X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31027"

m (Wiki moved page 005-31027 to 42-005-31027)
m
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 005-31027
+
| Well ID: 37-005-31027
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.710661, -79.626202 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.710661, -79.626203 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Buffalo Township, Armstrong County, Pennsylvania|South Buffalo Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[SNYDER BROS INC|SNYDER BROS INC]]
+
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 
|-
 
|-
| Farm/Lease Name: WILLIAM H RENSHAW ETUX 4M-161
+
| Municipality: [[South Buffalo Township,_Armstrong_County,_Pennsylvania|South Buffalo Township]]
 
|-
 
|-
| First Permit Date: 2012-03-13
+
| Operator Name: [[SNYDER BROS INC]]
 
|-
 
|-
| Last Permit Date: 2012-03-13
+
| Well Pad ID: [[147131]]
 
|-
 
|-
| Spud Date: 2012-09-25
+
| Farm/Lease Name: WILLIAM H RENSHAW
 
|-
 
|-
| Unconventional: Yes
+
| License Status: Plugged and Abandoned
 
|-
 
|-
| Horizontal: No
+
| Spud Date: 2012-09-26
 
|-
 
|-
| Producing: Yes
+
| Permit Date: 2012-03-13
 
|-
 
|-
| Violations: None
+
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.710661
 
| Latitude: 40.710661
 
|-
 
|-
| Longitude: -79.626202
+
| Longitude: -79.626203
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-03-13
 +
| New Permit Application
 +
|-
 +
| 2012-09-25
 +
| Performed Spud Operation
 +
|-
 +
| 2012-10-05
 +
| Drilling Completion
 +
|-
 +
| 2012-11-19
 +
| Perforation
 +
|-
 +
| 2012-11-19
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2012-11-20
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2013-05-07
 +
| NEWLY DRILLED
 +
|-
 +
| 2019-04-18
 +
| Begin Plugging
 +
|-
 +
| 2019-04-25
 +
| Finished Plugging
 +
|-
 +
| 2019-09-05
 +
| Fully Plugged
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-11-19
 +
| 2012-11-19
 +
| style="text-align: right;" | 7,046
 +
| style="text-align: right;" | 158,047
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
__TOC__
+
==== Fluid Composition Data ====
== Well Inspection Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Job Number
!scope="col" | DATE
+
!scope="col" | Trade Name
!scope="col" | DESCRIPTION
+
!scope="col" | Supplier
!scope="col" | COMMENT
+
!scope="col" | Purpose
!scope="col" | VIOLATION ID
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2099870
+
|- valign="top"
| 2012-09-13
+
| rowspan="27"| 1
| No Violations Noted
+
| rowspan="0"| SUPER TSC
| Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming  on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
+
| rowspan="0"| Nabors Industries
 +
| rowspan="0"| Paraffin & Scale Additive
 +
|- valign="top"
 +
| rowspan="2"| Hydrochloric Acid
 +
| rowspan="2"| Nabors Industries
 +
| rowspan="2"| Cement/Formation Breakdown
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 92.50
 +
| style="text-align: right;" | 0.21
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| SUPER MAX
 +
| rowspan="4"| Nabors Industries
 +
| rowspan="4"| Surfactant/Foamer
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00583680
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Ethylhexanol
 +
| 104-76-7
 +
| style="text-align: right;" | 40.00
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 +
|-
 +
| PROPRIETARY
 
|  
 
|  
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00986490
 +
| style="text-align: right;" |
 +
|-
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.04
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Super 100NE
 +
| rowspan="2"| Nabors Industries
 +
| rowspan="2"| Surfactant/Foamer
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00014090
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00003290
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="4"| SUPER TSC
 +
| rowspan="4"| Nabors Industries
 +
| rowspan="4"| Scale Control
 +
| ANIONIC POLYMER
 +
|
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00035230
 +
| style="text-align: right;" |
 
|-
 
|-
| 2104747
+
| ANIONIC COPOLYMER
| 2012-10-03
 
| No Violations Noted
 
| At the time of inspection the Operator was actively drilling the onsite.  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan.  The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected.  The Department suggests again that the Operator mend the erosion ditch  forming on the corner of the well pad furthest  from the cut slope and pull the built up sediment away from the sediment fence.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
 
 
|  
 
|  
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00035230
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
 +
| 37971-36-1
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00035230
 +
| style="text-align: right;" |
 
|-
 
|-
| 2111180
+
| 1,2-Propylene glycol
| 2012-10-24
+
| 57-55-6
| No Violations Noted
+
| style="text-align: right;" | 50.00
| At the time of inspection the site appeared to be drilled but not equipped for production  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected.  The Department notes that the Operator mended the erosion ditch  forming on the corner of the well pad furthest  from the cut slope and pulled the built up sediment away from the sediment fence.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
+
| style="text-align: right;" | 0.00176160
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ICP-1000
 +
| rowspan="2"| Nabors Industries
 +
| rowspan="2"| Iron Control Additive
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00352320
 +
| style="text-align: right;" |
 +
|-
 +
| ANIONIC COPOLYMER
 
|  
 
|  
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00352320
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| CLAY TREAT LT
 +
| rowspan="1"| Nabors Industries
 +
| rowspan="1"| Clay Control
 +
| Choline chloride
 +
| 67-48-1
 +
| style="text-align: right;" | 80.00
 +
| style="text-align: right;" | 0.00037580
 +
| style="text-align: right;" |
 
|-
 
|-
| 2118997
+
|- valign="top"
| 2012-11-28
+
| rowspan="4"| ACID INHIBITOR 2
| No Violations Noted
+
| rowspan="4"| Nabors Industries
| Well producing in line after recent frac.  Pit lined and freeboard maintained.
+
| rowspan="4"| Acid Corrosion Inhibitor
Well equipped with production unit (separators, heater, meter), and two (2) produced fluids tanks.
+
| Propargyl alcohol
 
+
| 107-19-7
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021140
 +
| style="text-align: right;" |
 +
|-
 +
| PROPRIETARY
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00004930
 +
| style="text-align: right;" |
 +
|-
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021140
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021140
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| KR-153SL
 +
| rowspan="4"| Nabors Industries
 +
| rowspan="4"| Biocide
 +
| Diethylene glycol
 +
| 111-46-6
 +
| style="text-align: right;" | 3.50
 +
| style="text-align: right;" | 0.00012330
 +
| style="text-align: right;" |
 +
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00176160
 +
| style="text-align: right;" |
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.00070460
 +
| style="text-align: right;" |
 +
|-
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00003520
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| WFR-3B
 +
| rowspan="4"| Nabors Industries
 +
| rowspan="4"| Friction Reducer
 +
| Stoddard solvent
 +
| 8052-41-3
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00683500
 +
| style="text-align: right;" |
 +
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
| Ethoxylated C12-16 alcohols
 +
| 68551-12-2
 +
| style="text-align: right;" | 4.00
 +
| style="text-align: right;" | 0.00273400
 +
| style="text-align: right;" |
 +
|-
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 25.00
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2012-11-19
 +
| style="text-align: right;" | 1
 +
| Sand
 +
| style="text-align: right;" | 158,047
 +
| style="text-align: right;" | 5,748
 +
| style="text-align: right;" | 4,960
 +
|-
 +
| 2012-11-20
 +
| style="text-align: right;" | 2
 +
| Sand
 +
| style="text-align: right;" | 158,047
 +
| style="text-align: right;" | 5,595
 +
| style="text-align: right;" | 3,704
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 4,397.00
 +
| style="text-align: right;" | 7
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 79,935.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2014
| style="text-align:right;" | 4397.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 7.0
+
| style="text-align: right;" | 36,346.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 24,820.00
 +
| style="text-align: right;" | 352
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2016
| style="text-align:right;" | 0.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 20,070.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 319
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 16,136.00
 +
| style="text-align: right;" | 289
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 11,371.00
 +
| style="text-align: right;" | 239
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 7,425.00
 +
| style="text-align: right;" | 119
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2012
| FRACING FLUID WASTE
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 2040.0
+
| Drill Cuttings
| Bbl
+
| style="text-align: right;" | 119.00 Tons
 +
| ON SITE ENCAPSULATION
 +
|
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 240.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,040.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW006
 
| WMGR123NW006
| CAES WATER TRMT & RECYCLING FAC
 
| CLARION
 
| PA
 
 
|-
 
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 
|-
 
|-
| 2012-2
+
| 2013
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 80.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 160.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
| KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 
|-
 
|-
| 2012-2
+
| 2014
| DRILL CUTTINGS
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 119.0
+
| Produced Fluid
| Tons
+
| style="text-align: right;" | 105.00 Bbl
| ENCAPSULATION
+
| INJECTION DISPOSAL WELL
|  
+
| 34-155-21438
| ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62
+
|-
|  
+
| 2017
|  
+
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 95.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
 
 +
| style="text-align: right;" | 95.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 
|-
 
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 34.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 
|-
 
|-
| 2012-2
+
| 2019
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 80.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 110.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-099-23158
| PANDER #1 (SWIW #15)
+
|-
| NEWTON FALLS
+
|}
| OH
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2099870
 +
| Primary Facility
 +
| 2012-09-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Pre-operation inspection at the request of the Operator.  At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan.  The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department notes that at the time of inspection an erosion ditch is forming  on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite.  The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
 +
|-
 +
| 2104747
 +
| Primary Facility
 +
| 2012-10-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the Operator was actively drilling the onsite.  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan.  The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected.  The Department suggests again that the Operator mend the erosion ditch  forming on the corner of the well pad furthest  from the cut slope and pull the built up sediment away from the sediment fence.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
 +
|-
 +
| 2111180
 +
| Primary Facility
 +
| 2012-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the site appeared to be drilled but not equipped for production  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan.  The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected.  The Department notes that the Operator mended the erosion ditch  forming on the corner of the well pad furthest  from the cut slope and pulled the built up sediment away from the sediment fence.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
 +
|-
 +
| 2118997
 +
| Primary Facility
 +
| 2012-11-28
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Well producing in line after recent frac.  Pit lined and freeboard maintained.
 
|-
 
|-
 +
| 2170517
 +
| Primary Facility
 +
| 2013-05-24
 +
| Site Restoration
 +
| No Violations Noted
 +
| Well appeared to be equipped for production, brine tank located onsite.  Brine tank appeared to be in sound condition.  Site had been regraded, seeded, mulched and the vegetation ahd begun to emerge.  The operator should continue to monitor the site to isnure the continued growth of the vegetation.  There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
 
|-
 
|-
| 2012-2
+
| 2185962
| FRACING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 240.0
+
| 2013-07-19
| Bbl
+
| Site Restoration
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|
+
| Well appeared to be equipped for production, brine tank located onsite.  Brine tank appeared to be in sound condition.  Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
| REUSE FOR HYDRAULIC FRACTURING
 
|  
 
|  
 
 
|-
 
|-
 +
| 2381108
 +
| Primary Facility
 +
| 2015-06-22
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
|-
| 2012-2
+
| 2750679
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 80.0
+
| 2018-07-11
| Bbl
+
| Routine/Complete Inspection
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-155-21893
+
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.
| WOLF #1 DISP WELL (PANDER RAY TRUCKING INC)
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 08:13, 21 May 2020

Well Details

Well ID: 37-005-31027
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 147131
Farm/Lease Name: WILLIAM H RENSHAW
License Status: Plugged and Abandoned
Spud Date: 2012-09-26
Permit Date: 2012-03-13
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.710661
Longitude: -79.626203

For data sources see[1][2][3]

Well History

Date Event
2012-03-13 New Permit Application
2012-09-25 Performed Spud Operation
2012-10-05 Drilling Completion
2012-11-19 Perforation
2012-11-19 Performed Stage 1 of Stimulation
2012-11-20 Performed Stage 2 of Stimulation
2013-05-07 NEWLY DRILLED
2019-04-18 Begin Plugging
2019-04-25 Finished Plugging
2019-09-05 Fully Plugged

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-19 2012-11-19 7,046 158,047

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SUPER TSC Nabors Industries Paraffin & Scale Additive
Hydrochloric Acid Nabors Industries Cement/Formation Breakdown Hydrochloric acid 7647-01-0 7.50 0.01
Water 7732-18-5 92.50 0.21
SUPER MAX Nabors Industries Surfactant/Foamer 2-Butoxyethanol 111-76-2 7.00 0.00583680
2-Ethylhexanol 104-76-7 40.00 0.05
PROPRIETARY 7.00 0.00986490
Isopropanol 67-63-0 30.00 0.04
Super 100NE Nabors Industries Surfactant/Foamer Isopropanol 67-63-0 30.00 0.00014090
2-Butoxyethanol 111-76-2 7.00 0.00003290
SUPER TSC Nabors Industries Scale Control ANIONIC POLYMER 10.00 0.00035230
ANIONIC COPOLYMER 10.00 0.00035230
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00035230
1,2-Propylene glycol 57-55-6 50.00 0.00176160
ICP-1000 Nabors Industries Iron Control Additive 1,2-Propylene glycol 57-55-6 50.00 0.00352320
ANIONIC COPOLYMER 50.00 0.00352320
CLAY TREAT LT Nabors Industries Clay Control Choline chloride 67-48-1 80.00 0.00037580
ACID INHIBITOR 2 Nabors Industries Acid Corrosion Inhibitor Propargyl alcohol 107-19-7 0.00021140
PROPRIETARY 0.00004930
Isopropanol 67-63-0 0.00021140
2-Butoxyethanol 111-76-2 0.00021140
KR-153SL Nabors Industries Biocide Diethylene glycol 111-46-6 3.50 0.00012330
Polyethylene glycol 25322-68-3 50.00 0.00176160
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00070460
Ethylene glycol 107-21-1 1.00 0.00003520
WFR-3B Nabors Industries Friction Reducer Stoddard solvent 8052-41-3 10.00 0.00683500
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00273400
1,2-Propylene glycol 57-55-6 25.00 0.01

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-11-19 1 Sand 158,047 5,748 4,960
2012-11-20 2 Sand 158,047 5,595 3,704

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 SNYDER BROS INC 4,397.00 7 0.00 0 0.00 0
2013 SNYDER BROS INC 79,935.00 360 0.00 0 0.00 0
2014 SNYDER BROS INC 36,346.00 362 0.00 0 0.00 0
2015 SNYDER BROS INC 24,820.00 352 0.00 0 0.00 0
2016 SNYDER BROS INC 20,070.00 319 0.00 0 0.00 0
2017 SNYDER BROS INC 16,136.00 289 0.00 0 0.00 0
2018 SNYDER BROS INC 11,371.00 239 0.00 0 0.00 0
2019 SNYDER BROS INC 7,425.00 119 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SNYDER BROS INC Drill Cuttings 119.00 Tons ON SITE ENCAPSULATION
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Fracing Fluid Waste 240.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SNYDER BROS INC Fracing Fluid Waste 2,040.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 SNYDER BROS INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 SNYDER BROS INC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2017 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 34.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2099870 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2104747 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively drilling the onsite. The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected. The Department suggests again that the Operator mend the erosion ditch forming on the corner of the well pad furthest from the cut slope and pull the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2111180 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the site appeared to be drilled but not equipped for production The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected. The Department notes that the Operator mended the erosion ditch forming on the corner of the well pad furthest from the cut slope and pulled the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2118997 Primary Facility 2012-11-28 Drilling/Alteration No Violations Noted Well producing in line after recent frac. Pit lined and freeboard maintained.
2170517 Primary Facility 2013-05-24 Site Restoration No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation ahd begun to emerge. The operator should continue to monitor the site to isnure the continued growth of the vegetation. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2185962 Primary Facility 2013-07-19 Site Restoration No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2381108 Primary Facility 2015-06-22 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2750679 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.

For data sources see[9]

References