Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 42-007-20303
+
| Well ID: 37-007-20303
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.752027, -80.495777 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.752028, -80.495778 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Beaver County, Pennsylvania|Beaver]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Beaver Township, Beaver County, Pennsylvania|South Beaver Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| County: [[Beaver_County,_Pennsylvania|Beaver]]
 +
|-
 +
| Municipality: [[South Beaver Township,_Beaver_County,_Pennsylvania|South Beaver Township]]
 +
|-
 +
| Operator Name: [[GEOPETRO LLC]]
 +
|-
 +
| Well Pad ID: [[148174]]
 
|-
 
|-
 
| Farm/Lease Name: DAVID THOMPSON 3H
 
| Farm/Lease Name: DAVID THOMPSON 3H
 
|-
 
|-
| First Permit Date: 2010-11-22
+
| License Status:
 +
|-
 +
| Spud Date:
 +
|-
 +
| Permit Date: 2010-11-22
 +
|-
 +
| Well Type: COMB. OIL&GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 
|-
 
|-
| Last Permit Date: 2010-11-22
+
| Conservation: Yes
 
|-
 
|-
| Spud Date: 2011-01-20
+
| Latitude: 40.752028
 
|-
 
|-
| Unconventional: No
+
| Longitude: -80.495778
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Horizontal: Yes
+
| 2010-11-22
 +
| New Permit Application
 
|-
 
|-
| Producing: Yes
+
| 2011-01-20
 +
| Performed Spud Operation
 
|-
 
|-
| Violations: None
+
| 2011-05-21
 +
| Drilling Completion
 
|-
 
|-
| Latitude: 40.752027
+
| 2011-07-16
 +
| Perforation
 
|-
 
|-
| Longitude: -80.495777
+
| 2013-07-26
 +
| DEVIATED
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2011-07-10
 +
| 2011-07-10
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 5,778,780
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="23"| 1
 +
| rowspan="6"| ALPHA 1427
 +
| rowspan="6"|
 +
| rowspan="6"| Bactericide
 +
| Quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 +
| 68424-85-1
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00105000
 +
| style="text-align: right;" |
 +
|-
 +
| Ethanol
 +
| 64-17-5
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00075000
 +
| style="text-align: right;" |
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00896000
 +
| style="text-align: right;" |
 +
|-
 +
| Glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00448000
 +
| style="text-align: right;" |
 +
|-
 +
| Didecyl dimethyl ammonium chloride
 +
| 7173-51-5
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00149000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Recycled Produced Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 7.58
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| SCALETROL 720
 +
| rowspan="2"| BJ Services Company
 +
| rowspan="2"| Scale Inhibitor
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 35.00
 +
| style="text-align: right;" | 0.00572000
 +
| style="text-align: right;" |
 +
|-
 +
| Diethylene glycol
 +
| 111-46-6
 +
| style="text-align: right;" | 5.00
 +
| style="text-align: right;" | 0.00082000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="0"| ALPHA 1427
 +
| rowspan="0"| BJ Services Company
 +
| rowspan="0"| Bactericide
 +
|- valign="top"
 +
| rowspan="2"| ClayCare
 +
| rowspan="2"| BJ Services Company
 +
| rowspan="2"| Clay Stabilizer
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
| Choline chloride
 +
| 67-48-1
 +
| style="text-align: right;" | 75.00
 +
| style="text-align: right;" | 0.06
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FRW-18
 +
| rowspan="1"| BJ Services Company
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| XLW-32
 +
| rowspan="2"| BJ Services Company
 +
| rowspan="2"| Crosslinker
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 90.00
 +
| style="text-align: right;" | 0.00985000
 +
| style="text-align: right;" |
 +
|-
 +
| Boric acid
 +
| 10043-35-3
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.00219000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Fresh Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 79.55
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| GW-3LDF
 +
| rowspan="2"| BJ Services Company
 +
| rowspan="2"| Gelling Agent
 +
| Petroleum Distillate Blend
 +
|
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 +
|-
 +
| Polysaccharide Blend
 +
|
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ENZYME G-NE
 +
| rowspan="1"| BJ Services Company
 +
| rowspan="1"| Breaker
 +
| No Hazardous Components
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| GBW-15L
 +
| rowspan="1"| BJ Services Company
 +
| rowspan="1"| Breaker
 +
| Sodium chloride
 +
| 7647-14-5
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00425000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| BF-9L
 +
| rowspan="1"| BJ Services Company
 +
| rowspan="1"| pH Adjusting Agent
 +
| Potassium hydroxide
 +
| 1310-58-3
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.00235000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ACID, HYDROCHLORIC, 15 PCT
 +
| rowspan="2"| Weatherford
 +
| rowspan="2"| Acid
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15.00
 +
| style="text-align: right;" | 0.10
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 85.00
 +
| style="text-align: right;" | 0.59
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand (Proppant)
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 11.81
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 535,809.00
 +
| style="text-align: right;" | 118
 +
| style="text-align: right;" | 8.00
 +
| style="text-align: right;" | 118
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 822,533.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 384,930.00
 +
| style="text-align: right;" | 259
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 324,717.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 283,733.00
 +
| style="text-align: right;" | 357
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 206,173.98
 +
| style="text-align: right;" | 307
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[GEOPETRO LLC]]
 +
| style="text-align: right;" | 126,138.80
 +
| style="text-align: right;" | 229
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[GEOPETRO LLC]]
 +
| style="text-align: right;" | 177,453.66
 +
| style="text-align: right;" | 333
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[GEOPETRO LLC]]
 +
| style="text-align: right;" | 142,761.00
 +
| style="text-align: right;" | 350
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 744.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 440.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 9,393.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,301.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24067
 +
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,340.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20114
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 114
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,435.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,158.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 180.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 290.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 190.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
|
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
|
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 0114
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 270.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 180.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 290.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24202
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24067
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 308.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 89.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20114
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 964.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-24096
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 803.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 604.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 102.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-031-27177
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 365.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-031-27177
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-151-23420
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 180.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28776
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 265.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20525
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 613.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-23614
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 218.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-151-23420
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 548.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 548.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-2-3794
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 357.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 357.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23203
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 357.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21894
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 279.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-2-3794
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,371.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-157-25506
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 131.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21894
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 279.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-23614
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 131.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23203
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 131.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Waste comment only
 +
| style="text-align: right;" | 0.00
 +
|
 +
|
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,801.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 0.00
 +
|
 +
|
 +
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
 
 +
| style="text-align: right;" | 1,160.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2018
 +
| [[GEOPETRO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 663.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-157-25506
 +
|-
 +
| 2018
 +
| [[GEOPETRO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,955.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2019
 +
| [[GEOPETRO LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,105.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1943147
 
| 1943147
 +
| Primary Facility
 
| 2010-12-27
 
| 2010-12-27
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On December 27th, 2010 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was under construction.  The access road was being cut in.  Some temporary E&S controls were in place.
 
| On December 27th, 2010 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was under construction.  The access road was being cut in.  Some temporary E&S controls were in place.
|
 
|-
 
 
|-
 
|-
 
| 1943156
 
| 1943156
 +
| Primary Facility
 
| 2011-01-05
 
| 2011-01-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 5th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was still under construction.  The access road was being rocked.  Site ID was present.  The interceptor channels and sediment trap were being constructed.
 
| On January 5th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was still under construction.  The access road was being rocked.  Site ID was present.  The interceptor channels and sediment trap were being constructed.
|
 
|-
 
 
|-
 
|-
 
| 1954033
 
| 1954033
 +
| Primary Facility
 
| 2011-01-05
 
| 2011-01-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SITE, ACCESS, AND E&S CONTROLS ARE BEING CONSTRUCTED FOR THIS UTICA WELL.
 
| SITE, ACCESS, AND E&S CONTROLS ARE BEING CONSTRUCTED FOR THIS UTICA WELL.
DUMPS HAULING STONE FOR THE ACCESS.
 
THERE IS NOT A RIG ON THE SITE.
 
|
 
|-
 
 
|-
 
|-
 
| 1956850
 
| 1956850
 +
| Primary Facility
 
| 2011-02-02
 
| 2011-02-02
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| CONDUCTOR IS IN. OFFICE TRAILERS ARE ON THE PAD.
 
| CONDUCTOR IS IN. OFFICE TRAILERS ARE ON THE PAD.
THERE IS 24 HR SECURITY AT THE SITE.
 
|
 
|-
 
 
|-
 
|-
 
| 1956854
 
| 1956854
 +
| Primary Facility
 
| 2011-01-24
 
| 2011-01-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PAD IS COMPLETE, BUT CONDUCTOR IS NOT IN.
 
| PAD IS COMPLETE, BUT CONDUCTOR IS NOT IN.
|
 
|-
 
 
|-
 
|-
 
| 1957460
 
| 1957460
 +
| Primary Facility
 
| 2011-02-09
 
| 2011-02-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| CONDUCTOR IS INSTALLED IN THIS UTICA WELL.
 
| CONDUCTOR IS INSTALLED IN THIS UTICA WELL.
SOME PARTS OF PATTERSON 328 ARE ON THE SITE, BUT NOT ASSEMBLED.
 
ACCESS, SIT, AND E&S, ARE OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1958625
 
| 1958625
 +
| Primary Facility
 
| 2011-02-11
 
| 2011-02-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 11th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was constructed.  The rig was moving in and setting up.  The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No pit was constructed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.
 
| On February 11th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started. The well pad was constructed.  The rig was moving in and setting up.  The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No pit was constructed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1960856
 
| 1960856
 +
| Primary Facility
 
| 2011-03-22
 
| 2011-03-22
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UTICA WELL. BIT AT 4250'.
 
| UTICA WELL. BIT AT 4250'.
103/4" CASING CEMENTED. 11 BBL RETURN.
 
|
 
|-
 
 
|-
 
|-
 
| 1960872
 
| 1960872
 +
| Primary Facility
 
| 2011-03-15
 
| 2011-03-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 16" CASING CEMENTED.
 
| 16" CASING CEMENTED.
APPROX. 1500' OF 103/4" CASING READY TO RUN.
 
|
 
|-
 
 
|-
 
|-
 
| 1960875
 
| 1960875
 +
| Primary Facility
 
| 2011-03-07
 
| 2011-03-07
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PATTERSON328 READY TO DRILL THIS UTICA WELL.
 
| PATTERSON328 READY TO DRILL THIS UTICA WELL.
CONDUCTOR IS IN.
 
|
 
|-
 
 
|-
 
|-
 
| 1961879
 
| 1961879
 +
| Primary Facility
 
| 2011-03-22
 
| 2011-03-22
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On March 22nd, 2011 I conducted a routine inspection of the above site.  Drilling was taking placed.  The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No pit was constructed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The slopes of the pad and along the access road should be seeded and mulched or covered with erosion blanket material soon.
 
| On March 22nd, 2011 I conducted a routine inspection of the above site.  Drilling was taking placed.  The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No pit was constructed.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The slopes of the pad and along the access road should be seeded and mulched or covered with erosion blanket material soon.
|
 
|-
 
 
|-
 
|-
 
| 1974655
 
| 1974655
 +
| Primary Facility
 
| 2011-04-14
 
| 2011-04-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PATTERSON 328 CORING AT 8645'.
 
| PATTERSON 328 CORING AT 8645'.
SITE, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1975275
 
| 1975275
 +
| Primary Facility
 
| 2011-04-14
 
| 2011-04-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 14th, 2011 I conducted a routine inspection of the above site.  Drilling was taking place.  The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition.  Site ID was present.  E&S control blankets were being installed on slopes.  Construction was beginning on the production/ processing pad below the site.  E&S controls were functioning properly.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved.
 
| On April 14th, 2011 I conducted a routine inspection of the above site.  Drilling was taking place.  The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition.  Site ID was present.  E&S control blankets were being installed on slopes.  Construction was beginning on the production/ processing pad below the site.  E&S controls were functioning properly.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved.
|
 
|-
 
 
|-
 
|-
 
| 1976537
 
| 1976537
 +
| Primary Facility
 
| 2011-04-29
 
| 2011-04-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PATTERSON 328 STARTING CURVE IN THIS UTICA WELL.
 
| PATTERSON 328 STARTING CURVE IN THIS UTICA WELL.
THE KOP IS 7894'.
 
|
 
|-
 
 
|-
 
|-
 
| 1983177
 
| 1983177
 +
| Primary Facility
 
| 2011-05-26
 
| 2011-05-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| DRILLING COMPLETE. RIG COMING DOWN.  
+
| DRILLING COMPLETE. RIG COMING DOWN.
HORIZONTAL WAS 5,547'.
 
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1983195
 
| 1983195
 +
| Primary Facility
 
| 2011-06-07
 
| 2011-06-07
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. THIS UTICA WELL HAS NOT BEEN FRACED. THE WELL IS COVERD. PATTERSON 328 IS GONE.
 
| DRILLING COMPLETE. THIS UTICA WELL HAS NOT BEEN FRACED. THE WELL IS COVERD. PATTERSON 328 IS GONE.
|
 
|-
 
 
|-
 
|-
 
| 1983777
 
| 1983777
 +
| Primary Facility
 
| 2011-06-21
 
| 2011-06-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| ALL DRILLING EQUIPTMENT GONE. THE WELL HAS NOT BEEN FRACED.
 
| ALL DRILLING EQUIPTMENT GONE. THE WELL HAS NOT BEEN FRACED.
LOCAL ROAD AND WELL ACCESS HAVE FRESH STONE.
 
|
 
|-
 
 
|-
 
|-
 
| 1984948
 
| 1984948
 +
| Primary Facility
 
| 2011-06-03
 
| 2011-06-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 3rd, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  The rig had moved offsite. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  Clearing and grubbing had started on the impoundment site
 
| On June 3rd, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  The rig had moved offsite. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  Clearing and grubbing had started on the impoundment site
|
 
|-
 
 
|-
 
|-
 
| 1991735
 
| 1991735
 +
| Primary Facility
 
| 2011-07-12
 
| 2011-07-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| EQUIPTMENT IS BEING SET FOR FRAC JOB. WATER IS BEING HAULED TO SITE.
 
| EQUIPTMENT IS BEING SET FOR FRAC JOB. WATER IS BEING HAULED TO SITE.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1992103
 
| 1992103
 +
| Primary Facility
 
| 2011-07-12
 
| 2011-07-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On July 12th, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  The rig had moved offsite. Crews were on site prepping for the frac.  Water trucks were delivering water.  The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The impoundment was constructed.  The berms were hydroseeded.  The impoundment was surrounded by a 6¿ security fence and was currently being filled.  Water transfer pumps were on secondary containment.
 
| On July 12th, 2011 I conducted a routine inspection of the above site.  Drilling was completed.  The rig had moved offsite. Crews were on site prepping for the frac.  Water trucks were delivering water.  The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The impoundment was constructed.  The berms were hydroseeded.  The impoundment was surrounded by a 6¿ security fence and was currently being filled.  Water transfer pumps were on secondary containment.
|
 
|-
 
 
|-
 
|-
 
| 1998326
 
| 1998326
 +
| Primary Facility
 
| 2011-08-24
 
| 2011-08-24
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling complete. Crew working on well head. Id sign onsite.
 
| Drilling complete. Crew working on well head. Id sign onsite.
|
 
|-
 
 
|-
 
|-
 
| 1998353
 
| 1998353
 +
| Primary Facility
 
| 2011-08-03
 
| 2011-08-03
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THIS UTICA WELL IS COMPLETE. THE WELL HAS BEEN FRACED. THE WELL WAS FLARED DURING DAYLIGHT HOURS LAST WEEKEND.
 
| THIS UTICA WELL IS COMPLETE. THE WELL HAS BEEN FRACED. THE WELL WAS FLARED DURING DAYLIGHT HOURS LAST WEEKEND.
THE WELL IS HOOKED UP AND PRODUCING.
 
|
 
|-
 
 
|-
 
|-
 
| 1998396
 
| 1998396
 +
| Primary Facility
 
| 2011-08-18
 
| 2011-08-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On August 19th, 2011 I conducted a routine inspection of the above site.  Drilling and frac was complete.  The well was in production. Six tanks were located within a steel dike structure. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls routinely and after each runoff event.
 
| On August 19th, 2011 I conducted a routine inspection of the above site.  Drilling and frac was complete.  The well was in production. Six tanks were located within a steel dike structure. The access road was in good condition.  Site ID was present.  E&S controls were in place according to the ESCGP-1.  No spills/ leaks or accelerated erosion were observed at the time of inspection.  The operator should continue to inspect the E&S controls routinely and after each runoff event.
|
 
|-
 
 
|-
 
|-
 
| 2001715
 
| 2001715
 +
| Primary Facility
 
| 2011-08-19
 
| 2011-08-19
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UTICA COMPLETE AND PRODUCING.
 
| UTICA COMPLETE AND PRODUCING.
THE SITE HAS BEEN CLEARED.
 
E&S OK.
 
|
 
|-
 
 
|-
 
|-
 
| 2003197
 
| 2003197
 +
| Primary Facility
 
| 2011-09-13
 
| 2011-09-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UTICA WELL COMPLETE AND PRODUCING. PIT LEVEL LOW.
 
| UTICA WELL COMPLETE AND PRODUCING. PIT LEVEL LOW.
|
 
|-
 
 
|-
 
|-
 
| 2018478
 
| 2018478
 +
| Primary Facility
 
| 2011-10-06
 
| 2011-10-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS HOOKED UP AND PRODUCING.
 
| WELL IS HOOKED UP AND PRODUCING.
|
 
|-
 
 
|-
 
|-
 
| 2027612
 
| 2027612
 +
| Primary Facility
 
| 2011-11-22
 
| 2011-11-22
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS FRACED AND PRODUCING. THE WELL IS FENCED AND THE ACCESS IS GATED. THE SITE HAS BEEN RESEEDED.
 
| WELL IS FRACED AND PRODUCING. THE WELL IS FENCED AND THE ACCESS IS GATED. THE SITE HAS BEEN RESEEDED.
|
 
|-
 
 
|-
 
|-
 
| 2027922
 
| 2027922
 +
| Primary Facility
 
| 2011-11-29
 
| 2011-11-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS COMPLETE AND PRODUCING.
 
| WELL IS COMPLETE AND PRODUCING.
|
 
|-
 
 
|-
 
|-
 
| 2104563
 
| 2104563
 +
| Primary Facility
 
| 2012-10-02
 
| 2012-10-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley WQS, SWRO was on site to conduct a routine inspection.  At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. The well was drilled.  Bmp's installed were functioning according to the E&S plan.  No accelerated erosion or sedimentation issues were noted on site or the access road.  The hillsides had been stabilized and had good growth with at least 70% vegetation.  The fresh water impoundment was visually inspected and was found to be in good shape with no evidence of leakage.
 
| John Ley WQS, SWRO was on site to conduct a routine inspection.  At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. The well was drilled.  Bmp's installed were functioning according to the E&S plan.  No accelerated erosion or sedimentation issues were noted on site or the access road.  The hillsides had been stabilized and had good growth with at least 70% vegetation.  The fresh water impoundment was visually inspected and was found to be in good shape with no evidence of leakage.
|
 
|-
 
 
|-
 
|-
 
| 2116488
 
| 2116488
 +
| Primary Facility
 
| 2012-10-16
 
| 2012-10-16
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS COMPLETE. TANKS AND PRODUCTION EQUIPTMENT ARE HOOKED UP. THE PAD IS FENCED AND LOCKED.
 
| WELL IS COMPLETE. TANKS AND PRODUCTION EQUIPTMENT ARE HOOKED UP. THE PAD IS FENCED AND LOCKED.
|
 
|-
 
 
|-
 
|-
 
| 2124796
 
| 2124796
 +
| Primary Facility
 
| 2012-12-17
 
| 2012-12-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS HOOKED UP AND PRODUCING.
 
| WELL IS HOOKED UP AND PRODUCING.
THE PAD IS FENCED.
 
|
 
 
|-
 
|-
|}
+
| 2259573
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2014-04-04
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| Well was properly labeled. Well is drilled and is equipped with two brine tanks. Water in brine tank containment was clear with no sheen. Freshwater Impoundment had the necessary two feet of freeboard. No E&S issues noted.
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2363824
| style="text-align:right;" | 317743.0
+
| Primary Facility
| style="text-align:right;" | 184.0
+
| 2015-04-22
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2402740
 +
| Primary Facility
 +
| 2015-08-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| THIS PRODUCING UTICA WELL IS IN GOOD CONDITION.
 
|-
 
|-
| 2012-1
+
| 2450295
| style="text-align:right;" | 504790.0
+
| Primary Facility
| style="text-align:right;" | 182.0
+
| 2016-01-27
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| Violation(s) Noted
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-0
 
| style="text-align:right;" | 535809.0
 
| style="text-align:right;" | 118.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 8.0
 
| style="text-align:right;" | 118.0
 
|-
 
|-
 
| 2010-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2450295
| PRODUCED FLUID
+
| 746077
| style="text-align:right;" | 100.0
+
| 2016-01-27
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-42-059-24067
 
| DEVCO UNIT #1 (SWIW #11) DAVID R HILL INC
 
| CAMBRIDGE
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1224.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-42-133-21076
 
| MYERS #1 UNIT  (SALTY'S DISPOSAL)
 
| ATWATER
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 2609.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 +
| OGA3216(C)
 +
| Environmental Health & Safety
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2011-0
+
| 746077
| FRACING FLUID WASTE
+
| 334793
| style="text-align:right;" | 440.0
+
| NOV - Notice of Violation
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR119
 
| EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT)
 
| WILLIAMSPORT
 
| PA
 
|-
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 744.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-42-133-24096
 
| GROSELLE #2 - SALTYS DISPOSAL WELLS LP
 
| GARRETTSVILLE
 
| OH
 
|-
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 9393.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-42-133-21076
 
| MYERS #1 UNIT  (SALTY'S DISPOSAL)
 
| ATWATER
 
| OH
 
|-
 
|-
 
| 2012-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 2116.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-42-133-21076
 
| MYERS #1 UNIT  (SALTY'S DISPOSAL)
 
| ATWATER
 
| OH
 
|-
 
|-
 
| 2012-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 3692.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 09:23, 21 May 2020

Well Details

Well ID: 37-007-20303
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: South Beaver Township
Operator Name: GEOPETRO LLC
Well Pad ID: 148174
Farm/Lease Name: DAVID THOMPSON 3H
License Status:
Spud Date:
Permit Date: 2010-11-22
Well Type: COMB. OIL&GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.752028
Longitude: -80.495778

For data sources see[1][2][3]

Well History

Date Event
2010-11-22 New Permit Application
2011-01-20 Performed Spud Operation
2011-05-21 Drilling Completion
2011-07-16 Perforation
2013-07-26 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-07-10 2011-07-10 5,778,780

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ALPHA 1427 Bactericide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.00 0.00105000
Ethanol 64-17-5 5.00 0.00075000
Water 7732-18-5 60.00 0.00896000
Glutaraldehyde 111-30-8 30.00 0.00448000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00149000
Recycled Produced Water Carrier/Base Fluid 7.58
SCALETROL 720 BJ Services Company Scale Inhibitor Ethylene glycol 107-21-1 35.00 0.00572000
Diethylene glycol 111-46-6 5.00 0.00082000
ALPHA 1427 BJ Services Company Bactericide
ClayCare BJ Services Company Clay Stabilizer Water 7732-18-5 30.00 0.02
Choline chloride 67-48-1 75.00 0.06
FRW-18 BJ Services Company Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
XLW-32 BJ Services Company Crosslinker Methanol 67-56-1 90.00 0.00985000
Boric acid 10043-35-3 20.00 0.00219000
Fresh Water Carrier/Base Fluid 79.55
GW-3LDF BJ Services Company Gelling Agent Petroleum Distillate Blend 60.00 0.05
Polysaccharide Blend 60.00 0.05
ENZYME G-NE BJ Services Company Breaker No Hazardous Components 0.00
GBW-15L BJ Services Company Breaker Sodium chloride 7647-14-5 100.00 0.00425000
BF-9L BJ Services Company pH Adjusting Agent Potassium hydroxide 1310-58-3 15.00 0.00235000
ACID, HYDROCHLORIC, 15 PCT Weatherford Acid Hydrochloric acid 7647-01-0 15.00 0.10
Water 7732-18-5 85.00 0.59
Sand (Proppant) Proppant 11.81

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 535,809.00 118 8.00 118 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 822,533.00 366 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 384,930.00 259 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 324,717.00 334 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 283,733.00 357 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 206,173.98 307 0.00 0 0.00 0
2017 GEOPETRO LLC 126,138.80 229 0.00 0 0.00 0
2018 GEOPETRO LLC 177,453.66 333 0.00 0 0.00 0
2019 GEOPETRO LLC 142,761.00 350 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 744.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 9,393.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 6,301.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 3,340.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 114
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,435.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 2,158.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 180.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 290.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 0114
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 180.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 290.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 308.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 89.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 964.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 803.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 604.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 102.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 365.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 265.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 613.00 Bbl INJECTION DISPOSAL WELL 34-133-23614
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 218.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 548.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 548.00 Bbl INJECTION DISPOSAL WELL 34-155-2-3794
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 357.67 Bbl INJECTION DISPOSAL WELL 34-155-21893
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 357.67 Bbl INJECTION DISPOSAL WELL 34-155-23203
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 357.67 Bbl INJECTION DISPOSAL WELL 34-155-21894
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 279.00 Bbl INJECTION DISPOSAL WELL 34-155-2-3794
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,371.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 131.67 Bbl INJECTION DISPOSAL WELL 34-155-21894
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 279.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-23614
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 131.67 Bbl INJECTION DISPOSAL WELL 34-155-23203
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 131.67 Bbl INJECTION DISPOSAL WELL 34-155-21893
2017 CHESAPEAKE APPALACHIA LLC Waste comment only 0.00
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,801.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 CHESAPEAKE APPALACHIA LLC 0.00
2017 CHESAPEAKE APPALACHIA LLC 1,160.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 GEOPETRO LLC Produced Fluid 663.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2018 GEOPETRO LLC Produced Fluid 1,955.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 GEOPETRO LLC Produced Fluid 2,105.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1943147 Primary Facility 2010-12-27 Routine/Complete Inspection No Violations Noted On December 27th, 2010 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was under construction. The access road was being cut in. Some temporary E&S controls were in place.
1943156 Primary Facility 2011-01-05 Routine/Complete Inspection No Violations Noted On January 5th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was still under construction. The access road was being rocked. Site ID was present. The interceptor channels and sediment trap were being constructed.
1954033 Primary Facility 2011-01-05 Drilling/Alteration No Violations Noted SITE, ACCESS, AND E&S CONTROLS ARE BEING CONSTRUCTED FOR THIS UTICA WELL.
1956850 Primary Facility 2011-02-02 Drilling/Alteration No Violations Noted CONDUCTOR IS IN. OFFICE TRAILERS ARE ON THE PAD.
1956854 Primary Facility 2011-01-24 Drilling/Alteration No Violations Noted PAD IS COMPLETE, BUT CONDUCTOR IS NOT IN.
1957460 Primary Facility 2011-02-09 Drilling/Alteration No Violations Noted CONDUCTOR IS INSTALLED IN THIS UTICA WELL.
1958625 Primary Facility 2011-02-11 Routine/Complete Inspection No Violations Noted On February 11th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was constructed. The rig was moving in and setting up. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No pit was constructed. No spills/ leaks or accelerated erosion were observed at the time of inspection.
1960856 Primary Facility 2011-03-22 Drilling/Alteration No Violations Noted UTICA WELL. BIT AT 4250'.
1960872 Primary Facility 2011-03-15 Drilling/Alteration No Violations Noted 16" CASING CEMENTED.
1960875 Primary Facility 2011-03-07 Drilling/Alteration No Violations Noted PATTERSON328 READY TO DRILL THIS UTICA WELL.
1961879 Primary Facility 2011-03-22 Routine/Complete Inspection No Violations Noted On March 22nd, 2011 I conducted a routine inspection of the above site. Drilling was taking placed. The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No pit was constructed. No spills/ leaks or accelerated erosion were observed at the time of inspection. The slopes of the pad and along the access road should be seeded and mulched or covered with erosion blanket material soon.
1974655 Primary Facility 2011-04-14 Drilling/Alteration No Violations Noted PATTERSON 328 CORING AT 8645'.
1975275 Primary Facility 2011-04-14 Routine/Complete Inspection No Violations Noted On April 14th, 2011 I conducted a routine inspection of the above site. Drilling was taking place. The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition. Site ID was present. E&S control blankets were being installed on slopes. Construction was beginning on the production/ processing pad below the site. E&S controls were functioning properly. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved.
1976537 Primary Facility 2011-04-29 Drilling/Alteration No Violations Noted PATTERSON 328 STARTING CURVE IN THIS UTICA WELL.
1983177 Primary Facility 2011-05-26 Drilling/Alteration No Violations Noted DRILLING COMPLETE. RIG COMING DOWN.
1983195 Primary Facility 2011-06-07 Drilling/Alteration No Violations Noted DRILLING COMPLETE. THIS UTICA WELL HAS NOT BEEN FRACED. THE WELL IS COVERD. PATTERSON 328 IS GONE.
1983777 Primary Facility 2011-06-21 Drilling/Alteration No Violations Noted ALL DRILLING EQUIPTMENT GONE. THE WELL HAS NOT BEEN FRACED.
1984948 Primary Facility 2011-06-03 Routine/Complete Inspection No Violations Noted On June 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. The rig had moved offsite. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. Clearing and grubbing had started on the impoundment site
1991735 Primary Facility 2011-07-12 Drilling/Alteration No Violations Noted EQUIPTMENT IS BEING SET FOR FRAC JOB. WATER IS BEING HAULED TO SITE.
1992103 Primary Facility 2011-07-12 Routine/Complete Inspection No Violations Noted On July 12th, 2011 I conducted a routine inspection of the above site. Drilling was completed. The rig had moved offsite. Crews were on site prepping for the frac. Water trucks were delivering water. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. The impoundment was constructed. The berms were hydroseeded. The impoundment was surrounded by a 6¿ security fence and was currently being filled. Water transfer pumps were on secondary containment.
1998326 Primary Facility 2011-08-24 Complaint Inspection No Violations Noted Drilling complete. Crew working on well head. Id sign onsite.
1998353 Primary Facility 2011-08-03 Drilling/Alteration No Violations Noted THIS UTICA WELL IS COMPLETE. THE WELL HAS BEEN FRACED. THE WELL WAS FLARED DURING DAYLIGHT HOURS LAST WEEKEND.
1998396 Primary Facility 2011-08-18 Routine/Complete Inspection No Violations Noted On August 19th, 2011 I conducted a routine inspection of the above site. Drilling and frac was complete. The well was in production. Six tanks were located within a steel dike structure. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event.
2001715 Primary Facility 2011-08-19 Drilling/Alteration No Violations Noted UTICA COMPLETE AND PRODUCING.
2003197 Primary Facility 2011-09-13 Drilling/Alteration No Violations Noted UTICA WELL COMPLETE AND PRODUCING. PIT LEVEL LOW.
2018478 Primary Facility 2011-10-06 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING.
2027612 Primary Facility 2011-11-22 Drilling/Alteration No Violations Noted WELL IS FRACED AND PRODUCING. THE WELL IS FENCED AND THE ACCESS IS GATED. THE SITE HAS BEEN RESEEDED.
2027922 Primary Facility 2011-11-29 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND PRODUCING.
2104563 Primary Facility 2012-10-02 Routine/Complete Inspection No Violations Noted John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. The well was drilled. Bmp's installed were functioning according to the E&S plan. No accelerated erosion or sedimentation issues were noted on site or the access road. The hillsides had been stabilized and had good growth with at least 70% vegetation. The fresh water impoundment was visually inspected and was found to be in good shape with no evidence of leakage.
2116488 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted WELL IS COMPLETE. TANKS AND PRODUCTION EQUIPTMENT ARE HOOKED UP. THE PAD IS FENCED AND LOCKED.
2124796 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING.
2259573 Primary Facility 2014-04-04 Routine/Complete Inspection No Violations Noted Well was properly labeled. Well is drilled and is equipped with two brine tanks. Water in brine tank containment was clear with no sheen. Freshwater Impoundment had the necessary two feet of freeboard. No E&S issues noted.
2363824 Primary Facility 2015-04-22 Routine/Complete Inspection No Violations Noted
2402740 Primary Facility 2015-08-18 Routine/Complete Inspection No Violations Noted THIS PRODUCING UTICA WELL IS IN GOOD CONDITION.
2450295 Primary Facility 2016-01-27 Routine/Complete Inspection Violation(s) Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2450295 746077 2016-01-27 OGA3216(C) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
746077 334793 NOV - Notice of Violation