If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20303 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.752028,"lon":-80.495778,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: South Beaver Township | |
Operator Name: GEOPETRO LLC | |
Well Pad ID: 148174 | |
Farm/Lease Name: DAVID THOMPSON 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-22 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.752028 | |
Longitude: -80.495778 |
Date | Event |
---|---|
2010-11-22 | New Permit Application |
2011-01-20 | Performed Spud Operation |
2011-05-21 | Drilling Completion |
2011-07-16 | Perforation |
2013-07-26 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-10 | 2011-07-10 | 5,778,780 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ALPHA 1427 | Bactericide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00105000 | ||
Ethanol | 64-17-5 | 5.00 | 0.00075000 | |||||
Water | 7732-18-5 | 60.00 | 0.00896000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00448000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00149000 | |||||
Recycled Produced Water | Carrier/Base Fluid | 7.58 | ||||||
SCALETROL 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00572000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00082000 | |||||
ALPHA 1427 | BJ Services Company | Bactericide | ||||||
ClayCare | BJ Services Company | Clay Stabilizer | Water | 7732-18-5 | 30.00 | 0.02 | ||
Choline chloride | 67-48-1 | 75.00 | 0.06 | |||||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
XLW-32 | BJ Services Company | Crosslinker | Methanol | 67-56-1 | 90.00 | 0.00985000 | ||
Boric acid | 10043-35-3 | 20.00 | 0.00219000 | |||||
Fresh Water | Carrier/Base Fluid | 79.55 | ||||||
GW-3LDF | BJ Services Company | Gelling Agent | Petroleum Distillate Blend | 60.00 | 0.05 | |||
Polysaccharide Blend | 60.00 | 0.05 | ||||||
ENZYME G-NE | BJ Services Company | Breaker | No Hazardous Components | 0.00 | ||||
GBW-15L | BJ Services Company | Breaker | Sodium chloride | 7647-14-5 | 100.00 | 0.00425000 | ||
BF-9L | BJ Services Company | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00235000 | ||
ACID, HYDROCHLORIC, 15 PCT | Weatherford | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.10 | ||
Water | 7732-18-5 | 85.00 | 0.59 | |||||
Sand (Proppant) | Proppant | 11.81 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 535,809.00 | 118 | 8.00 | 118 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 822,533.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 384,930.00 | 259 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 324,717.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 283,733.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 206,173.98 | 307 | 0.00 | 0 | 0.00 | 0 |
2017 | GEOPETRO LLC | 126,138.80 | 229 | 0.00 | 0 | 0.00 | 0 |
2018 | GEOPETRO LLC | 177,453.66 | 333 | 0.00 | 0 | 0.00 | 0 |
2019 | GEOPETRO LLC | 142,761.00 | 350 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 744.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 440.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 9,393.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 6,301.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3,340.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,435.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,158.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 290.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 190.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 270.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 290.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 308.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 89.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 964.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 803.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 604.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2014 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 365.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 265.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 613.00 Bbl | INJECTION DISPOSAL WELL | 34-133-23614 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 218.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 548.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 548.00 Bbl | INJECTION DISPOSAL WELL | 34-155-2-3794 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 357.67 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 357.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 357.67 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 279.00 Bbl | INJECTION DISPOSAL WELL | 34-155-2-3794 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,371.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 131.67 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 279.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-23614 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 131.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 131.67 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2017 | CHESAPEAKE APPALACHIA LLC | Waste comment only | 0.00 | ||
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,801.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | CHESAPEAKE APPALACHIA LLC | 0.00 | |||
2017 | CHESAPEAKE APPALACHIA LLC | 1,160.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 | |
2018 | GEOPETRO LLC | Produced Fluid | 663.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25506 |
2018 | GEOPETRO LLC | Produced Fluid | 1,955.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | GEOPETRO LLC | Produced Fluid | 2,105.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1943147 | Primary Facility | 2010-12-27 | Routine/Complete Inspection | No Violations Noted | On December 27th, 2010 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was under construction. The access road was being cut in. Some temporary E&S controls were in place. |
1943156 | Primary Facility | 2011-01-05 | Routine/Complete Inspection | No Violations Noted | On January 5th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was still under construction. The access road was being rocked. Site ID was present. The interceptor channels and sediment trap were being constructed. |
1954033 | Primary Facility | 2011-01-05 | Drilling/Alteration | No Violations Noted | SITE, ACCESS, AND E&S CONTROLS ARE BEING CONSTRUCTED FOR THIS UTICA WELL. |
1956850 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | CONDUCTOR IS IN. OFFICE TRAILERS ARE ON THE PAD. |
1956854 | Primary Facility | 2011-01-24 | Drilling/Alteration | No Violations Noted | PAD IS COMPLETE, BUT CONDUCTOR IS NOT IN. |
1957460 | Primary Facility | 2011-02-09 | Drilling/Alteration | No Violations Noted | CONDUCTOR IS INSTALLED IN THIS UTICA WELL. |
1958625 | Primary Facility | 2011-02-11 | Routine/Complete Inspection | No Violations Noted | On February 11th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. The well pad was constructed. The rig was moving in and setting up. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No pit was constructed. No spills/ leaks or accelerated erosion were observed at the time of inspection. |
1960856 | Primary Facility | 2011-03-22 | Drilling/Alteration | No Violations Noted | UTICA WELL. BIT AT 4250'. |
1960872 | Primary Facility | 2011-03-15 | Drilling/Alteration | No Violations Noted | 16" CASING CEMENTED. |
1960875 | Primary Facility | 2011-03-07 | Drilling/Alteration | No Violations Noted | PATTERSON328 READY TO DRILL THIS UTICA WELL. |
1961879 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | No Violations Noted | On March 22nd, 2011 I conducted a routine inspection of the above site. Drilling was taking placed. The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No pit was constructed. No spills/ leaks or accelerated erosion were observed at the time of inspection. The slopes of the pad and along the access road should be seeded and mulched or covered with erosion blanket material soon. |
1974655 | Primary Facility | 2011-04-14 | Drilling/Alteration | No Violations Noted | PATTERSON 328 CORING AT 8645'. |
1975275 | Primary Facility | 2011-04-14 | Routine/Complete Inspection | No Violations Noted | On April 14th, 2011 I conducted a routine inspection of the above site. Drilling was taking place. The rig, mud tanks, and fuel storage were all on containment. The access road was in good condition. Site ID was present. E&S control blankets were being installed on slopes. Construction was beginning on the production/ processing pad below the site. E&S controls were functioning properly. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved. |
1976537 | Primary Facility | 2011-04-29 | Drilling/Alteration | No Violations Noted | PATTERSON 328 STARTING CURVE IN THIS UTICA WELL. |
1983177 | Primary Facility | 2011-05-26 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. RIG COMING DOWN. |
1983195 | Primary Facility | 2011-06-07 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. THIS UTICA WELL HAS NOT BEEN FRACED. THE WELL IS COVERD. PATTERSON 328 IS GONE. |
1983777 | Primary Facility | 2011-06-21 | Drilling/Alteration | No Violations Noted | ALL DRILLING EQUIPTMENT GONE. THE WELL HAS NOT BEEN FRACED. |
1984948 | Primary Facility | 2011-06-03 | Routine/Complete Inspection | No Violations Noted | On June 3rd, 2011 I conducted a routine inspection of the above site. Drilling was completed. The rig had moved offsite. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. Clearing and grubbing had started on the impoundment site |
1991735 | Primary Facility | 2011-07-12 | Drilling/Alteration | No Violations Noted | EQUIPTMENT IS BEING SET FOR FRAC JOB. WATER IS BEING HAULED TO SITE. |
1992103 | Primary Facility | 2011-07-12 | Routine/Complete Inspection | No Violations Noted | On July 12th, 2011 I conducted a routine inspection of the above site. Drilling was completed. The rig had moved offsite. Crews were on site prepping for the frac. Water trucks were delivering water. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. The impoundment was constructed. The berms were hydroseeded. The impoundment was surrounded by a 6¿ security fence and was currently being filled. Water transfer pumps were on secondary containment. |
1998326 | Primary Facility | 2011-08-24 | Complaint Inspection | No Violations Noted | Drilling complete. Crew working on well head. Id sign onsite. |
1998353 | Primary Facility | 2011-08-03 | Drilling/Alteration | No Violations Noted | THIS UTICA WELL IS COMPLETE. THE WELL HAS BEEN FRACED. THE WELL WAS FLARED DURING DAYLIGHT HOURS LAST WEEKEND. |
1998396 | Primary Facility | 2011-08-18 | Routine/Complete Inspection | No Violations Noted | On August 19th, 2011 I conducted a routine inspection of the above site. Drilling and frac was complete. The well was in production. Six tanks were located within a steel dike structure. The access road was in good condition. Site ID was present. E&S controls were in place according to the ESCGP-1. No spills/ leaks or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event. |
2001715 | Primary Facility | 2011-08-19 | Drilling/Alteration | No Violations Noted | UTICA COMPLETE AND PRODUCING. |
2003197 | Primary Facility | 2011-09-13 | Drilling/Alteration | No Violations Noted | UTICA WELL COMPLETE AND PRODUCING. PIT LEVEL LOW. |
2018478 | Primary Facility | 2011-10-06 | Drilling/Alteration | No Violations Noted | WELL IS HOOKED UP AND PRODUCING. |
2027612 | Primary Facility | 2011-11-22 | Drilling/Alteration | No Violations Noted | WELL IS FRACED AND PRODUCING. THE WELL IS FENCED AND THE ACCESS IS GATED. THE SITE HAS BEEN RESEEDED. |
2027922 | Primary Facility | 2011-11-29 | Drilling/Alteration | No Violations Noted | WELL IS COMPLETE AND PRODUCING. |
2104563 | Primary Facility | 2012-10-02 | Routine/Complete Inspection | No Violations Noted | John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of this inspection, the well sign, E&S plan, well permit and the PPC plan were onsite. The site was gated for security. The well was drilled. Bmp's installed were functioning according to the E&S plan. No accelerated erosion or sedimentation issues were noted on site or the access road. The hillsides had been stabilized and had good growth with at least 70% vegetation. The fresh water impoundment was visually inspected and was found to be in good shape with no evidence of leakage. |
2116488 | Primary Facility | 2012-10-16 | Routine/Complete Inspection | No Violations Noted | WELL IS COMPLETE. TANKS AND PRODUCTION EQUIPTMENT ARE HOOKED UP. THE PAD IS FENCED AND LOCKED. |
2124796 | Primary Facility | 2012-12-17 | Drilling/Alteration | No Violations Noted | WELL IS HOOKED UP AND PRODUCING. |
2259573 | Primary Facility | 2014-04-04 | Routine/Complete Inspection | No Violations Noted | Well was properly labeled. Well is drilled and is equipped with two brine tanks. Water in brine tank containment was clear with no sheen. Freshwater Impoundment had the necessary two feet of freeboard. No E&S issues noted. |
2363824 | Primary Facility | 2015-04-22 | Routine/Complete Inspection | No Violations Noted | |
2402740 | Primary Facility | 2015-08-18 | Routine/Complete Inspection | No Violations Noted | THIS PRODUCING UTICA WELL IS IN GOOD CONDITION. |
2450295 | Primary Facility | 2016-01-27 | Routine/Complete Inspection | Violation(s) Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2450295 | 746077 | 2016-01-27 | OGA3216(C) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
746077 | 334793 | NOV - Notice of Violation |
For data sources see[8]