| Well ID: 37-081-21279
 
| Well ID: 37-081-21279
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.346569, -76.958538 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.3464, -76.958889 | width=100% | height=100% }}
 
|-
 
|-
| Operator Name: [[INFLECTION ENERGY LLC]]
+
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Lycoming_County,_Pennsylvania|Lycoming]]
 +
|-
 +
| Municipality: [[Gamble Township,_Lycoming_County,_Pennsylvania|Gamble Township]]
 +
|-
 +
| Operator Name: [[INFLECTION ENERGY (PA) LLC]]
 
|-
 
|-
 
| Well Pad ID: [[149762]]
 
| Well Pad ID: [[149762]]
 
|-
 
|-
| First Permit Date: 2013-08-08
+
| Farm/Lease Name: STUNNER SMITH 3H
 +
|-
 +
| License Status: Plugged and Abandoned
 +
|-
 +
| Spud Date: 2013-08-20
 +
|-
 +
| Permit Date: 2013-08-08
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 41.3464
 +
|-
 +
| Longitude: -76.958889
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Skidded Rig
 +
|-
 +
| 2013-08-08
 +
| New Permit Application
 
|-
 
|-
| Last Permit Date: 2013-08-08
+
| 2013-08-19
 +
| Performed Spud Operation
 
|-
 
|-
| Spud Date: 2013-08-19
+
| 2013-10-23
 +
| Drilling Completion
 
|-
 
|-
| Unconventional: Yes
+
| 2016-12-13
 +
| New Permit Application
 
|-
 
|-
| Horizontal: No
+
| 2017-12-27
 +
| MOD
 
|-
 
|-
| Violations: None
+
| 2018-08-23
 +
| MOD
 
|-
 
|-
| Latitude: 41.346569
+
| 2018-10-24
 +
| Finished Plugging
 
|-
 
|-
| Longitude: -76.958538
+
| 2019-02-07
 +
| Fully Plugged
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2013
 +
| [[INFLECTION ENERGY LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2019
| style="text-align:right;" | 0.0
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 452,288.90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 58
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2013
!scope="col" | FACILITY STATE
+
| [[INFLECTION ENERGY LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 286.65 Tons
 +
| LANDFILL
 +
| 301626
 +
|-
 +
| 2014
 +
| [[INFLECTION ENERGY LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 286.65 Tons
 +
| LANDFILL
 +
| 301626
 +
|-
 +
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.38 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 265.01 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2018
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 140.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,604.64 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| WMGR123NC039
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 17.90 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,551.25 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 100.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 37.03 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8,854.46 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR119
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 4,357.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4.68 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,770.80 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,187.89 Tons
 +
| LANDFILL
 +
| 100955
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2019
 +
| [[INFLECTION ENERGY (PA) LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 37.03 Tons
 +
| LANDFILL
 +
| 100955
 
|-
 
|-
| 2013-2
+
| 2019
| DRILL CUTTINGS
+
| [[INFLECTION ENERGY (PA) LLC]]
| style="text-align:right;" | 286.65
+
| Filter Socks
| Tons
+
| style="text-align: right;" | 0.02 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2209514
 
| 2209514
 +
| Primary Facility
 
| 2013-10-02
 
| 2013-10-02
| Lycoming
+
| Routine/Complete Inspection
| Gamble Twp
 
 
| No Violations Noted
 
| No Violations Noted
|-
+
|  
 
|-
 
|-
 
| 2246457
 
| 2246457
 +
| Primary Facility
 
| 2014-02-19
 
| 2014-02-19
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2247495
 
| 2247495
 +
| Primary Facility
 
| 2014-02-20
 
| 2014-02-20
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2254933
 +
| Primary Facility
 +
| 2014-03-18
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2261497
 +
| Primary Facility
 +
| 2014-04-02
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| H&P 354 onsite drilling the 081-21286 well, modular tank onsite storing flowback.  No Vio.
 +
|-
 +
| 2299098
 +
| Primary Facility
 +
| 2014-08-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2435548
 +
| Primary Facility
 +
| 2015-12-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I arrived onsite at 09:16 for a routine inspection and found 6 wells on the pad with two in production.
 +
|-
 +
| 2461954
 +
| Primary Facility
 +
| 2016-03-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 7 wells spudded on site and a large above-ground water tank. There was a hose in place between the water tank and the produced water tanks on site. This well is top-holed with a nightcap. Water and ice in cellar, no bubbling. 2 surface x intermediate vents, 1 conductor x surface bent. Methane was not detected.  Note permiting and reporting discrepancies associated with other wells on this pad.
 +
|-
 +
| 2554404
 +
| Primary Facility
 +
| 2017-01-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Stunner Smith 3H (SS 3H), 081-21279: top-holed-only with nightcap. Three annular vents (2 – 13-3/8” x 9-5/8” vents and 1 – 20” x 13-3/8” vent). Methane was not detected at any of the vents.
 +
On 2/8/16 Inflection monitored pressure on the 9-5/8” casing. Pressure was 250 psi, and blew down in 15 minutes.
 +
There were no violations for the Stunner Smith 3H.
 +
|-
 +
| 2686983
 +
| Primary Facility
 +
| 2018-01-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Arrived at 13:15. Weather: warm, sunny, T¿s in upper 40s. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692¿ with a plug from 6648¿ to 6144. IC casing to 3018¿. SS 3H: TD 6621¿, IC casing to 3007. For both wells, methane was leaking (few bubbles, slow rate) from the join between the intermediate vent pipe and the intermediate casing (Altair 5X gas meter calibrated on 1/1/23/17). Notified Greg Malekos of the leaks. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. The surface hole locations for the plugged conductors were updated in eFACTS to address locational discrepancies observed in the field.
 +
|-
 +
| 2696676
 +
| Primary Facility
 +
| 2018-02-22
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| Arrived at 7:40. Weather: rainy, temperatures in low 40's. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. This is a follow up IR to see if methane is still leaking from the join between the intermediate vent pipe and the intermediate casing. It was. Will schedule follow-up with Inflection. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water.
 +
|-
 +
| 2700019
 +
| Primary Facility
 +
| 2018-03-01
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| Arrived at 11:00Weather: warm overcast. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. For the SS2H and SS3H, Previously methane had been leaking from the join between the intermediate vent pipe and the intermediate casing. This is a follow-up with Landon Vanorn and Brian Twigg to check on the pressure build after 66-1/2 hrs and obtain isotopic samples. SS 2H: final pressure: 37-1/2 psi on 0-100 analog gauge. Gas isotopic sample number: 20180301237102G acquired at 11:10. SS3H: final pressure: 5-1/2 psi on 0-100psi analog gauge. Gas isotopic sample: 20180301237103G.
 +
|-
 +
| 2806666
 +
| Primary Facility
 +
| 2018-11-14
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| A routine, post-plugging, inspection of the 2H and 3H original boreholes was conducted November 21, 2018. The operator has recently submitted a Certificate of Plugging for each of these original boreholes after both were plugged prior to reaching intended TD as part of a plug and skid event. At the time of inspection, the operator was on location. I inspected the wellbore, annular vents, and cellar of each well. We discussed the marker requirements on a plugged well; each well marker may say "Original borehole" to help clarify any future confusion. No obvious issues were observed at surface during this inspection.
 +
|-
 +
| 2817867
 +
| Primary Facility
 +
| 2018-12-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well was a spud conductor. Conductor casing had a steel plate covering it at time of inspection. Cellar was empty and clean. No violations were noted at time of inspection.
 +
|-
 +
| 2818958
 +
| Primary Facility
 +
| 2018-12-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.
 +
The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized.  No leaks or spills detected. No violations.
 +
|-
 +
| 2819626
 +
| Primary Facility
 +
| 2019-04-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Weather was 34° and sunny at time of inspection. Met with Inflection representative Greg Malekos on location. Rig was currently running in the hole with an 8 1/2" bit and 8 5/8" reamer to begin drilling the well bore for the 5 1/2" production casing. No violations were noted at time of inspection.
 +
|-
 +
| 2821518
 +
| Primary Facility
 +
| 2018-12-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 30° and cloudy at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Rig was currently drilling the 22" hole for the 18 5/8" surface casing. Rig was estimating to TD the surface casing hole at approximately 764'. They then intend to hang the casing and skid the rig to drill the surface casing holes for the 5H and the 11H. They will then skid back to the 10H and begin drilling the 17 1/2" hole for their intermediate casing. No violations were noted at time of inspection.
 +
|-
 +
| 2822738
 +
| Primary Facility
 +
| 2019-01-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well was covered with a steel plate at time of inspection. This well recently had the surface 18 5/8" casing cemented after the rig skidded back to the 10H to begin drilling the first intermediate. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. Rig will move back to drill subsequent strings. No violations were noted at time of inspection.
 +
|-
 +
| 2827939
 +
| Primary Facility
 +
| 2019-01-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 25° and sunny at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection.
 +
|-
 +
| 2835456
 +
| Primary Facility
 +
| 2019-02-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 37° and sunny at time of inspection. Met with Inflection representatives Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection.
 +
|-
 +
| 2840028
 +
| Primary Facility
 +
| 2019-02-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection.
 +
|-
 +
| 2840552
 +
| Primary Facility
 +
| 2019-02-14
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I met Ross Drnjevich of Inflection on the site.  H&P 521 on location, drilling the 2HN well at 8300'.  The chemical containment appeared to be in good condition, but also contained several inches of snow and ice.  The secondary containment for the mud tanks had been bolted on with wood strips on the inside of the containment in the back, approximately 4-5" down from the top.  Although it is unlikely that this brought the containment volume below 110% of the volume of the tanks, I still recommended to Ross that these liners be attached on the outside of the berms.  Meltwater had built up to 3-4" deep on the backside of the pad, and Ross told me he would have it vacced.
 +
|-
 +
| 2842006
 +
| Primary Facility
 +
| 2019-02-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather- 21 degrees and cloudy at time of inspection
 +
 +
Met with Inflexion representative Ross Drjnevitch on location. Rig was pumped fluid to clean the hole and was preparing to pull drill pipe to replace the tri-cone drill bit. When their bit trip in complete, they will drill to an estimated TD of 8300' and cement casing. No violations noted at time of inspection.
 +
|-
 +
| 2844548
 +
| Primary Facility
 +
| 2019-02-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. This well recently had its second intermediate drilled and cemented. The job log was reviewed and no discrepancies were noted at time of inspection. Well was shut in with a night cap. No violation at time of inspection.
 +
|-
 +
| 2849850
 +
| Primary Facility
 +
| 2019-03-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.
 +
|-
 +
| 2852771
 +
| Primary Facility
 +
| 2019-03-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 30 degrees and sunny. Met with Inflection representative Ross Drnjevich on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 01:49, 17 May 2020

Well Details

Well ID: 37-081-21279
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 149762
Farm/Lease Name: STUNNER SMITH 3H
License Status: Plugged and Abandoned
Spud Date: 2013-08-20
Permit Date: 2013-08-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.3464
Longitude: -76.958889

For data sources see[1][2][3]

Well History

Date Event
Skidded Rig
2013-08-08 New Permit Application
2013-08-19 Performed Spud Operation
2013-10-23 Drilling Completion
2016-12-13 New Permit Application
2017-12-27 MOD
2018-08-23 MOD
2018-10-24 Finished Plugging
2019-02-07 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 INFLECTION ENERGY LLC 0.00 0 0.00 0 0.00 0
2014 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2015 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2016 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2017 INFLECTION ENERGY (PA) LLC 0.00 0 0.00 0 0.00 0
2019 INFLECTION ENERGY (PA) LLC 452,288.90 58 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 INFLECTION ENERGY LLC Drill Cuttings 286.65 Tons LANDFILL 301626
2014 INFLECTION ENERGY LLC Drill Cuttings 286.65 Tons LANDFILL 301626
2018 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials 0.38 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Drill Cuttings 265.01 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 140.00 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 3,604.64 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials 17.90 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 1,551.25 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 100.00 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Soil Contaminated by Oil & Gas Related Spills 37.03 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 8,854.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 INFLECTION ENERGY (PA) LLC Drilling Fluid Waste 4,357.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 4.68 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Drilling Fluid Waste 1,770.80 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Drill Cuttings 1,187.89 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 INFLECTION ENERGY (PA) LLC Soil Contaminated by Oil 37.03 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Filter Socks 0.02 Tons LANDFILL 301626

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2209514 Primary Facility 2013-10-02 Routine/Complete Inspection No Violations Noted
2246457 Primary Facility 2014-02-19 Routine/Complete Inspection No Violations Noted
2247495 Primary Facility 2014-02-20 Drilling/Alteration No Violations Noted
2254933 Primary Facility 2014-03-18 Routine/Partial Inspection No Violations Noted
2261497 Primary Facility 2014-04-02 Routine/Partial Inspection No Violations Noted H&P 354 onsite drilling the 081-21286 well, modular tank onsite storing flowback. No Vio.
2299098 Primary Facility 2014-08-27 Routine/Complete Inspection No Violations Noted
2435548 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted I arrived onsite at 09:16 for a routine inspection and found 6 wells on the pad with two in production.
2461954 Primary Facility 2016-03-01 Routine/Complete Inspection No Violations Noted 7 wells spudded on site and a large above-ground water tank. There was a hose in place between the water tank and the produced water tanks on site. This well is top-holed with a nightcap. Water and ice in cellar, no bubbling. 2 surface x intermediate vents, 1 conductor x surface bent. Methane was not detected. Note permiting and reporting discrepancies associated with other wells on this pad.
2554404 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted Stunner Smith 3H (SS 3H), 081-21279: top-holed-only with nightcap. Three annular vents (2 – 13-3/8” x 9-5/8” vents and 1 – 20” x 13-3/8” vent). Methane was not detected at any of the vents.

On 2/8/16 Inflection monitored pressure on the 9-5/8” casing. Pressure was 250 psi, and blew down in 15 minutes. There were no violations for the Stunner Smith 3H.

2686983 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted Arrived at 13:15. Weather: warm, sunny, T¿s in upper 40s. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692¿ with a plug from 6648¿ to 6144. IC casing to 3018¿. SS 3H: TD 6621¿, IC casing to 3007. For both wells, methane was leaking (few bubbles, slow rate) from the join between the intermediate vent pipe and the intermediate casing (Altair 5X gas meter calibrated on 1/1/23/17). Notified Greg Malekos of the leaks. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. The surface hole locations for the plugged conductors were updated in eFACTS to address locational discrepancies observed in the field.
2696676 Primary Facility 2018-02-22 Follow-up Inspection No Violations Noted Arrived at 7:40. Weather: rainy, temperatures in low 40's. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. This is a follow up IR to see if methane is still leaking from the join between the intermediate vent pipe and the intermediate casing. It was. Will schedule follow-up with Inflection. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water.
2700019 Primary Facility 2018-03-01 Follow-up Inspection No Violations Noted Arrived at 11:00Weather: warm overcast. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. For the SS2H and SS3H, Previously methane had been leaking from the join between the intermediate vent pipe and the intermediate casing. This is a follow-up with Landon Vanorn and Brian Twigg to check on the pressure build after 66-1/2 hrs and obtain isotopic samples. SS 2H: final pressure: 37-1/2 psi on 0-100 analog gauge. Gas isotopic sample number: 20180301237102G acquired at 11:10. SS3H: final pressure: 5-1/2 psi on 0-100psi analog gauge. Gas isotopic sample: 20180301237103G.
2806666 Primary Facility 2018-11-14 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine, post-plugging, inspection of the 2H and 3H original boreholes was conducted November 21, 2018. The operator has recently submitted a Certificate of Plugging for each of these original boreholes after both were plugged prior to reaching intended TD as part of a plug and skid event. At the time of inspection, the operator was on location. I inspected the wellbore, annular vents, and cellar of each well. We discussed the marker requirements on a plugged well; each well marker may say "Original borehole" to help clarify any future confusion. No obvious issues were observed at surface during this inspection.
2817867 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well was a spud conductor. Conductor casing had a steel plate covering it at time of inspection. Cellar was empty and clean. No violations were noted at time of inspection.
2818958 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.

The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized. No leaks or spills detected. No violations.

2819626 Primary Facility 2019-04-01 Drilling/Alteration No Violations Noted Weather was 34° and sunny at time of inspection. Met with Inflection representative Greg Malekos on location. Rig was currently running in the hole with an 8 1/2" bit and 8 5/8" reamer to begin drilling the well bore for the 5 1/2" production casing. No violations were noted at time of inspection.
2821518 Primary Facility 2018-12-20 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Rig was currently drilling the 22" hole for the 18 5/8" surface casing. Rig was estimating to TD the surface casing hole at approximately 764'. They then intend to hang the casing and skid the rig to drill the surface casing holes for the 5H and the 11H. They will then skid back to the 10H and begin drilling the 17 1/2" hole for their intermediate casing. No violations were noted at time of inspection.
2822738 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well was covered with a steel plate at time of inspection. This well recently had the surface 18 5/8" casing cemented after the rig skidded back to the 10H to begin drilling the first intermediate. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. Rig will move back to drill subsequent strings. No violations were noted at time of inspection.
2827939 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted Weather was 25° and sunny at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection.
2835456 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted Weather was 37° and sunny at time of inspection. Met with Inflection representatives Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection.
2840028 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection.
2840552 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted I met Ross Drnjevich of Inflection on the site. H&P 521 on location, drilling the 2HN well at 8300'. The chemical containment appeared to be in good condition, but also contained several inches of snow and ice. The secondary containment for the mud tanks had been bolted on with wood strips on the inside of the containment in the back, approximately 4-5" down from the top. Although it is unlikely that this brought the containment volume below 110% of the volume of the tanks, I still recommended to Ross that these liners be attached on the outside of the berms. Meltwater had built up to 3-4" deep on the backside of the pad, and Ross told me he would have it vacced.
2842006 Primary Facility 2019-02-20 Routine/Complete Inspection No Violations Noted Weather- 21 degrees and cloudy at time of inspection

Met with Inflexion representative Ross Drjnevitch on location. Rig was pumped fluid to clean the hole and was preparing to pull drill pipe to replace the tri-cone drill bit. When their bit trip in complete, they will drill to an estimated TD of 8300' and cement casing. No violations noted at time of inspection.

2844548 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. This well recently had its second intermediate drilled and cemented. The job log was reviewed and no discrepancies were noted at time of inspection. Well was shut in with a night cap. No violation at time of inspection.
2849850 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.
2852771 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Weather was 30 degrees and sunny. Met with Inflection representative Ross Drnjevich on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.