If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30724 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.789647,"lon":-79.600097,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 146265 | |
Farm/Lease Name: DONALD J ANTONACE ETUX 2M-50 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-10-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.789647 | |
Longitude: -79.600097 |
Date | Event |
---|---|
2010-10-26 | New Permit Application |
2011-01-27 | Performed Spud Operation |
2011-02-07 | Drilling Completion |
2011-07-15 | Perforation |
2013-05-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 13,209.00 | 127 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 23,098.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 28,944.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 23,842.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 16,949.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 16,460.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 17,827.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 16,199.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 14,331.00 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2011 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-049-23127 |
2011 | SNYDER BROS INC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | SNYDER BROS INC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | SNYDER BROS INC | Produced Fluid | 194.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2015 | SNYDER BROS INC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2018 | SNYDER BROS INC | Produced Fluid | 117.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1947285 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | Drilling 8 3/4" hole at 1440' at time of inspection. Proposed 1470' of 7" .250" wall casing to be set. Information per drillers log and cement tickets: 74' of 20" conductor set. 632' of 9 5/8" casing set and cemented with 350 sacks of "standard" cement containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Cement returns to surface not realized with 30' of cement left in hole at 20:11 01-31-10. Grouted backside with 9 bbls of cement. Cement basket set at 378' as proposal indicated potential mine at 406'-436'. Open mine not encountered. Drilling pit lined and freeboard maintained. E/S controls in place and functioning as per available plan. |
1948427 | Primary Facility | 2011-02-07 | Drilling/Alteration | No Violations Noted | Drilling 6 1/4" hole at 6600' at time of inspection. |
1949787 | Primary Facility | 2011-02-02 | Routine/Complete Inspection | No Violations Noted | Rig is on-site. Site ID sign and E&S plan located. Pit appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road. |
2033829 | Primary Facility | 2012-01-12 | Routine/Complete Inspection | Violation(s) Noted | |
2044772 | Primary Facility | 2012-02-23 | Compliance Evaluation | No Violations Noted | Well is located on the same well pad as 005-30550. Brine tanks and seperator apparatus located onsite and appeared to be in sound condition. There was no observed accelerated erosion or sedimenation in relation to the access road or well-site. Site and freshwater impoundmnet had been regraded, seeded and mulched. The oprator should continue to monitor the site to insure that 70% uniform coverage criteria. |
2069983 | Primary Facility | 2012-05-22 | Site Restoration | No Violations Noted | At the time of inspection the well appears to be dilled and equipped for production. The well apparatus and brine tanks located onsite appear to in sound working condition. The Department notes accelerated erosion created from run off of the adjacent hillside is creating a scoured ditch to transport erosion and sedimentation to be transported over the hillside behind the well head. The Department suggest that the Operator line the ditch at the bottom of the hill adjacent to the well head with clean durable rock. The Department also suggest the Operator regrade the affected area and install rip rap and catch basin between the well pad area down to the sediment fencing installed at the limit of disturbance. |
2201402 | Primary Facility | 2013-09-04 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetation met the 70% uniform coverage criteria. There was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road. |
2379676 | Primary Facility | 2015-06-12 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2033829 | 629153 | 01/12/2012 | 2012-01-12 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
629153 | 279230 | NOV - Notice of Violation | Comply/Closed | 2012-02-23 |
For data sources see[7]