If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21590 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.755412,"lon":-80.033007,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Forward Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148981 | |
Farm/Lease Name: OLIVE M MARBURGER LIVING TRUST 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-11-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.755412 | |
Longitude: -80.033007 |
Date | Event |
---|---|
2008-11-21 | New Permit Application |
2009-01-12 | Performed Spud Operation |
2009-01-30 | Drilling Completion |
2009-12-03 | Perforation |
2011-02-03 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 3025.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 1,512.50 | 5 | 0.00 | 5 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 8,226.00 | 63 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 4,737.00 | 102 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 15,083.00 | 113 | 0.00 | 0 | 36.00 | 112 |
2014 | XTO ENERGY INC | 18,921.00 | 65 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 31,573.60 | 346 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 14,654.00 | 224 | 0.00 | 0 | 2.04 | 24 |
2017 | XTO ENERGY INC | 17,590.80 | 231 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 8,269.00 | 319 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 4,968.00 | 326 | 0.00 | 0 | 5.83 | 31 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 30.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2013 | XTO ENERGY INC | Produced Fluid | 207.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2014 | XTO ENERGY INC | Produced Fluid | 403.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 920.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1758381 | Primary Facility | 2008-12-23 | Routine/Complete Inspection | No Violations Noted | |
1763650 | Primary Facility | 2009-01-21 | Drilling/Alteration | No Violations Noted | |
1766985 | Primary Facility | 2009-02-03 | Drilling/Alteration | No Violations Noted | |
1768858 | Primary Facility | 2009-02-06 | Routine/Complete Inspection | No Violations Noted | |
1777041 | Primary Facility | 2009-03-12 | Routine/Complete Inspection | No Violations Noted | |
1782896 | Primary Facility | 2009-04-09 | Routine/Complete Inspection | No Violations Noted | |
1805406 | Primary Facility | 2009-06-12 | Routine/Complete Inspection | No Violations Noted | |
1813137 | Primary Facility | 2009-07-15 | Routine/Complete Inspection | No Violations Noted | |
1827021 | Primary Facility | 2009-09-10 | Routine/Complete Inspection | No Violations Noted | |
1830448 | Primary Facility | 2009-09-25 | Drilling/Alteration | No Violations Noted | |
1846432 | Primary Facility | 2009-12-01 | Routine/Complete Inspection | No Violations Noted | |
1847618 | Primary Facility | 2009-12-03 | Routine/Complete Inspection | No Violations Noted | |
1902908 | Primary Facility | 2010-07-26 | Routine/Complete Inspection | No Violations Noted | |
1930941 | Primary Facility | 2010-11-30 | Site Restoration | No Violations Noted | Site fully restored. At least 70% perrennial vegetative cover. Pits reclaimed. Acess road in good contition. Well equipped for production. Tanks diked. |
1988460 | Primary Facility | 2011-07-14 | Routine/Partial Inspection | No Violations Noted | |
2022734 | Primary Facility | 2011-11-29 | Routine/Complete Inspection | No Violations Noted | |
2032271 | Primary Facility | 2012-01-04 | Site Restoration | No Violations Noted | |
2032281 | Primary Facility | 2012-01-04 | Site Restoration | No Violations Noted | |
2361571 | Primary Facility | 2015-04-14 | Routine/Partial Inspection | No Violations Noted |
For data sources see[7]