X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-22289"

m
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-22289
 
| Well ID: 37-125-22289
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.188726, -80.373789 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.188703, -80.374011 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[Blaine Township,_Washington_County,_Pennsylvania|Blaine Township]]
 +
|-
 +
| Operator Name: [[DALLAS ENERGY LLC]]
 +
|-
 +
| Well Pad ID:
 
|-
 
|-
| Operator Name: [[SWEPI LP]]
+
| Farm/Lease Name: SAMUEL WOODBURN 028-A
 
|-
 
|-
| First Permit Date: 2006-02-01
+
| License Status: PLUGGED & ABANDONED
 
|-
 
|-
| Last Permit Date: 2006-02-01
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2006-03-10
+
| Permit Date: 2006-02-01
 
|-
 
|-
| Unconventional: No
+
| Well Type: INJECTION
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: N
 
|-
 
|-
| Violations: None
+
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 40.188726
+
| Conservation: No
 
|-
 
|-
| Longitude: -80.373789
+
| Latitude: 40.188703
 
|-
 
|-
 +
| Longitude: -80.374011
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Production Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
+
|-
!scope="col" | CONDENSATE QUANTITY
+
| 2006-02-01
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| New Permit Application
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 2006-02-16
 +
| Drilling Completion
 +
|-
 +
| 2006-03-01
 +
| Perforation
 
|-
 
|-
| 2013-0
+
| 2006-03-02
| style="text-align:right;" | 0.0
+
| Performed Stimulation 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2006-03-10
 +
| Performed Spud Operation
 
|-
 
|-
| 2012-0
+
| 2006-04-04
| style="text-align:right;" | 0.0
+
| NEWLY DRILLED
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2015-09-08
 +
| Drilling Completion
 
|-
 
|-
| 2011-0
+
| 2016-06-28
| style="text-align:right;" | 0.0
+
| FULLY PLUGGED
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2010-0
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Job Number
| style="text-align:right;" | 0.0
+
!scope="col" | Trade Name
| style="text-align:right;" | 0.0
+
!scope="col" | Supplier
| style="text-align:right;" | 0.0
+
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 2008-0
+
| 2006-03-02
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
 
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 +
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator Name
!scope="col" | QUANTITY
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | UNITS
+
!scope="col" | Gas Production Days
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Oil Production Days
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Water Quantity (bbl)
!scope="col" | FACILITY CITY
+
!scope="col" | Water Production Days
!scope="col" | FACILITY STATE
+
|-
 +
| 2008
 +
| [[EAST RESOURCES INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010
 +
| [[EAST RESOURCES MGMT LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2398764
 +
| Primary Facility
 +
| 2015-07-13
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Discusssed PTA procedures in coal mined areas and alternate methods.  NOVIO
 +
|-
 +
| 2400468
 +
| Primary Facility
 +
| 2015-07-23
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Reviewed bond log, gave okay to plug and pull casing as planned.  NOVIO
 +
|-
 +
| 2400482
 +
| Primary Facility
 +
| 2015-07-31
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Rig waiting on SCCSO.  NOVIO
 +
|-
 +
| 2400502
 +
| Primary Facility
 +
| 2015-08-05
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Rig on location.  Tbg still in place.  Crew on safety shutdown day.  NOVIO
 +
|-
 +
| 2418997
 +
| Primary Facility
 +
| 2015-08-07
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Adverse Event or Action Reported
 +
| Pipe tub and pipe rack remain on location after plugging. Cellar is covered w/ wheelbarrow, remains to be filled and area needs graded & seeded. No monument set yet.
 +
|-
 +
| 2419656
 +
| Primary Facility
 +
| 2015-07-08
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| ConServ is finishing getting rigged up on well. Discussed upcoming activity w/ Jeff Loney and Luke Hartzell from SWEPI.
 +
|-
 +
| 2419671
 +
| Primary Facility
 +
| 2015-07-13
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| Met w/ Eric Peterson at wellsite to discuss plugging procedures w/ SWEPI & ConServ. ConServ has cut tubing above packer and retrieved it after numerous unsuccessful attempts to release packer.
 +
|-
 +
| 2419684
 +
| Primary Facility
 +
| 2015-07-14
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| ConServ TIH w/ 1" cement string, snub into tubing above packer and continue to ~2700 feet to spot bottom plug.
 +
|-
 +
| 2419687
 +
| Primary Facility
 +
| 2015-07-15
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| ConServ pumped bottom cement plug below packer, partially TOOH w/ cement string, WOC.
 +
|-
 +
| 2419694
 +
| Primary Facility
 +
| 2015-07-20
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| ConServ shot collar at 1160 feet on 4 1/2" casing. Casing pulled free.
 +
|-
 +
| 2420638
 +
| Primary Facility
 +
| 2015-10-30
 +
| Plugging(Includes Plugged/Mined Through)
 +
| In Compliance with Schedule
 +
| Revisited site to confirm  monument had been set. Site has been restored for some time since plugging.
 +
|-
 +
| 2445308
 +
| Primary Facility
 +
| 2016-01-28
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| Monument is erected.  Location still in need of final reclaimation.  NOVIO
 +
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 00:17, 2 June 2020

Well Details

Well ID: 37-125-22289
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Blaine Township
Operator Name: DALLAS ENERGY LLC
Well Pad ID:
Farm/Lease Name: SAMUEL WOODBURN 028-A
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2006-02-01
Well Type: INJECTION
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.188703
Longitude: -80.374011

For data sources see[1][2][3]

Well History

Date Event
2006-02-01 New Permit Application
2006-02-16 Drilling Completion
2006-03-01 Perforation
2006-03-02 Performed Stimulation
2006-03-10 Performed Spud Operation
2006-04-04 NEWLY DRILLED
2015-09-08 Drilling Completion
2016-06-28 FULLY PLUGGED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2006-03-02 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2010 EAST RESOURCES MGMT LLC 0.00 0 0.00 0 0.00 0
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2398764 Primary Facility 2015-07-13 Plugging(Includes Plugged/Mined Through) No Violations Noted Discusssed PTA procedures in coal mined areas and alternate methods. NOVIO
2400468 Primary Facility 2015-07-23 Plugging(Includes Plugged/Mined Through) No Violations Noted Reviewed bond log, gave okay to plug and pull casing as planned. NOVIO
2400482 Primary Facility 2015-07-31 Plugging(Includes Plugged/Mined Through) No Violations Noted Rig waiting on SCCSO. NOVIO
2400502 Primary Facility 2015-08-05 Plugging(Includes Plugged/Mined Through) No Violations Noted Rig on location. Tbg still in place. Crew on safety shutdown day. NOVIO
2418997 Primary Facility 2015-08-07 Plugging(Includes Plugged/Mined Through) No Adverse Event or Action Reported Pipe tub and pipe rack remain on location after plugging. Cellar is covered w/ wheelbarrow, remains to be filled and area needs graded & seeded. No monument set yet.
2419656 Primary Facility 2015-07-08 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ is finishing getting rigged up on well. Discussed upcoming activity w/ Jeff Loney and Luke Hartzell from SWEPI.
2419671 Primary Facility 2015-07-13 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Met w/ Eric Peterson at wellsite to discuss plugging procedures w/ SWEPI & ConServ. ConServ has cut tubing above packer and retrieved it after numerous unsuccessful attempts to release packer.
2419684 Primary Facility 2015-07-14 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ TIH w/ 1" cement string, snub into tubing above packer and continue to ~2700 feet to spot bottom plug.
2419687 Primary Facility 2015-07-15 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ pumped bottom cement plug below packer, partially TOOH w/ cement string, WOC.
2419694 Primary Facility 2015-07-20 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ shot collar at 1160 feet on 4 1/2" casing. Casing pulled free.
2420638 Primary Facility 2015-10-30 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Revisited site to confirm monument had been set. Site has been restored for some time since plugging.
2445308 Primary Facility 2016-01-28 Plugging(Includes Plugged/Mined Through) No Violations Noted Monument is erected. Location still in need of final reclaimation. NOVIO

For data sources see[7]

References