X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28726"

m
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28726
 
| Well ID: 37-129-28726
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.365425, -79.480563 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.365419, -79.480597 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Salem Township, Westmoreland County, Pennsylvania|Salem Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Salem Township,_Westmoreland_County,_Pennsylvania|Salem Township]]
 +
|-
 +
| Operator Name: [[PENN VIEW EXPLORATION CORP]]
 
|-
 
|-
 
| Well Pad ID: [[148378]]
 
| Well Pad ID: [[148378]]
Line 14: Line 19:
 
| Farm/Lease Name: FRYE UNIT 14H
 
| Farm/Lease Name: FRYE UNIT 14H
 
|-
 
|-
| First Permit Date: 2012-01-11
+
| License Status:
 +
|-
 +
| Spud Date: 2012-01-20
 +
|-
 +
| Permit Date: 2012-01-11
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.365419
 +
|-
 +
| Longitude: -79.480597
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-01-11
 +
| New Permit Application
 +
|-
 +
| 2012-01-19
 +
| Performed Spud Operation
 +
|-
 +
| 2012-05-07
 +
| Drilling Completion
 +
|-
 +
| 2012-11-27
 +
| Perforation
 +
|-
 +
| 2012-11-27
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2012-12-01
 +
| Perforation
 +
|-
 +
| 2012-12-01
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2012-12-01
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2012-12-02
 +
| Perforation
 +
|-
 +
| 2012-12-02
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2012-12-03
 +
| Perforation
 +
|-
 +
| 2012-12-03
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2012-12-04
 +
| Perforation
 +
|-
 +
| 2012-12-04
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2012-12-05
 +
| Perforation
 +
|-
 +
| 2012-12-05
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2014-12-05
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2016-06-21
 +
| Deviated
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-11-14
 +
| 2012-11-14
 +
| style="text-align: right;" | 7,349
 +
| style="text-align: right;" | 3,032,892
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="13"| 1
 +
| rowspan="1"| Proppant (lbs)
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
|
 +
|
 +
| style="text-align: right;" | 11.22
 +
| style="text-align: right;" | 12.74
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00665000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6486A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00719000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume (gals)
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" | 88.78
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Biocide EC 6116A
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00728000
 +
| style="text-align: right;" |
 +
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00121000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FR-66 Friction Reducer
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| WG-36 GELLING AGENT
 +
| rowspan="1"| Halliburton Energy Services
 +
| rowspan="1"| Water Viscosifier
 +
| Guar gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00219000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| GBW-30 BREAKER
 +
| rowspan="2"| Halliburton Energy Services
 +
| rowspan="2"| Gel Breaker
 +
| Hemicellulase enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.00011000
 +
| style="text-align: right;" |
 +
|-
 +
| Carbohydrates
 +
|
 +
| style="text-align: right;" | 95.00
 +
| style="text-align: right;" | 0.00068000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 7.5 Hcl Acid
 +
| rowspan="1"|
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.24
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2012-11-27
 +
| style="text-align: right;" | 1
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,486
 +
| style="text-align: right;" | 9,209
 +
|-
 +
| 2012-12-01
 +
| style="text-align: right;" | 2
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 9,056
 +
| style="text-align: right;" | 9,703
 +
|-
 +
| 2012-12-01
 +
| style="text-align: right;" | 3
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,567
 +
| style="text-align: right;" | 9,295
 +
|-
 +
| 2012-12-02
 +
| style="text-align: right;" | 4
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,656
 +
| style="text-align: right;" | 9,304
 +
|-
 +
| 2012-12-03
 +
| style="text-align: right;" | 5
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,768
 +
| style="text-align: right;" | 9,467
 +
|-
 +
| 2012-12-04
 +
| style="text-align: right;" | 6
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,376
 +
| style="text-align: right;" | 9,338
 +
|-
 +
| 2012-12-05
 +
| style="text-align: right;" | 7
 +
| Ottawa Sand
 +
| style="text-align: right;" | 34,141
 +
| style="text-align: right;" | 8,055
 +
| style="text-align: right;" | 9,032
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 473,578.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 396,419.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 240,713.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 185,363.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 151,444.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 64,524.00
 +
| style="text-align: right;" | 212
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENN VIEW EXPLORATION CORP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 570.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 3.41 Tons
 +
| LANDFILL
 +
| 100434
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 2,999.30 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 72.43 Tons
 +
| LANDFILL
 +
| 073 114 654
 
|-
 
|-
| Last Permit Date: 2012-01-11
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,960.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| Spud Date: 2012-01-19
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,694.90 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| Unconventional: Yes
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| Horizontal: Yes
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 32,553.70 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| Producing: Yes
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 6.47 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID074259565
 
|-
 
|-
| Violations: None
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,578.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| Latitude: 40.365425
+
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 834.99 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| Longitude: -79.480563
+
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 260.35 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 353.34 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,540.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.01 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 208.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 112.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[PENN VIEW EXPLORATION CORP]]
 +
| Waste comment only
 +
| style="text-align: right;" | 0.00
 +
|
 +
|
 +
|-
 +
| 2019
 +
| [[PENN VIEW EXPLORATION CORP]]
 +
| Waste comment only
 +
| style="text-align: right;" | 0.00
 +
| NO VALUE REPORTED
 +
|
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2036199
 
| 2036199
 +
| Primary Facility
 
| 2012-01-23
 
| 2012-01-23
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well had been spudded, drilling was not ongoing at the time of the inspection.  Well pad construction ahd been completed, well stimulation impoundment construction was still underway.  All access road and site erosion controls had been implemented as outlined in the ESCGP.  There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.  The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
 
| Well had been spudded, drilling was not ongoing at the time of the inspection.  Well pad construction ahd been completed, well stimulation impoundment construction was still underway.  All access road and site erosion controls had been implemented as outlined in the ESCGP.  There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site.  The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
|
 
|-
 
 
|-
 
|-
 
| 2039248
 
| 2039248
 +
| Primary Facility
 
| 2012-01-31
 
| 2012-01-31
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Highlands Rig#2 Speedstar attempting to establish circulation on backside of 20" casing in preparation for cement job.
 
| Highlands Rig#2 Speedstar attempting to establish circulation on backside of 20" casing in preparation for cement job.
Discussed proposed casing plan w/Operator rep M. Dobbs.  M. Dobbs provided Operator contacts.  Discussed w/OGI Supervisor D. Stivanson whom had discussion w/Operator rep D. Smith revising proposed casing plan.  Operator to replace two (2) strings (20"/16") with one (1) string which will remain in compliance with Chapter 78-78.83.(h).  Operator to run water/coal protective string to +/- 800'.
 
Pit lined and freeboard maintained.
 
Inspection conducted w/OGI J. Branan.
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2045688
 
| 2045688
 +
| Primary Facility
 
| 2012-02-22
 
| 2012-02-22
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Highlands Rig#2 Speedstar.  At time of inspection, kick plugs set from 8237'-7737' and 7737'-7237'.  Pit lined and freeboard maintained.
 
| Highlands Rig#2 Speedstar.  At time of inspection, kick plugs set from 8237'-7737' and 7737'-7237'.  Pit lined and freeboard maintained.
Discussed 13H and 15H proposed casing plans w/Operator rep J. Rice.  Operator to consider replacing two (2) strings (20"/16") with one (1) string and in compliance with Chapter 78-78.83.(h).
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048793
 
| 2048793
 +
| Primary Facility
 
| 2012-03-06
 
| 2012-03-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.
 
| Waiting on rig to commence lateral drilling.  Pit lined and freeboard maintained.
|
 
|-
 
 
|-
 
|-
 
| 2055998
 
| 2055998
 +
| Primary Facility
 
| 2012-03-30
 
| 2012-03-30
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well top holed and waiting deep rig for horizontal drilling ; On pad with Frye 13H and 15H;
 
| Well top holed and waiting deep rig for horizontal drilling ; On pad with Frye 13H and 15H;
|
 
|-
 
 
|-
 
|-
 
| 2066498
 
| 2066498
 +
| Primary Facility
 
| 2012-05-10
 
| 2012-05-10
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Waiting on frac.  Pit lined and freeboard maintained.
 
| Waiting on frac.  Pit lined and freeboard maintained.
|
 
|-
 
 
|-
 
|-
 
| 2116921
 
| 2116921
 +
| Primary Facility
 
| 2012-11-20
 
| 2012-11-20
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site stable. No violations
 
| Site stable. No violations
|
 
|-
 
 
|-
 
|-
 
| 2129642
 
| 2129642
 +
| Primary Facility
 
| 2013-01-10
 
| 2013-01-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appears to be drilled and is actively being equipped for production.  The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|-
 +
| 2180093
 +
| Primary Facility
 +
| 2013-07-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well appears to be drilled and is actively being equipped for production.  The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 
| At the time of inspection the well appears to be drilled and is actively being equipped for production.  The Erosion and Sedimentation Plan was on site.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The perimeter E&S BMPs appear to properly installed and functioning properly.  Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
|
 
 
|-
 
|-
|}
+
| 2251080
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2014-03-06
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tanks appear to be in sound condition.  The Department notes that the site has been regraded, and mulched, however no growth observed.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2278649
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2014-06-16
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2366784
 +
| Primary Facility
 +
| 2015-04-28
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well operating and properly identified.
 
|-
 
|-
| 2012-1
+
| 2367098
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2015-05-05
| style="text-align:right;" | 0.0
+
| Site Restoration
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014.  At the time of inspection the well was drilled and equipped for production.  Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2518635
== Waste Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2016-09-12
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | TYPE
+
| No Violations Noted
!scope="col" | QUANTITY
+
| Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok.
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-1
+
| 2589326
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 2999.3
+
| 2017-05-02
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0253723
+
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2706116
 +
| Primary Facility
 +
| 2018-03-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues.
 
|-
 
|-
| 2012-1
+
| 2841192
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 570.0
+
| 2019-02-19
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good.
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 12:40, 16 May 2020

Well Details

Well ID: 37-129-28726
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID: 148378
Farm/Lease Name: FRYE UNIT 14H
License Status:
Spud Date: 2012-01-20
Permit Date: 2012-01-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.365419
Longitude: -79.480597

For data sources see[1][2][3]

Well History

Date Event
2012-01-11 New Permit Application
2012-01-19 Performed Spud Operation
2012-05-07 Drilling Completion
2012-11-27 Perforation
2012-11-27 Performed Stage 1 of Stimulation
2012-12-01 Perforation
2012-12-01 Performed Stage 2 of Stimulation
2012-12-01 Performed Stage 3 of Stimulation
2012-12-02 Perforation
2012-12-02 Performed Stage 4 of Stimulation
2012-12-03 Perforation
2012-12-03 Performed Stage 5 of Stimulation
2012-12-04 Perforation
2012-12-04 Performed Stage 6 of Stimulation
2012-12-05 Perforation
2012-12-05 Performed Stage 7 of Stimulation
2014-12-05 Performed Stage 7 of Stimulation
2016-06-21 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-14 2012-11-14 7,349 3,032,892

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant (lbs) Proppant 11.22 12.74
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00665000
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00719000
Clean Volume (gals) Carrier/Base Fluid 88.78 100.00
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
Biocide EC 6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00728000
Polyethylene glycol 25322-68-3 60.00 0.01
Dibromoacetonitrile 3252-43-5 5.00 0.00121000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00219000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00011000
Carbohydrates 95.00 0.00068000
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.24

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-11-27 1 Ottawa Sand 34,141 8,486 9,209
2012-12-01 2 Ottawa Sand 34,141 9,056 9,703
2012-12-01 3 Ottawa Sand 34,141 8,567 9,295
2012-12-02 4 Ottawa Sand 34,141 8,656 9,304
2012-12-03 5 Ottawa Sand 34,141 8,768 9,467
2012-12-04 6 Ottawa Sand 34,141 8,376 9,338
2012-12-05 7 Ottawa Sand 34,141 8,055 9,032

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 473,578.00 334 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 396,419.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 240,713.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 185,363.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 151,444.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 64,524.00 212 0.00 0 0.00 0
2019 PENN VIEW EXPLORATION CORP 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 570.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 3.41 Tons LANDFILL 100434
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 2,999.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 72.43 Tons LANDFILL 073 114 654
2013 CHEVRON APPALACHIA LLC Produced Fluid 1,960.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,694.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 58.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 32,553.70 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 6.47 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Produced Fluid 1,578.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 834.99 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 260.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 353.34 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 110.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 208.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 112.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 PENN VIEW EXPLORATION CORP Waste comment only 0.00
2019 PENN VIEW EXPLORATION CORP Waste comment only 0.00 NO VALUE REPORTED

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2036199 Primary Facility 2012-01-23 Routine/Complete Inspection No Violations Noted Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
2039248 Primary Facility 2012-01-31 Drilling/Alteration No Violations Noted Highlands Rig#2 Speedstar attempting to establish circulation on backside of 20" casing in preparation for cement job.
2045688 Primary Facility 2012-02-22 Drilling/Alteration No Violations Noted Highlands Rig#2 Speedstar. At time of inspection, kick plugs set from 8237'-7737' and 7737'-7237'. Pit lined and freeboard maintained.
2048793 Primary Facility 2012-03-06 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained.
2055998 Primary Facility 2012-03-30 Routine/Complete Inspection No Violations Noted Well top holed and waiting deep rig for horizontal drilling ; On pad with Frye 13H and 15H;
2066498 Primary Facility 2012-05-10 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2116921 Primary Facility 2012-11-20 Routine/Complete Inspection No Violations Noted Site stable. No violations
2129642 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2180093 Primary Facility 2013-07-02 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2251080 Primary Facility 2014-03-06 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2278649 Primary Facility 2014-06-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2366784 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2367098 Primary Facility 2015-05-05 Site Restoration No Violations Noted Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly.
2518635 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok.
2589326 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2706116 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues.
2841192 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good.

For data sources see[9]

References