X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30724"

m (Maintenance script moved page 42-005-30724 to 37-005-30724: -i0)
m
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-005-30724
+
| Well ID: 37-005-30724
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.789647, -79.600097 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.789647, -79.600097 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Municipality: [[North Buffalo Township,_Armstrong_County,_Pennsylvania|North Buffalo Township]]
 
|-
 
|-
| Municipality: [[North Buffalo Township, Armstrong County, Pennsylvania|North Buffalo Township]]
+
| Operator Name: [[SNYDER BROS INC]]
 
|-
 
|-
| Operator Name: [[SNYDER BROS INC|SNYDER BROS INC]]
+
| Well Pad ID: [[146265]]
 
|-
 
|-
 
| Farm/Lease Name: DONALD J ANTONACE ETUX 2M-50
 
| Farm/Lease Name: DONALD J ANTONACE ETUX 2M-50
 
|-
 
|-
| First Permit Date: 2010-10-26
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-10-26
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-01-27
+
| Permit Date: 2010-10-26
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: 1
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.789647
 
| Latitude: 40.789647
 
|-
 
|-
 
| Longitude: -79.600097
 
| Longitude: -79.600097
|-
 
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1947285
+
| 2010-10-26
| 2011-02-02
+
| New Permit Application
| No Violations Noted
 
| Drilling 8 3/4" hole at 1440' at time of inspection.  Proposed 1470' of 7" .250" wall casing to be set.  Information per drillers log and cement tickets:  74' of 20" conductor set.  632' of  9 5/8" casing set and cemented with 350 sacks  of  "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk).  Cement returns to surface not realized with 30' of cement left in hole at 20:11  01-31-10.  Grouted backside with 9 bbls of cement.  Cement basket set at 378' as proposal indicated potential mine at 406'-436'.  Open mine not encountered.  Drilling pit lined and freeboard maintained.  E/S controls in place and functioning as per available plan.
 
Met with Operator rep Todd Kunselman.
 
 
 
|  
 
 
|-
 
|-
 +
| 2011-01-27
 +
| Performed Spud Operation
 
|-
 
|-
| 1948427
 
 
| 2011-02-07
 
| 2011-02-07
| No Violations Noted
+
| Drilling Completion
| Drilling 6 1/4" hole at 6600' at time of inspection.   
+
|-
Information per drillers log and cement tickets:  1470' of  7" 0.250" wall casing set and cemented with 120 sacks  of  "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.54 cu ft/sk); tailed with 100 sacks of  "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk).  Cement returns to surface realized with plug landing at 22:07 02-02-11. 
+
| 2011-07-15
Drilling pit lined and freeboard maintained.  E/S controls in place and functioning as per available plan.
+
| Perforation
 
+
|-
|  
+
| 2013-05-15
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 1949787
+
|}-->
| 2011-02-02
 
| No Violations Noted
 
| Rig is on-site.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There is no evidence of accelerated erosion and sedimentation on the well site or the access road. 
 
  
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
  
|  
+
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 13,209.00
 +
| style="text-align: right;" | 127
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 23,098.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 28,944.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 23,842.00
 +
| style="text-align: right;" | 362
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2033829
+
| 2015
| 2012-01-12
+
| [[SNYDER BROS INC]]
| Violation(s) Noted
+
| style="text-align: right;" | 16,949.00
|  
+
| style="text-align: right;" | 356
| 629153
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 16,460.00
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2044772
+
| 2017
| 2012-02-23
+
| [[SNYDER BROS INC]]
| No Violations Noted
+
| style="text-align: right;" | 17,827.00
| Well is located on the same well pad as 42-005-30550. Brine tanks and seperator apparatus located onsite and appeared to be in sound condition.  There was no observed accelerated erosion or sedimenation in relation to the access road or well-site.  Site and freshwater impoundmnet had been regraded, seeded and mulched.  The oprator should continue to monitor the site to insure that 70% uniform coverage criteria.
+
| style="text-align: right;" | 361
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 16,199.00
 +
| style="text-align: right;" | 354
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2069983
+
| 2019
| 2012-05-22
+
| [[SNYDER BROS INC]]
| No Violations Noted
+
| style="text-align: right;" | 14,331.00
| At the time of inspection the well appears to be dilled and equipped for production.  The well apparatus and brine tanks located onsite appear to in sound working condition.  The Department notes accelerated erosion created from run off of the adjacent hillside is creating a scoured ditch to transport erosion and sedimentation to be transported over the hillside behind the well head.  The Department suggest that the Operator line the ditch at the bottom of the hill adjacent to the well head with clean durable rock.  The Department also suggest the Operator regrade the affected area and install rip rap and catch basin between the well pad area down to the sediment fencing installed at the limit of disturbance.
+
| style="text-align: right;" | 355
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Waste Type
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Quantity
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Disposal Method
!scope="col" | OIL QUANTITY
+
!scope="col" | Waste Facility ID
!scope="col" | OIL PRODUCTION DAYS
+
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 525-1
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-049-23127
 +
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
| 2012-2
+
| 2011
| style="text-align:right;" | 10411.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 181.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 85.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23584
 
|-
 
|-
| 2012-1
+
| 2012
| style="text-align:right;" | 12687.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 182.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 80.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 34-155-23795
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 
|-
 
|-
| 2011-2
+
| 2013
| style="text-align:right;" | 13209.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 127.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 194.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 34-155-21438
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 95.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 
|-
 
|-
| 2011-1
+
| 2015
| style="text-align:right;" | 0.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 0.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 120.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123NW009
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 117.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 
|-
 
|-
| 2010-2
+
| 2018
| style="text-align:right;" | 0.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 0.0
+
| Produced Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100.00 Bbl
| style="text-align:right;" | 0.0
+
| INJECTION DISPOSAL WELL
| style="text-align:right;" | 0.0
+
| 34-155-23223
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Inspection Category
!scope="col" | QUANTITY
+
!scope="col" | Inspection Date
!scope="col" | UNITS
+
!scope="col" | Inspection Type
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Inspection Result
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Inspection Comments
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 1947285
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 80.0
+
| 2011-02-02
| Bbl
+
| Drilling/Alteration
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-42-155-21438
+
| Drilling 8 3/4" hole at 1440' at time of inspection.  Proposed 1470' of 7" .250" wall casing to be set.  Information per drillers log and cement tickets:  74' of 20" conductor set.  632' of  9 5/8" casing set and cemented with 350 sacks  of  "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk).  Cement returns to surface not realized with 30' of cement left in hole at 20:11  01-31-10.  Grouted backside with 9 bbls of cement.  Cement basket set at 378' as proposal indicated potential mine at 406'-436'.  Open mine not encountered.  Drilling pit lined and freeboard maintained.  E/S controls in place and functioning as per available plan.
| KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 1948427
 +
| Primary Facility
 +
| 2011-02-07
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Drilling 6 1/4" hole at 6600' at time of inspection.
 
|-
 
|-
| 2012-2
+
| 1949787
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 80.0
+
| 2011-02-02
| Bbl
+
| Routine/Complete Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-42-155-23795
+
| Rig is on-site.  Site ID sign and E&S plan located.  Pit appears to be in sound condition.  There is no evidence of accelerated erosion and sedimentation on the well site or the access road.
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
 +
| 2033829
 +
| Primary Facility
 +
| 2012-01-12
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
|
 
|-
 
|-
| 2011-2
+
| 2044772
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 90.0
+
| 2012-02-23
| Bbl
+
| Compliance Evaluation
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| 525-1
+
| Well is located on the same well pad as 005-30550.  Brine tanks and seperator apparatus located onsite and appeared to be in sound condition.  There was no observed accelerated erosion or sedimenation in relation to the access road or well-site.  Site and freshwater impoundmnet had been regraded, seeded and mulched.  The oprator should continue to monitor the site to insure that 70% uniform coverage criteria.
| BLAZEK PUMP AND WELL
 
| HIRAM
 
| OH
 
 
|-
 
|-
 +
| 2069983
 +
| Primary Facility
 +
| 2012-05-22
 +
| Site Restoration
 +
| No Violations Noted
 +
| At the time of inspection the well appears to be dilled and equipped for production.  The well apparatus and brine tanks located onsite appear to in sound working condition.  The Department notes accelerated erosion created from run off of the adjacent hillside is creating a scoured ditch to transport erosion and sedimentation to be transported over the hillside behind the well head.  The Department suggest that the Operator line the ditch at the bottom of the hill adjacent to the well head with clean durable rock.  The Department also suggest the Operator regrade the affected area and install rip rap and catch basin between the well pad area down to the sediment fencing installed at the limit of disturbance.
 
|-
 
|-
| 2011-2
+
| 2201402
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 90.0
+
| 2013-09-04
| Bbl
+
| Routine/Complete Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-42-049-23127
+
| Well appeared to be equipped for production.  Brine tanks located on-site and they appeared to be in sound condition.  Site had been properly restored and the vegetation met the 70% uniform coverage criteria.  There was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
| NORTH STAR
 
| YOUNGSTOWN
 
| OH
 
 
|-
 
|-
 +
| 2379676
 +
| Primary Facility
 +
| 2015-06-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
| 2011-2
+
|}
| PRODUCED FLUID
+
==== Violations Commited ====
| style="text-align:right;" | 100.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Inspection ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Violation ID
| PA0095273
+
!scope="col" | Violation Date
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
!scope="col" | Date Resolved
| JOSEPHINE
+
!scope="col" | Violation Code
| PA
+
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
 +
| 2033829
 +
| 629153
 +
| 01/12/2012
 +
| 2012-01-12
 +
| 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production.
 +
| Administrative
 +
|
 
|-
 
|-
| 2011-2
+
|}
| PRODUCED FLUID
+
==== Penalties Applied ====
| style="text-align:right;" | 110.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0254185
+
!scope="col" | Penalty Code
| RESERVED ENVIRONMENTAL SERVICES
+
!scope="col" | Penalty Status
| MOUNT PLEASANT
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
|-
+
| 629153
| 2012-1
+
| 279230
| PRODUCED FLUID
+
| NOV - Notice of Violation
| style="text-align:right;" | 85.0
+
| Comply/Closed
| Bbl
+
|
| INJECTION DISPOSAL WELL
+
| 2012-02-23
| 34-42-155-23584
+
| style="text-align: right;" |  
| KOONTZ #1 DISPOSAL WELL
+
| style="text-align: right;" |  
| WARREN
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 07:55, 21 May 2020

Well Details

Well ID: 37-005-30724
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146265
Farm/Lease Name: DONALD J ANTONACE ETUX 2M-50
License Status:
Spud Date:
Permit Date: 2010-10-26
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.789647
Longitude: -79.600097

For data sources see[1][2][3]

Well History

Date Event
2010-10-26 New Permit Application
2011-01-27 Performed Spud Operation
2011-02-07 Drilling Completion
2011-07-15 Perforation
2013-05-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2011 SNYDER BROS INC 13,209.00 127 0.00 0 0.00 0
2012 SNYDER BROS INC 23,098.00 363 0.00 0 0.00 0
2013 SNYDER BROS INC 28,944.00 361 0.00 0 0.00 0
2014 SNYDER BROS INC 23,842.00 362 0.00 0 0.00 0
2015 SNYDER BROS INC 16,949.00 356 0.00 0 0.00 0
2016 SNYDER BROS INC 16,460.00 356 0.00 0 0.00 0
2017 SNYDER BROS INC 17,827.00 361 0.00 0 0.00 0
2018 SNYDER BROS INC 16,199.00 354 0.00 0 0.00 0
2019 SNYDER BROS INC 14,331.00 355 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 SNYDER BROS INC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 SNYDER BROS INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2011 SNYDER BROS INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 SNYDER BROS INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 SNYDER BROS INC Produced Fluid 194.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 SNYDER BROS INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2018 SNYDER BROS INC Produced Fluid 117.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1947285 Primary Facility 2011-02-02 Drilling/Alteration No Violations Noted Drilling 8 3/4" hole at 1440' at time of inspection. Proposed 1470' of 7" .250" wall casing to be set. Information per drillers log and cement tickets: 74' of 20" conductor set. 632' of 9 5/8" casing set and cemented with 350 sacks of "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with 30' of cement left in hole at 20:11 01-31-10. Grouted backside with 9 bbls of cement. Cement basket set at 378' as proposal indicated potential mine at 406'-436'. Open mine not encountered. Drilling pit lined and freeboard maintained. E/S controls in place and functioning as per available plan.
1948427 Primary Facility 2011-02-07 Drilling/Alteration No Violations Noted Drilling 6 1/4" hole at 6600' at time of inspection.
1949787 Primary Facility 2011-02-02 Routine/Complete Inspection No Violations Noted Rig is on-site. Site ID sign and E&S plan located. Pit appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road.
2033829 Primary Facility 2012-01-12 Routine/Complete Inspection Violation(s) Noted
2044772 Primary Facility 2012-02-23 Compliance Evaluation No Violations Noted Well is located on the same well pad as 005-30550. Brine tanks and seperator apparatus located onsite and appeared to be in sound condition. There was no observed accelerated erosion or sedimenation in relation to the access road or well-site. Site and freshwater impoundmnet had been regraded, seeded and mulched. The oprator should continue to monitor the site to insure that 70% uniform coverage criteria.
2069983 Primary Facility 2012-05-22 Site Restoration No Violations Noted At the time of inspection the well appears to be dilled and equipped for production. The well apparatus and brine tanks located onsite appear to in sound working condition. The Department notes accelerated erosion created from run off of the adjacent hillside is creating a scoured ditch to transport erosion and sedimentation to be transported over the hillside behind the well head. The Department suggest that the Operator line the ditch at the bottom of the hill adjacent to the well head with clean durable rock. The Department also suggest the Operator regrade the affected area and install rip rap and catch basin between the well pad area down to the sediment fencing installed at the limit of disturbance.
2201402 Primary Facility 2013-09-04 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetation met the 70% uniform coverage criteria. There was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
2379676 Primary Facility 2015-06-12 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2033829 629153 01/12/2012 2012-01-12 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
629153 279230 NOV - Notice of Violation Comply/Closed 2012-02-23

For data sources see[7]

References