X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37062"

m
 
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-37062
 
| Well ID: 37-063-37062
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.432891, -79.159908 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.432892, -79.159908 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[KRIEBEL MINERALS INC]]
+
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 
|-
 
|-
| First Permit Date: 2011-03-21
+
| Municipality: [[Burrell Township,_Indiana_County,_Pennsylvania|Burrell Township]]
 
|-
 
|-
| Last Permit Date: 2011-03-21
+
| Operator Name: [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 
|-
 
|-
| Spud Date: 2012-01-10
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: No
+
| Farm/Lease Name: SMITH DONALD 001
 
|-
 
|-
| Horizontal: No
+
| License Status:  
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 
|-
 
|-
| Latitude: 40.432891
+
| Permit Date: 2011-03-21
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 40.432892
 
|-
 
|-
 
| Longitude: -79.159908
 
| Longitude: -79.159908
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-03-21
 +
| New Permit Application
 +
|-
 +
| 2012-01-10
 +
| Performed Spud Operation
 +
|-
 +
| 2012-01-18
 +
| Drilling Completion
 +
|-
 +
| 2012-05-23
 +
| NEWLY DRILLED
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[KRIEBEL MINERALS INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[KRIEBEL MINERALS INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[KRIEBEL MINERALS INC]]
 +
| style="text-align: right;" | 3,576.00
 +
| style="text-align: right;" | 302
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-0
+
| 2013
| style="text-align:right;" | 5300.0
+
| [[KRIEBEL MINERALS INC]]
| style="text-align:right;" | 334.0
+
| style="text-align: right;" | 5,300.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 334
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[KRIEBEL MINERALS INC]]
 +
| style="text-align: right;" | 3,927.00
 +
| style="text-align: right;" | 327
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2015
| style="text-align:right;" | 3576.0
+
| [[KRIEBEL MINERALS INC]]
| style="text-align:right;" | 302.0
+
| style="text-align: right;" | 1,059.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 236
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[KRIEBEL MINERALS INC]]
 +
| style="text-align: right;" | 1,547.00
 +
| style="text-align: right;" | 335
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2017
| style="text-align:right;" | 0.0
+
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 5,592.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 333
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 3,865.00
 +
| style="text-align: right;" | 326
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2019
| style="text-align:right;" | 0.0
+
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3,184.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 330
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 2012
| DRILLING FLUID WASTE
+
| [[KRIEBEL MINERALS INC]]
| style="text-align:right;" | 187.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 1,510.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
|-
 
|-
 
| 2012-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 400.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2012
| 2012-0
+
| [[KRIEBEL MINERALS INC]]
| FRACING FLUID WASTE
+
| Drilling Fluid Waste
| style="text-align:right;" | 1510.0
+
| style="text-align: right;" | 400.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2012
| 2012-0
+
| [[KRIEBEL MINERALS INC]]
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste
| style="text-align:right;" | 187.0
+
| style="text-align: right;" | 187.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
 +
| 2015
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2015
| DRILLING FLUID WASTE
+
| [[KRIEBEL MINERALS INC]]
| style="text-align:right;" | 400.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 50.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2016
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 20.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2016
| FRACING FLUID WASTE
+
| [[KRIEBEL MINERALS INC]]
| style="text-align:right;" | 1510.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 20 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2024534
 
| 2024534
 +
| Primary Facility
 
| 2011-12-05
 
| 2011-12-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit was dug.
 
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit was dug.
|
 
|-
 
 
|-
 
|-
 
| 2026867
 
| 2026867
 +
| Primary Facility
 
| 2011-12-12
 
| 2011-12-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road.  Filter fence is currently located topographically down gradient of site pad.  No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet.  Intermediate pipe (7¿) was set at 1,525 feet and was cemented with 261 sks of Class A.  Plug was down at 9:20 pm on 12/9/11with 8 bbls return.  75 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface.  U.S. Energy was currently drilling at 2,810 feet for the production string.  The anticipated depth is 4,974 feet.
 
| U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road.  Filter fence is currently located topographically down gradient of site pad.  No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet.  Intermediate pipe (7¿) was set at 1,525 feet and was cemented with 261 sks of Class A.  Plug was down at 9:20 pm on 12/9/11with 8 bbls return.  75 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface.  U.S. Energy was currently drilling at 2,810 feet for the production string.  The anticipated depth is 4,974 feet.
|
 
|-
 
 
|-
 
|-
 
| 2026879
 
| 2026879
 +
| Primary Facility
 
| 2011-12-08
 
| 2011-12-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road.  Filter fence is currently located topographically down gradient of site pad.  No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 47¿ (sanded in place).  Water protection (9 5/8¿) was set at 422 ft. and cemented with 160 sks of Class A.  Plug was down at 8:37 am on 12/8/11with no return.  Water was recorded at 130 feet.  U.S. Energy was on standby until for the required 8 hrs. Cement time.
 
| U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road.  Filter fence is currently located topographically down gradient of site pad.  No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 47¿ (sanded in place).  Water protection (9 5/8¿) was set at 422 ft. and cemented with 160 sks of Class A.  Plug was down at 8:37 am on 12/8/11with no return.  Water was recorded at 130 feet.  U.S. Energy was on standby until for the required 8 hrs. Cement time.
|
 
|-
 
 
|-
 
|-
 
| 2033279
 
| 2033279
 +
| Primary Facility
 
| 2012-01-11
 
| 2012-01-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12.
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12.
|
 
|-
 
 
|-
 
|-
 
| 2034210
 
| 2034210
 +
| Primary Facility
 
| 2012-01-13
 
| 2012-01-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present.  E&S controls were present.  Conductor pipe (13 3/8¿) was set at 26 feet and sanded in.  Water protection pipe (9 5/8¿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return.  Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7¿) was set at 1,538 feet.  U. S. Energy was waiting for cement delivery.  Water levels were encountered at 65 feet and 400 feet.  Coal seams were recorded at 85¿to 90¿ and 665¿ to 670¿ intervals.
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present.  E&S controls were present.  Conductor pipe (13 3/8¿) was set at 26 feet and sanded in.  Water protection pipe (9 5/8¿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return.  Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7¿) was set at 1,538 feet.  U. S. Energy was waiting for cement delivery.  Water levels were encountered at 65 feet and 400 feet.  Coal seams were recorded at 85¿to 90¿ and 665¿ to 670¿ intervals.
|
 
|-
 
 
|-
 
|-
 
| 2035246
 
| 2035246
 +
| Primary Facility
 
| 2012-01-19
 
| 2012-01-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present.  E&S controls were present.  Intermediate pipe (7¿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return.  Production pipe was set at 4,639 feet.  U.S. Energy completed gas well and was moving to next site.
 
| Kriebel had contracted U.S Energy.  E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present.  E&S controls were present.  Intermediate pipe (7¿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return.  Production pipe was set at 4,639 feet.  U.S. Energy completed gas well and was moving to next site.
|
 
|-
 
 
|-
 
|-
 
| 2041224
 
| 2041224
 +
| Primary Facility
 
| 2012-01-30
 
| 2012-01-30
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of spud notification.
 
| Site visit was part of spud notification.
Access road was rocked and stable.
 
Culverts were installed as noted on E&S plan.
 
A corregated pipe was installed at the corner of the toe of slope near the access road.  It was not actively discharging during inspection.  It was also not noted on the E&S plan.
 
The site id sign was incorrect.  The permit number listed is invalid.
 
PA DEP Water Quality SPecialist April Weiland was present during inspection.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2152271
 
| 2152271
 +
| Primary Facility
 
| 2013-03-22
 
| 2013-03-22
| Indiana
+
| Site Restoration
| Burrell Twp
 
 
| No Violations Noted
 
| No Violations Noted
|-
+
| At time of inspection, well in production. Well tag present. Brine tank sound. Access road in excellent condition. Installed culverts appear maintained, structurally sound.
 
|-
 
|-
 
| 2206279
 
| 2206279
 +
| Primary Facility
 
| 2013-09-19
 
| 2013-09-19
| Indiana
+
| Routine/Complete Inspection
| Burrell Twp
 
 
| No Violations Noted
 
| No Violations Noted
 +
| At time of inspection, well equipped for production. Site has been restored and permanently stabilized. No accelerated erosion observed. Vegetation growth is adequate across site. Tank appears structurally sound. Access road in good condition. Well tag present.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 05:22, 16 May 2020

Well Details

Well ID: 37-063-37062
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Burrell Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: SMITH DONALD 001
License Status:
Spud Date:
Permit Date: 2011-03-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.432892
Longitude: -79.159908

For data sources see[1][2][3]

Well History

Date Event
2011-03-21 New Permit Application
2012-01-10 Performed Spud Operation
2012-01-18 Drilling Completion
2012-05-23 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 0.00 0 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 3,576.00 302 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 5,300.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 3,927.00 327 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 1,059.00 236 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 1,547.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 5,592.00 333 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 3,865.00 326 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 3,184.00 330 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 KRIEBEL MINERALS INC Fracing Fluid Waste 1,510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 KRIEBEL MINERALS INC Drilling Fluid Waste 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 KRIEBEL MINERALS INC Drilling Fluid Waste 187.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2015 KRIEBEL MINERALS INC Produced Fluid 50 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 KRIEBEL MINERALS INC Produced Fluid 50.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 20 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2024534 Primary Facility 2011-12-05 Drilling/Alteration No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit was dug.
2026867 Primary Facility 2011-12-12 Drilling/Alteration No Violations Noted U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Water was recorded at 130 feet. Intermediate pipe (7¿) was set at 1,525 feet and was cemented with 261 sks of Class A. Plug was down at 9:20 pm on 12/9/11with 8 bbls return. 75 sks of cement was grouted to the 9 5/8¿ pipe to bring the cement to surface. U.S. Energy was currently drilling at 2,810 feet for the production string. The anticipated depth is 4,974 feet.
2026879 Primary Facility 2011-12-08 Drilling/Alteration No Violations Noted U.S. Energy was contracted by Kriebel. Well sign and E&S plan located at the access road. Filter fence is currently located topographically down gradient of site pad. No freeboard issues. During site inspection, no E&S or IW issues at the site. Conductor pipe (13 3/8¿) was set at 47¿ (sanded in place). Water protection (9 5/8¿) was set at 422 ft. and cemented with 160 sks of Class A. Plug was down at 8:37 am on 12/8/11with no return. Water was recorded at 130 feet. U.S. Energy was on standby until for the required 8 hrs. Cement time.
2033279 Primary Facility 2012-01-11 Drilling/Alteration No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. U.S Energy was setting up the drilling rig at the site. Spud notification was submitted to DEP on 1/10/12.
2034210 Primary Facility 2012-01-13 Drilling/Alteration No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Conductor pipe (13 3/8¿) was set at 26 feet and sanded in. Water protection pipe (9 5/8¿) was set at 297 feet and was cemented with 105 sacks of Type I with 9 bbls return. Plug was down at 05:38 hours on 1/12/12. Intermediate pipe (7¿) was set at 1,538 feet. U. S. Energy was waiting for cement delivery. Water levels were encountered at 65 feet and 400 feet. Coal seams were recorded at 85¿to 90¿ and 665¿ to 670¿ intervals.
2035246 Primary Facility 2012-01-19 Drilling/Alteration No Violations Noted Kriebel had contracted U.S Energy. E&S plan and well sign were present. Spud notification was submitted to DEP on 1/10/12. At the time of inspection, no pit freeboard issues and no E&S concerns were present. E&S controls were present. Intermediate pipe (7¿) was set at 1,526 feet with 270 sacks of Type I with 9 bbls of return. Production pipe was set at 4,639 feet. U.S. Energy completed gas well and was moving to next site.
2041224 Primary Facility 2012-01-30 Routine/Complete Inspection No Violations Noted Site visit was part of spud notification.
2152271 Primary Facility 2013-03-22 Site Restoration No Violations Noted At time of inspection, well in production. Well tag present. Brine tank sound. Access road in excellent condition. Installed culverts appear maintained, structurally sound.
2206279 Primary Facility 2013-09-19 Routine/Complete Inspection No Violations Noted At time of inspection, well equipped for production. Site has been restored and permanently stabilized. No accelerated erosion observed. Vegetation growth is adequate across site. Tank appears structurally sound. Access road in good condition. Well tag present.

For data sources see[7]

References