X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21694"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-21694
 
| Well ID: 37-081-21694
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.396639, -77.008056 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.396639, -77.008056 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: ROSE VALLEY 56H 51728
 
| Farm/Lease Name: ROSE VALLEY 56H 51728
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
 
| Spud Date: 2018-09-10
 
| Spud Date: 2018-09-10
 
|-
 
|-
 
| Permit Date: 2017-09-08
 
| Permit Date: 2017-09-08
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.396639
 
| Latitude: 41.396639
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Deviated
 +
|-
 +
| 2017-09-08
 +
| New Permit Application
 +
|-
 +
| 2018-08-29
 +
| Permit Renewal Application
 +
|-
 +
| 2018-09-10
 +
| Performed Spud Operation
 +
|-
 +
| 2019-06-05
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1,375,681.74
| style="text-align: right;" | 0
+
| style="text-align: right;" | 129
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 112: Line 153:
 
| 2018
 
| 2018
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 119: Line 160:
 
| 2018
 
| 2018
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Drill Cuttings
 
| style="text-align: right;" | 44.48 Tons
 
| style="text-align: right;" | 44.48 Tons
 
| LANDFILL
 
| LANDFILL
Line 126: Line 167:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 5.00 Bbl
+
| style="text-align: right;" | 124.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW005
 
| WMGR123NW005
Line 133: Line 174:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid
| style="text-align: right;" | 1.80 Tons
+
| style="text-align: right;" | 10,920.40 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 964.20 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 940.60 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 382.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| WMGR123NC038
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 71.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D025BELK
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 64.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 200.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 123.70 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,694.00 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| WMGR123NC039
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,175.74 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 140: Line 244:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid
| style="text-align: right;" | 200.00 Bbl
+
| style="text-align: right;" | 1,281.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 36.52 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW011
+
| WMGR123NW005
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Drill Cuttings (in Tons) RWC 810
+
| Synthetic Liner Materials
| style="text-align: right;" | 173.05 Tons
+
| style="text-align: right;" | 13.44 Tons
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
Line 154: Line 265:
 
| 2019
 
| 2019
 
| [[SENECA RESOURCES CO LLC]]
 
| [[SENECA RESOURCES CO LLC]]
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Other Oil & Gas Wastes
| style="text-align: right;" | 396.00 Bbl
+
| style="text-align: right;" | 66.00 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| WMGR123NC039
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 330.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NW011
+
| WMGR123NC003
 +
|-
 +
| 2019
 +
| [[SENECA RESOURCES CO LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 1,018.60 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
 
|}
 
|}

Latest revision as of 02:30, 17 May 2020

Well Details

Well ID: 37-081-21694
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 154413
Farm/Lease Name: ROSE VALLEY 56H 51728
License Status:
Spud Date: 2018-09-10
Permit Date: 2017-09-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.396639
Longitude: -77.008056

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-09-08 New Permit Application
2018-08-29 Permit Renewal Application
2018-09-10 Performed Spud Operation
2019-06-05 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SENECA RESOURCES CO LLC 1,375,681.74 129 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SENECA RESOURCES CO LLC Produced Fluid 120.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Drill Cuttings 44.48 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 124.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 10,920.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 964.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 940.60 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 382.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 SENECA RESOURCES CO LLC Produced Fluid 71.00 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2019 SENECA RESOURCES CO LLC Produced Fluid 64.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Drilling Fluid Waste 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 123.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SENECA RESOURCES CO LLC Produced Fluid 6,694.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Drill Cuttings 1,175.74 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Produced Fluid 1,281.80 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 36.52 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 13.44 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 66.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 330.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 1,018.60 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2754782 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted Routine Inspection; 7/13/2018.

After entering the site we talked to Tom Umstead (Hawbaker) who was managing the site. We discussed the seeding and stabilization as well as the infiltration berm construction and stabilization. At the time of the inspection, the main cut/fill of the pad area was being constructed. A full spread of equipment was working and a water truck was applying water for dust suppression throughout the main work area and especially the haul truck path from the cut side down to the fill slope and back. Overall, the BMP's are being installed and applied properly. I appreciate the care used in installing the infiltration controls, stabilizing progressively (as the project continues), and the active use of dust control measures. Overall, the site is in good condition. No violations noted.

2763014 Primary Facility 2018-08-09 Preoperation Inspection No Violations Noted Pre-operational inspection; 8/9/2018.

I entered the site at 17:05 and talked to Tom Umstead (Hawbaker). Work was ongoing to establish the cut/fill and under-drain. The cut side was being drilled to be shot at the time of the inspection.

Recently, heavy rains far in excess of any design storm rate/volume have impacted the area and this site shows signs of some previous impacts. Sediment on perimeter E&S controls indicates that they have overtopped. An 8" HDPE pipe was used as a drain at one location where the silt sock overtopped to bypass the perimeter E&S controls. In addition, evidence suggest the northernmost bio-retention berm filled and breached as evidence by the volume of sediment behind the E&S controls. The E&S issues described above have been corrected onsite and the dead-end road immediately north and east of the fill slope (outside the LOD) has been recently rock-lined, and re-vegetated. They plan to hydro-seed exposed soils on the fill slope and on the bio-retention berms on 8/10/2018. No vi

2773829 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Weather was 67° and raining at time of inspection. Met with Seneca representative Scott Barr on location. Conductor was set and cemented the previous day. Good returns to surface were noted. A welder was on location cutting off the top of the casing and installing an insert for the drilling rig to nipple up on. No violations were noted at time of inspection.
2839405 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Weather was 48° and sunny at time of inspection. Met with Seneca representative Jason Bence. Well is a spud conductor. Well was covered with a top hole rig at time of inspection. Top ho,e rig was drilling the 52H. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection.
2844710 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Weather was 24 degrees and sunny at time of inspection. Met with Seneca representative Jason Bentz on location. Drilling has just started the 17.5' hole for the surface casing. Estimated TD is 620'. No violations noted at time of inspection.

For data sources see[7]

References