If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28726 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.365419,"lon":-79.480597,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Salem Township | |
Operator Name: PENN VIEW EXPLORATION CORP | |
Well Pad ID: 148378 | |
Farm/Lease Name: FRYE UNIT 14H | |
License Status: | |
Spud Date: 2012-01-20 | |
Permit Date: 2012-01-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.365419 | |
Longitude: -79.480597 |
Date | Event |
---|---|
2012-01-11 | New Permit Application |
2012-01-19 | Performed Spud Operation |
2012-05-07 | Drilling Completion |
2012-11-27 | Perforation |
2012-11-27 | Performed Stage 1 of Stimulation |
2012-12-01 | Perforation |
2012-12-01 | Performed Stage 2 of Stimulation |
2012-12-01 | Performed Stage 3 of Stimulation |
2012-12-02 | Perforation |
2012-12-02 | Performed Stage 4 of Stimulation |
2012-12-03 | Perforation |
2012-12-03 | Performed Stage 5 of Stimulation |
2012-12-04 | Perforation |
2012-12-04 | Performed Stage 6 of Stimulation |
2012-12-05 | Perforation |
2012-12-05 | Performed Stage 7 of Stimulation |
2014-12-05 | Performed Stage 7 of Stimulation |
2016-06-21 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-14 | 2012-11-14 | 7,349 | 3,032,892 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Proppant (lbs) | Proppant | 11.22 | 12.74 | ||||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00665000 | ||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00719000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 88.78 | 100.00 | |||||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | |||
Biocide EC 6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00728000 | ||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00121000 | |||||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00219000 | ||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00011000 | ||
Carbohydrates | 95.00 | 0.00068000 | ||||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.24 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-11-27 | 1 | Ottawa Sand | 34,141 | 8,486 | 9,209 |
2012-12-01 | 2 | Ottawa Sand | 34,141 | 9,056 | 9,703 |
2012-12-01 | 3 | Ottawa Sand | 34,141 | 8,567 | 9,295 |
2012-12-02 | 4 | Ottawa Sand | 34,141 | 8,656 | 9,304 |
2012-12-03 | 5 | Ottawa Sand | 34,141 | 8,768 | 9,467 |
2012-12-04 | 6 | Ottawa Sand | 34,141 | 8,376 | 9,338 |
2012-12-05 | 7 | Ottawa Sand | 34,141 | 8,055 | 9,032 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 473,578.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 396,419.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 240,713.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 185,363.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 151,444.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 64,524.00 | 212 | 0.00 | 0 | 0.00 | 0 |
2019 | PENN VIEW EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 570.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 3.41 Tons | LANDFILL | 100434 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,999.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 72.43 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,960.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,694.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 32,553.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 6.47 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,578.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 834.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 260.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 353.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,540.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 110.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 208.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 112.33 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | PENN VIEW EXPLORATION CORP | Waste comment only | 0.00 | ||
2019 | PENN VIEW EXPLORATION CORP | Waste comment only | 0.00 | NO VALUE REPORTED |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2036199 | Primary Facility | 2012-01-23 | Routine/Complete Inspection | No Violations Noted | Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary. |
2039248 | Primary Facility | 2012-01-31 | Drilling/Alteration | No Violations Noted | Highlands Rig#2 Speedstar attempting to establish circulation on backside of 20" casing in preparation for cement job. |
2045688 | Primary Facility | 2012-02-22 | Drilling/Alteration | No Violations Noted | Highlands Rig#2 Speedstar. At time of inspection, kick plugs set from 8237'-7737' and 7737'-7237'. Pit lined and freeboard maintained. |
2048793 | Primary Facility | 2012-03-06 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. |
2055998 | Primary Facility | 2012-03-30 | Routine/Complete Inspection | No Violations Noted | Well top holed and waiting deep rig for horizontal drilling ; On pad with Frye 13H and 15H; |
2066498 | Primary Facility | 2012-05-10 | Drilling/Alteration | No Violations Noted | Waiting on frac. Pit lined and freeboard maintained. |
2116921 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | No Violations Noted | Site stable. No violations |
2129642 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2180093 | Primary Facility | 2013-07-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2251080 | Primary Facility | 2014-03-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. |
2278649 | Primary Facility | 2014-06-16 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. |
2366784 | Primary Facility | 2015-04-28 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2367098 | Primary Facility | 2015-05-05 | Site Restoration | No Violations Noted | Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly. |
2518635 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok. |
2589326 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. |
2706116 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues. |
2841192 | Primary Facility | 2019-02-19 | Routine/Complete Inspection | No Violations Noted | This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good. |
For data sources see[9]