If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21279 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3464,"lon":-76.958889,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: INFLECTION ENERGY (PA) LLC | |
Well Pad ID: 149762 | |
Farm/Lease Name: STUNNER SMITH 3H | |
License Status: Plugged and Abandoned | |
Spud Date: 2013-08-20 | |
Permit Date: 2013-08-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.3464 | |
Longitude: -76.958889 |
Date | Event |
---|---|
Skidded Rig | |
2013-08-08 | New Permit Application |
2013-08-19 | Performed Spud Operation |
2013-10-23 | Drilling Completion |
2016-12-13 | New Permit Application |
2017-12-27 | MOD |
2018-08-23 | MOD |
2018-10-24 | Finished Plugging |
2019-02-07 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | INFLECTION ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | INFLECTION ENERGY (PA) LLC | 452,288.90 | 58 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | INFLECTION ENERGY LLC | Drill Cuttings | 286.65 Tons | LANDFILL | 301626 |
2014 | INFLECTION ENERGY LLC | Drill Cuttings | 286.65 Tons | LANDFILL | 301626 |
2018 | INFLECTION ENERGY (PA) LLC | Synthetic Liner Materials | 0.38 Tons | LANDFILL | 100955 |
2018 | INFLECTION ENERGY (PA) LLC | Drill Cuttings | 265.01 Tons | LANDFILL | 100955 |
2018 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 140.00 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 3,604.64 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | INFLECTION ENERGY (PA) LLC | Synthetic Liner Materials | 17.90 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,551.25 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 100.00 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Soil Contaminated by Oil & Gas Related Spills | 37.03 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 8,854.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | INFLECTION ENERGY (PA) LLC | Drilling Fluid Waste | 4,357.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 4.68 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Drilling Fluid Waste | 1,770.80 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Drill Cuttings | 1,187.89 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | INFLECTION ENERGY (PA) LLC | Soil Contaminated by Oil | 37.03 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Filter Socks | 0.02 Tons | LANDFILL | 301626 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2209514 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2246457 | Primary Facility | 2014-02-19 | Routine/Complete Inspection | No Violations Noted | |
2247495 | Primary Facility | 2014-02-20 | Drilling/Alteration | No Violations Noted | |
2254933 | Primary Facility | 2014-03-18 | Routine/Partial Inspection | No Violations Noted | |
2261497 | Primary Facility | 2014-04-02 | Routine/Partial Inspection | No Violations Noted | H&P 354 onsite drilling the 081-21286 well, modular tank onsite storing flowback. No Vio. |
2299098 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | |
2435548 | Primary Facility | 2015-12-17 | Routine/Complete Inspection | No Violations Noted | I arrived onsite at 09:16 for a routine inspection and found 6 wells on the pad with two in production. |
2461954 | Primary Facility | 2016-03-01 | Routine/Complete Inspection | No Violations Noted | 7 wells spudded on site and a large above-ground water tank. There was a hose in place between the water tank and the produced water tanks on site. This well is top-holed with a nightcap. Water and ice in cellar, no bubbling. 2 surface x intermediate vents, 1 conductor x surface bent. Methane was not detected. Note permiting and reporting discrepancies associated with other wells on this pad. |
2554404 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Stunner Smith 3H (SS 3H), 081-21279: top-holed-only with nightcap. Three annular vents (2 – 13-3/8” x 9-5/8” vents and 1 – 20” x 13-3/8” vent). Methane was not detected at any of the vents.
On 2/8/16 Inflection monitored pressure on the 9-5/8” casing. Pressure was 250 psi, and blew down in 15 minutes. There were no violations for the Stunner Smith 3H. |
2686983 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | Arrived at 13:15. Weather: warm, sunny, T¿s in upper 40s. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692¿ with a plug from 6648¿ to 6144. IC casing to 3018¿. SS 3H: TD 6621¿, IC casing to 3007. For both wells, methane was leaking (few bubbles, slow rate) from the join between the intermediate vent pipe and the intermediate casing (Altair 5X gas meter calibrated on 1/1/23/17). Notified Greg Malekos of the leaks. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. The surface hole locations for the plugged conductors were updated in eFACTS to address locational discrepancies observed in the field. |
2696676 | Primary Facility | 2018-02-22 | Follow-up Inspection | No Violations Noted | Arrived at 7:40. Weather: rainy, temperatures in low 40's. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. This is a follow up IR to see if methane is still leaking from the join between the intermediate vent pipe and the intermediate casing. It was. Will schedule follow-up with Inflection. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. |
2700019 | Primary Facility | 2018-03-01 | Follow-up Inspection | No Violations Noted | Arrived at 11:00Weather: warm overcast. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. For the SS2H and SS3H, Previously methane had been leaking from the join between the intermediate vent pipe and the intermediate casing. This is a follow-up with Landon Vanorn and Brian Twigg to check on the pressure build after 66-1/2 hrs and obtain isotopic samples. SS 2H: final pressure: 37-1/2 psi on 0-100 analog gauge. Gas isotopic sample number: 20180301237102G acquired at 11:10. SS3H: final pressure: 5-1/2 psi on 0-100psi analog gauge. Gas isotopic sample: 20180301237103G. |
2806666 | Primary Facility | 2018-11-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A routine, post-plugging, inspection of the 2H and 3H original boreholes was conducted November 21, 2018. The operator has recently submitted a Certificate of Plugging for each of these original boreholes after both were plugged prior to reaching intended TD as part of a plug and skid event. At the time of inspection, the operator was on location. I inspected the wellbore, annular vents, and cellar of each well. We discussed the marker requirements on a plugged well; each well marker may say "Original borehole" to help clarify any future confusion. No obvious issues were observed at surface during this inspection. |
2817867 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well was a spud conductor. Conductor casing had a steel plate covering it at time of inspection. Cellar was empty and clean. No violations were noted at time of inspection. |
2818958 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.
The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized. No leaks or spills detected. No violations. |
2819626 | Primary Facility | 2019-04-01 | Drilling/Alteration | No Violations Noted | Weather was 34° and sunny at time of inspection. Met with Inflection representative Greg Malekos on location. Rig was currently running in the hole with an 8 1/2" bit and 8 5/8" reamer to begin drilling the well bore for the 5 1/2" production casing. No violations were noted at time of inspection. |
2821518 | Primary Facility | 2018-12-20 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Rig was currently drilling the 22" hole for the 18 5/8" surface casing. Rig was estimating to TD the surface casing hole at approximately 764'. They then intend to hang the casing and skid the rig to drill the surface casing holes for the 5H and the 11H. They will then skid back to the 10H and begin drilling the 17 1/2" hole for their intermediate casing. No violations were noted at time of inspection. |
2822738 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well was covered with a steel plate at time of inspection. This well recently had the surface 18 5/8" casing cemented after the rig skidded back to the 10H to begin drilling the first intermediate. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. Rig will move back to drill subsequent strings. No violations were noted at time of inspection. |
2827939 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | Weather was 25° and sunny at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection. |
2835456 | Primary Facility | 2019-02-05 | Routine/Complete Inspection | No Violations Noted | Weather was 37° and sunny at time of inspection. Met with Inflection representatives Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection. |
2840028 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection. |
2840552 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | I met Ross Drnjevich of Inflection on the site. H&P 521 on location, drilling the 2HN well at 8300'. The chemical containment appeared to be in good condition, but also contained several inches of snow and ice. The secondary containment for the mud tanks had been bolted on with wood strips on the inside of the containment in the back, approximately 4-5" down from the top. Although it is unlikely that this brought the containment volume below 110% of the volume of the tanks, I still recommended to Ross that these liners be attached on the outside of the berms. Meltwater had built up to 3-4" deep on the backside of the pad, and Ross told me he would have it vacced. |
2842006 | Primary Facility | 2019-02-20 | Routine/Complete Inspection | No Violations Noted | Weather- 21 degrees and cloudy at time of inspection
Met with Inflexion representative Ross Drjnevitch on location. Rig was pumped fluid to clean the hole and was preparing to pull drill pipe to replace the tri-cone drill bit. When their bit trip in complete, they will drill to an estimated TD of 8300' and cement casing. No violations noted at time of inspection. |
2844548 | Primary Facility | 2019-02-26 | Routine/Complete Inspection | No Violations Noted | Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. This well recently had its second intermediate drilled and cemented. The job log was reviewed and no discrepancies were noted at time of inspection. Well was shut in with a night cap. No violation at time of inspection. |
2849850 | Primary Facility | 2019-03-07 | Routine/Complete Inspection | No Violations Noted | Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection. |
2852771 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30 degrees and sunny. Met with Inflection representative Ross Drnjevich on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection. |
For data sources see[7]