X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30671"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30671
 
| Well ID: 37-005-30671
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.622906, -79.361167 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.622906, -79.361167 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: G TOY 2
 
| Farm/Lease Name: G TOY 2
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-10-06
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2010-06-21
 
| Permit Date: 2010-06-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.622906
 
| Latitude: 40.622906
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-06-21
 +
| New Permit Application
 +
|-
 +
| 2010-10-06
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 92:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 160: Line 192:
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
 
| style="text-align: right;" | 1,090.13
 
| style="text-align: right;" | 1,090.13
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 1,004.36
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 184: Line 225:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 480.00 Bbl
+
| style="text-align: right;" | 1,520.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 191: Line 232:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,520.00 Bbl
+
| style="text-align: right;" | 55.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 198: Line 239:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 55.00 Bbl
+
| style="text-align: right;" | 480.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 205: Line 246:
 
| 2011
 
| 2011
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 212: Line 253:
 
| 2012
 
| 2012
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 219: Line 260:
 
| 2017
 
| 2017
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 07:51, 21 May 2020

Well Details

Well ID: 37-005-30671
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Bend Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: G TOY 2
License Status:
Spud Date:
Permit Date: 2010-06-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.622906
Longitude: -79.361167

For data sources see[1][2][3]

Well History

Date Event
2010-06-21 New Permit Application
2010-10-06 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 3,637.00 334 0.00 0 0.00 0
2012 PENNECO OIL CO INC 2,436.00 366 0.00 0 0.00 0
2013 PENNECO OIL CO INC 1,778.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 1,443.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 1,326.24 365 0.00 0 0.00 0
2016 PENNECO OIL CO INC 1,201.91 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 1,082.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 1,090.13 365 0.00 0 0.00 0
2019 PENNECO OIL CO INC 1,004.36 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Fracing Fluid Waste 1,520.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Produced Fluid 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Drilling Fluid Waste 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 PENNECO OIL CO INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2017 PENNECO OIL CO INC Produced Fluid 55.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1918565 Primary Facility 2010-10-07 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Site erosion controls had been implemented as outlined in the E&S plan. Noted in the E&S plan there were inadequate erosion controls. Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road. Contacted operator representative Robert Carnahan regarding this matter. Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days. These actions should sufficiently address the access road concerns noted by WQS Higgins.
1920402 Primary Facility 2010-10-08 Drilling/Alteration No Violations Noted drilling - awaiting cement/E&S ok/ID&pit ok
1947311 Primary Facility 2011-02-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded. Observed no erosion or sedimentation issues in relation to the access road or well-site. The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria. In addition the operator should have the well tagged with the appropriate permit number as soon as possible.
1961081 Primary Facility 2011-03-25 Routine/Complete Inspection No Violations Noted Drilling complete. Well equipped for production. Site reclaimation underway. No open pits.
2125187 Primary Facility 2012-12-21 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2440529 Primary Facility 2016-01-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus open. Well head casing- meter set-100 bbl tank-equipment ok.

For data sources see[7]

References