X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-21590"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-21590
 
| Well ID: 37-019-21590
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.755412, -80.033007 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.755412, -80.033007 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: OLIVE M MARBURGER LIVING TRUST 1
 
| Farm/Lease Name: OLIVE M MARBURGER LIVING TRUST 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 01/12/2009
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 11/21/2008
+
| Permit Date: 2008-11-21
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.755412
 
| Latitude: 40.755412
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-11-21
 +
| New Permit Application
 +
|-
 +
| 2009-01-12
 +
| Performed Spud Operation
 +
|-
 +
| 2009-01-30
 +
| Drilling Completion
 +
|-
 +
| 2009-12-03
 +
| Perforation
 +
|-
 +
| 2011-02-03
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 2009
 
| 2009
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 3,025.00
+
| style="text-align: right;" | 3025.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 152: Line 218:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 102.00
+
| style="text-align: right;" | 4,968.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 326
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 5.83
 +
| style="text-align: right;" | 31
 
|-
 
|-
 
|}
 
|}
Line 169: Line 235:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 174: Line 241:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-3
+
| 2010
| Produced Fluid (in Barrels)
+
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 320.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2011-1
+
| 2011
| Produced Fluid (in Barrels)
+
| [[PHILLIPS EXPLORATION INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PBR
 
| PBR
 
|-
 
|-
| 2013-1
+
| 2013
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 207.00 Bbl
 
| style="text-align: right;" | 207.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 101674
 
| 101674
 
|-
 
|-
| 2014-2
+
| 2014
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 403.00 Bbl
 
| style="text-align: right;" | 403.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2014-2
+
| 2014
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2015-1
+
| 2015
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 663.00 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 920.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2015-2
+
| 2016
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
| style="text-align: right;" | 257.00 Bbl
+
| Produced Fluid
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
|-
 
| 2016-1
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 54.00 Bbl
 
| style="text-align: right;" | 54.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2017-05
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 54.00 Bbl
 
| style="text-align: right;" | 54.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2018-08
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 105.00 Bbl
 
| style="text-align: right;" | 105.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 253: Line 323:
 
| 1758381
 
| 1758381
 
| Primary Facility
 
| Primary Facility
| 12/23/2008
+
| 2008-12-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 260: Line 330:
 
| 1763650
 
| 1763650
 
| Primary Facility
 
| Primary Facility
| 01/21/2009
+
| 2009-01-21
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 267: Line 337:
 
| 1766985
 
| 1766985
 
| Primary Facility
 
| Primary Facility
| 02/03/2009
+
| 2009-02-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 274: Line 344:
 
| 1768858
 
| 1768858
 
| Primary Facility
 
| Primary Facility
| 02/06/2009
+
| 2009-02-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 281: Line 351:
 
| 1777041
 
| 1777041
 
| Primary Facility
 
| Primary Facility
| 03/12/2009
+
| 2009-03-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 288: Line 358:
 
| 1782896
 
| 1782896
 
| Primary Facility
 
| Primary Facility
| 04/09/2009
+
| 2009-04-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 295: Line 365:
 
| 1805406
 
| 1805406
 
| Primary Facility
 
| Primary Facility
| 06/12/2009
+
| 2009-06-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 302: Line 372:
 
| 1813137
 
| 1813137
 
| Primary Facility
 
| Primary Facility
| 07/15/2009
+
| 2009-07-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 309: Line 379:
 
| 1827021
 
| 1827021
 
| Primary Facility
 
| Primary Facility
| 09/10/2009
+
| 2009-09-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 316: Line 386:
 
| 1830448
 
| 1830448
 
| Primary Facility
 
| Primary Facility
| 09/25/2009
+
| 2009-09-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 323: Line 393:
 
| 1846432
 
| 1846432
 
| Primary Facility
 
| Primary Facility
| 12/01/2009
+
| 2009-12-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 330: Line 400:
 
| 1847618
 
| 1847618
 
| Primary Facility
 
| Primary Facility
| 12/03/2009
+
| 2009-12-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 337: Line 407:
 
| 1902908
 
| 1902908
 
| Primary Facility
 
| Primary Facility
| 07/26/2010
+
| 2010-07-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 344: Line 414:
 
| 1930941
 
| 1930941
 
| Primary Facility
 
| Primary Facility
| 11/30/2010
+
| 2010-11-30
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 351: Line 421:
 
| 1988460
 
| 1988460
 
| Primary Facility
 
| Primary Facility
| 07/14/2011
+
| 2011-07-14
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 358: Line 428:
 
| 2022734
 
| 2022734
 
| Primary Facility
 
| Primary Facility
| 11/29/2011
+
| 2011-11-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 365: Line 435:
 
| 2032271
 
| 2032271
 
| Primary Facility
 
| Primary Facility
| 01/04/2012
+
| 2012-01-04
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 372: Line 442:
 
| 2032281
 
| 2032281
 
| Primary Facility
 
| Primary Facility
| 01/04/2012
+
| 2012-01-04
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 379: Line 449:
 
| 2361571
 
| 2361571
 
| Primary Facility
 
| Primary Facility
| 04/14/2015
+
| 2015-04-14
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 414: Line 484:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 20:36, 21 May 2020

Well Details

Well ID: 37-019-21590
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Forward Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148981
Farm/Lease Name: OLIVE M MARBURGER LIVING TRUST 1
License Status:
Spud Date:
Permit Date: 2008-11-21
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 40.755412
Longitude: -80.033007

For data sources see[1][2][3]

Well History

Date Event
2008-11-21 New Permit Application
2009-01-12 Performed Spud Operation
2009-01-30 Drilling Completion
2009-12-03 Perforation
2011-02-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PHILLIPS EXPLORATION INC 3025.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 1,512.50 5 0.00 5 0.00 0
2011 PHILLIPS EXPLORATION INC 8,226.00 63 0.00 0 0.00 0
2012 XTO ENERGY INC 4,737.00 102 0.00 0 0.00 0
2013 XTO ENERGY INC 15,083.00 113 0.00 0 36.00 112
2014 XTO ENERGY INC 18,921.00 65 0.00 0 0.00 0
2015 XTO ENERGY INC 31,573.60 346 0.00 0 0.00 0
2016 XTO ENERGY INC 14,654.00 224 0.00 0 2.04 24
2017 XTO ENERGY INC 17,590.80 231 0.00 0 0.00 0
2018 XTO ENERGY INC 8,269.00 319 0.00 0 0.00 0
2019 XTO ENERGY INC 4,968.00 326 0.00 0 5.83 31

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 PHILLIPS EXPLORATION INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2013 XTO ENERGY INC Produced Fluid 207.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2014 XTO ENERGY INC Produced Fluid 403.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 920.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 54.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 54.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1758381 Primary Facility 2008-12-23 Routine/Complete Inspection No Violations Noted
1763650 Primary Facility 2009-01-21 Drilling/Alteration No Violations Noted
1766985 Primary Facility 2009-02-03 Drilling/Alteration No Violations Noted
1768858 Primary Facility 2009-02-06 Routine/Complete Inspection No Violations Noted
1777041 Primary Facility 2009-03-12 Routine/Complete Inspection No Violations Noted
1782896 Primary Facility 2009-04-09 Routine/Complete Inspection No Violations Noted
1805406 Primary Facility 2009-06-12 Routine/Complete Inspection No Violations Noted
1813137 Primary Facility 2009-07-15 Routine/Complete Inspection No Violations Noted
1827021 Primary Facility 2009-09-10 Routine/Complete Inspection No Violations Noted
1830448 Primary Facility 2009-09-25 Drilling/Alteration No Violations Noted
1846432 Primary Facility 2009-12-01 Routine/Complete Inspection No Violations Noted
1847618 Primary Facility 2009-12-03 Routine/Complete Inspection No Violations Noted
1902908 Primary Facility 2010-07-26 Routine/Complete Inspection No Violations Noted
1930941 Primary Facility 2010-11-30 Site Restoration No Violations Noted Site fully restored. At least 70% perrennial vegetative cover. Pits reclaimed. Acess road in good contition. Well equipped for production. Tanks diked.
1988460 Primary Facility 2011-07-14 Routine/Partial Inspection No Violations Noted
2022734 Primary Facility 2011-11-29 Routine/Complete Inspection No Violations Noted
2032271 Primary Facility 2012-01-04 Site Restoration No Violations Noted
2032281 Primary Facility 2012-01-04 Site Restoration No Violations Noted
2361571 Primary Facility 2015-04-14 Routine/Partial Inspection No Violations Noted

For data sources see[7]

References