If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21700 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.779103,"lon":-77.090969,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Richmond Township | |
Operator Name: SWEPI LP | |
Well Pad ID: | |
Farm/Lease Name: TICE 653 1X | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.779103 | |
Longitude: -77.090969 |
Date | Event |
---|---|
2014-03-31 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2294722 | Primary Facility | 2014-08-13 | Routine/Complete Inspection | No Violations Noted | The Department inspected the Tice 653, permit #ESX29-117-14-0003, in Richmond Township, Tioga Co. on 8/13/14 @ 0930 hours. The weather was 68 degrees, overcast with light showers. One small area on the outslope of unstabilized diversion berm 1 showed signs of erosion. Both infiltration basin 1 & 2 have been constructed and appear to be functioning. All temporary BMP's appear to be constructed as shown in E&S control plan. Topsoil stockpiles are unstabilized. Pad surface has not been soil cemented. A conductivity reading from standing water in level spreader (LS-4) was 60 µs/cm with a pH of 6.5. The onsite contractor stated hydroseeding was planned for later today. This inspection complies with OGA §5258(a.1). No violations issued during this inspection. |
For data sources see[5]