98.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2418682 | Primary Facility | 2015-10-23 | Drilling/Alteration | No Violations Noted | Butch’s Rat Hole Service auger rig |
2424464 | Primary Facility | 2015-10-26 | Routine/Complete Inspection | No Violations Noted | On 10/26/15, I performed a routine complete inspection of the Fowler pad in response to an operator request for a preoperation inspection and made the following observations: |
2425049 | Primary Facility | 2015-10-29 | Preoperation Inspection | No Violations Noted | On 10/29/15, I performed a preoperation inspection for the Fowler site in response to a request from the operator and made the following observations: |
2426959 | Primary Facility | 2015-11-20 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2431522 | Primary Facility | 2015-12-07 | Drilling/Alteration | No Violations Noted | Falcon Drilling Rig #23 |
2435592 | Primary Facility | 2015-12-22 | Routine/Partial Inspection | No Violations Noted | On Tuesday December 22nd, 2015, I conducted a routine/partial inspection of the Fowler Well Site located in North Bethlehem Township, Washington County with John Parry (DEP) following an operator requested site meeting concerning potential modifications to the current permit. The following observations were made: |
2440786 | Primary Facility | 2015-12-31 | Follow-up Inspection | No Violations Noted | On 12/31/15, WQS Supervisor John Carson, Environmental Trainee John Parry, and I performed a follow up inspection at the Fowler Well Site in response to questions raised by the operator in regards to a 12/22/15 violation at the same site and made the following observations: |
2443279 | Primary Facility | 2016-01-22 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
Moved onto this well on 1/22/2016. Currently nippling up and testing BOP’s. |
2446546 | Primary Facility | 2016-02-02 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #349
KOP was at 7196 ft. EOB on the curve was at 8229 ft. MD (7554 ft. TVD). TD was at 15,898 ft. MD (7527 ft. TVD) on 1/25/16. The 5 ½” casing was set at 15,890 ft. and cemented to surface with 10 bbls returned. |
2473589 | Primary Facility | 2016-03-31 | Administrative/File Review | In Compliance with Policy | An equipment malfunction caused some production water to be released onto containment. The containment had previously been vacuumed on March 30, 2016 due to recent heavy precipitation. The remaining rain water mixed with the production water within containment. On March 31, 2016, some heavy equipment inadvertently ran over the berm of the containment, thereby damaging it and releasing the estimated five gallon mixture of rain water and production water from containment and onto the pad. Their incident response team was notified and responded by vacuuming up the fluids and removing the impacted material for disposal. It was later estimated that three to four gallons of the mixed fluid had been released.
No impact to water had occurred. The incident was promptly reported to the Department and the area remediated. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time. |
2530325 | Primary Facility | 2016-10-13 | Incident- Response to Accident or Event | In Compliance with Policy | Incident response conducted in response to operator notification of a release. |
2536498 | Primary Facility | 2016-03-08 | Compliance Evaluation | No Violations Noted | On 3/8/16, I performed a follow up inspection at the Fowler site accompanied by DEP engineer Emmanuel Nwaobilo in response to previous violations noted on 12/22/15 and 12/31/15 and made the following observations:
•Site plans showing the updated access road were not present on site at the time of inspection. No violation, remediation requested. •A drainage culvert on the south side of the access road was poorly constructed and at the time of inspection allowing sediment laden water to leave the site. Remediation recommended, no violation. |
For data sources see[8]