X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21700"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21700
 
| Well ID: 37-117-21700
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.779102, -77.090969 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.779103, -77.090969 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Tioga County, Pennsylvania|Tioga]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Richmond Township, Tioga County, Pennsylvania|Richmond Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Tioga_County,_Pennsylvania|Tioga]]
 +
|-
 +
| Municipality: [[Richmond Township,_Tioga_County,_Pennsylvania|Richmond Township]]
 
|-
 
|-
 
| Operator Name: [[SWEPI LP]]
 
| Operator Name: [[SWEPI LP]]
 
|-
 
|-
| Well Pad ID: [[151091|151091]]
+
| Well Pad ID:  
 
|-
 
|-
 
| Farm/Lease Name: TICE 653 1X
 
| Farm/Lease Name: TICE 653 1X
 
|-
 
|-
| First Permit Date: 2014-03-31
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2014-03-31
+
| Spud Date:  
 
|-
 
|-
| Spud Date:  
+
| Permit Date: 2014-03-31
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Configuration: Vertical
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status:
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 0
+
| Conservation: No
 
|-
 
|-
| Latitude: 41.779102
+
| Latitude: 41.779103
 
|-
 
|-
 
| Longitude: -77.090969
 
| Longitude: -77.090969
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-03-31
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
|}-->
 +
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2294722
 +
| Primary Facility
 +
| 2014-08-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The Department inspected the Tice 653, permit #ESX29-117-14-0003, in Richmond Township, Tioga Co. on 8/13/14 @ 0930 hours. The weather was 68 degrees, overcast with light showers. One small area on the outslope of unstabilized diversion berm 1 showed signs of erosion.  Both infiltration basin 1 & 2 have been constructed and appear to be functioning. All temporary BMP's appear to be constructed as shown in E&S control plan. Topsoil stockpiles are unstabilized. Pad surface has not been soil cemented. A conductivity reading from standing water in level spreader (LS-4) was 60 µs/cm with a pH of 6.5. The onsite contractor stated hydroseeding was planned for later today. This inspection complies with OGA §5258(a.1). No violations issued during this inspection.
 
|-
 
|-
 
|}
 
|}
== References ==
+
<!--==== Violations Commited ====
{{reflist}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 03:07, 16 May 2020

Well Details

Well ID: 37-117-21700
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Richmond Township
Operator Name: SWEPI LP
Well Pad ID:
Farm/Lease Name: TICE 653 1X
License Status:
Spud Date:
Permit Date: 2014-03-31
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.779103
Longitude: -77.090969

For data sources see[1][2][3]

Well History

Date Event
2014-03-31 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2294722 Primary Facility 2014-08-13 Routine/Complete Inspection No Violations Noted The Department inspected the Tice 653, permit #ESX29-117-14-0003, in Richmond Township, Tioga Co. on 8/13/14 @ 0930 hours. The weather was 68 degrees, overcast with light showers. One small area on the outslope of unstabilized diversion berm 1 showed signs of erosion. Both infiltration basin 1 & 2 have been constructed and appear to be functioning. All temporary BMP's appear to be constructed as shown in E&S control plan. Topsoil stockpiles are unstabilized. Pad surface has not been soil cemented. A conductivity reading from standing water in level spreader (LS-4) was 60 µs/cm with a pH of 6.5. The onsite contractor stated hydroseeding was planned for later today. This inspection complies with OGA §5258(a.1). No violations issued during this inspection.

For data sources see[5]

References