If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0274280807000 | | Well ID: 0274280807000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 51.291622, -113.90435 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/07-08-027-28W4/0 | | Location: 00/07-08-027-28W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/07-08-027-28 W4/00 | | Location Alias 2: 00/07-08-027-28 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 027 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 28 | ||
+ | |- | ||
+ | | Section: 08 | ||
|- | |- | ||
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | | County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | ||
Line 17: | Line 27: | ||
| Well Name: PW GAS CROSS 7-8-27-28 | | Well Name: PW GAS CROSS 7-8-27-28 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[TAQA North Ltd.]] |
|- | |- | ||
| License Number: 0073383 | | License Number: 0073383 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1979-02-18 | | Final Drill Date: 1979-02-18 | ||
|- | |- | ||
− | | Well Total Depth: 2660 m | + | | Well Total Depth: 2660.00 m |
|- | |- | ||
| Surface Hole Latitude: 51.291622 | | Surface Hole Latitude: 51.291622 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1978-12-08 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1979-02-18 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1979-02-19 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1979-02-21 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1979-06-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1979-06-01 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1979-06-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1979-06-04 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1979-06-07 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1979-07-11 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2012-01-10 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-01-10 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2012-01-10 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-01-10 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 2012-01-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-01-13 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-01-13 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-01-15 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-01-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-01-19 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-01-20 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-01-22 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-01-25 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-01-25 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-01-31 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-01-31 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-02-03 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2012-02-09 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-02-09 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-09 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2012-02-11 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-02-11 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2012-02-11 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-02-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-13 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2012-02-13 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-02-14 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-14 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-02-15 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-17 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-02-17 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-02-17 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-23 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-02-24 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2012-02-24 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-02-25 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2012-04-24 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | | 2012-04-24 | ||
+ | | Well Mode changed to Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 243: | ||
| 1979-06-01 | | 1979-06-01 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2626. | + | | style="text-align: right;" | 2626.20 |
− | | style="text-align: right;" | 2635. | + | | style="text-align: right;" | 2635.50 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1979-06-02 | | 1979-06-02 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2618 | + | | style="text-align: right;" | 2618.00 |
− | | style="text-align: right;" | 2626. | + | | style="text-align: right;" | 2626.20 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1979-06-04 | | 1979-06-04 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 2618 | + | | style="text-align: right;" | 2618.00 |
− | | style="text-align: right;" | 2635. | + | | style="text-align: right;" | 2635.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1979-06-07 | | 1979-06-07 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 2618 | + | | style="text-align: right;" | 2618.00 |
− | | style="text-align: right;" | 2635. | + | | style="text-align: right;" | 2635.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-01-10 | | 2012-01-10 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 2580 | + | | style="text-align: right;" | 2580.00 |
− | | style="text-align: right;" | 2595 | + | | style="text-align: right;" | 2595.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-01-13 | | 2012-01-13 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1001 | + | | style="text-align: right;" | 1001.00 |
− | | style="text-align: right;" | 1003 | + | | style="text-align: right;" | 1003.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-01-15 | | 2012-01-15 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1001 | + | | style="text-align: right;" | 1001.00 |
− | | style="text-align: right;" | 1003 | + | | style="text-align: right;" | 1003.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-01-19 | | 2012-01-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2555 | + | | style="text-align: right;" | 2555.00 |
− | | style="text-align: right;" | 2556 | + | | style="text-align: right;" | 2556.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-01-20 | | 2012-01-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 2555 | + | | style="text-align: right;" | 2555.00 |
− | | style="text-align: right;" | 2556 | + | | style="text-align: right;" | 2556.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-01-22 | | 2012-01-22 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2556 | + | | style="text-align: right;" | 2556.00 |
− | | style="text-align: right;" | 2557 | + | | style="text-align: right;" | 2557.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-01-25 | | 2012-01-25 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2579 | + | | style="text-align: right;" | 2579.00 |
− | | style="text-align: right;" | 2580 | + | | style="text-align: right;" | 2580.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-01-31 | | 2012-01-31 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 2579 | + | | style="text-align: right;" | 2579.00 |
− | | style="text-align: right;" | 2580 | + | | style="text-align: right;" | 2580.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-03 | | 2012-02-03 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 2357 | + | | style="text-align: right;" | 2357.00 |
− | | style="text-align: right;" | 2579 | + | | style="text-align: right;" | 2579.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-09 | | 2012-02-09 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 2344 | + | | style="text-align: right;" | 2344.00 |
− | | style="text-align: right;" | 2345 | + | | style="text-align: right;" | 2345.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-09 | | 2012-02-09 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1323 | + | | style="text-align: right;" | 1323.00 |
− | | style="text-align: right;" | 1330 | + | | style="text-align: right;" | 1330.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-09 | | 2012-02-09 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1321 | + | | style="text-align: right;" | 1321.00 |
− | | style="text-align: right;" | 1323 | + | | style="text-align: right;" | 1323.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-09 | | 2012-02-09 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1017 | + | | style="text-align: right;" | 1017.00 |
− | | style="text-align: right;" | 1019 | + | | style="text-align: right;" | 1019.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-11 | | 2012-02-11 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1321 | + | | style="text-align: right;" | 1321.00 |
− | | style="text-align: right;" | 1323 | + | | style="text-align: right;" | 1323.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-11 | | 2012-02-11 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1019 | + | | style="text-align: right;" | 1019.00 |
− | | style="text-align: right;" | 1321 | + | | style="text-align: right;" | 1321.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-11 | | 2012-02-11 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1017 | + | | style="text-align: right;" | 1017.00 |
− | | style="text-align: right;" | 1019 | + | | style="text-align: right;" | 1019.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-11 | | 2012-02-11 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 933 | + | | style="text-align: right;" | 933.00 |
− | | style="text-align: right;" | 1017 | + | | style="text-align: right;" | 1017.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-11 | | 2012-02-11 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 895 | + | | style="text-align: right;" | 895.00 |
− | | style="text-align: right;" | 905 | + | | style="text-align: right;" | 905.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-12 | | 2012-02-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 893 | + | | style="text-align: right;" | 893.00 |
− | | style="text-align: right;" | 895 | + | | style="text-align: right;" | 895.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-12 | | 2012-02-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 724 | + | | style="text-align: right;" | 724.00 |
− | | style="text-align: right;" | 726 | + | | style="text-align: right;" | 726.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-13 | | 2012-02-13 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 893 | + | | style="text-align: right;" | 893.00 |
− | | style="text-align: right;" | 895 | + | | style="text-align: right;" | 895.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-13 | | 2012-02-13 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 726 | + | | style="text-align: right;" | 726.00 |
− | | style="text-align: right;" | 893 | + | | style="text-align: right;" | 893.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-13 | | 2012-02-13 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 724 | + | | style="text-align: right;" | 724.00 |
− | | style="text-align: right;" | 726 | + | | style="text-align: right;" | 726.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-13 | | 2012-02-13 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 619 | + | | style="text-align: right;" | 619.00 |
− | | style="text-align: right;" | 724 | + | | style="text-align: right;" | 724.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-14 | | 2012-02-14 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 594 | + | | style="text-align: right;" | 594.00 |
− | | style="text-align: right;" | 596 | + | | style="text-align: right;" | 596.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-15 | | 2012-02-15 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 508 | + | | style="text-align: right;" | 508.00 |
− | | style="text-align: right;" | 510 | + | | style="text-align: right;" | 510.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-17 | | 2012-02-17 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 594 | + | | style="text-align: right;" | 594.00 |
− | | style="text-align: right;" | 596 | + | | style="text-align: right;" | 596.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-17 | | 2012-02-17 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 494 | + | | style="text-align: right;" | 494.00 |
− | | style="text-align: right;" | 591 | + | | style="text-align: right;" | 591.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-17 | | 2012-02-17 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 485 | + | | style="text-align: right;" | 485.00 |
− | | style="text-align: right;" | 487 | + | | style="text-align: right;" | 487.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-23 | | 2012-02-23 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 462 | + | | style="text-align: right;" | 462.00 |
− | | style="text-align: right;" | 480 | + | | style="text-align: right;" | 480.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-24 | | 2012-02-24 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 315 | + | | style="text-align: right;" | 315.00 |
− | | style="text-align: right;" | 316 | + | | style="text-align: right;" | 316.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2012-02-24 | | 2012-02-24 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 315 | + | | style="text-align: right;" | 315.00 |
− | | style="text-align: right;" | 316 | + | | style="text-align: right;" | 316.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2012-02-25 | | 2012-02-25 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 301 | + | | style="text-align: right;" | 301.00 |
− | | style="text-align: right;" | 310 | + | | style="text-align: right;" | 310.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 298: | Line 467: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 339: | Line 522: | ||
|- | |- | ||
| 2012-04-24 | | 2012-04-24 | ||
− | | No Incident | + | | No Incident Encountered |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
|- | |- | ||
|} | |} | ||
Line 347: | Line 530: | ||
| title = General Well Data File - Tour-Occurence Data | | title = General Well Data File - Tour-Occurence Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Alberta]][[Category:Wells]] | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0274280807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.291622,"lon":-113.90435,"icon":""}]} |
Location: 00/07-08-027-28W4/0 | |
Location Alias: 00/07-08-27-28 W4M | |
Location Alias 2: 00/07-08-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 08 | |
County/Municipality: Rocky View County | |
Well Name: PW GAS CROSS 7-8-27-28 | |
Operator Name: TAQA North Ltd. | |
License Number: 0073383 | |
License Date: 1978-12-08 | |
License Status: Abandoned | |
Spud Date: 1979-01-15 | |
Final Drill Date: 1979-02-18 | |
Well Total Depth: 2660.00 m | |
Surface Hole Latitude: 51.291622 | |
Surface Hole Longitude: -113.90435 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-12-08 | Obtained License |
1979-02-18 | Finished Drilling |
1979-02-19 | Drill Stem Test Performed |
1979-02-21 | Production Casing Operation Performed |
1979-06-01 | Perforation Treatment Performed - Jet Perforation |
1979-06-01 | Well Log Performed |
1979-06-02 | Perforation Treatment Performed - Jet Perforation |
1979-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-06-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-11 | Well Mode changed to Drilled and Cased |
2012-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-10 | Plug Back Performed |
2012-01-10 | Well Log Performed |
2012-01-10 | Well Mode changed to Abandoned Zone |
2012-01-11 | Well Log Performed |
2012-01-13 | Perforation Treatment Performed - Jet Perforation |
2012-01-13 | Well Log Performed |
2012-01-15 | Perforation Treatment Performed - Cement Squeeze |
2012-01-19 | Perforation Treatment Performed - Jet Perforation |
2012-01-19 | Well Log Performed |
2012-01-20 | Perforation Treatment Performed - Cement Squeeze |
2012-01-22 | Perforation Treatment Performed - Jet Perforation |
2012-01-25 | Perforation Treatment Performed - Jet Perforation |
2012-01-25 | Well Log Performed |
2012-01-31 | Perforation Treatment Performed - Cement Squeeze |
2012-01-31 | Well Log Performed |
2012-02-03 | Perforation Treatment Performed - Cement Plug |
2012-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-09 | Perforation Treatment Performed - Jet Perforation |
2012-02-09 | Plug Back Performed |
2012-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-11 | Perforation Treatment Performed - Cement Plug |
2012-02-11 | Perforation Treatment Performed - Cement Squeeze |
2012-02-12 | Perforation Treatment Performed - Jet Perforation |
2012-02-13 | Perforation Treatment Performed - Cement Plug |
2012-02-13 | Perforation Treatment Performed - Cement Squeeze |
2012-02-14 | Perforation Treatment Performed - Jet Perforation |
2012-02-14 | Well Log Performed |
2012-02-15 | Perforation Treatment Performed - Jet Perforation |
2012-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-17 | Perforation Treatment Performed - Cement Squeeze |
2012-02-17 | Perforation Treatment Performed - Jet Perforation |
2012-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-02-24 | Perforation Treatment Performed - Cement Squeeze |
2012-02-24 | Perforation Treatment Performed - Jet Perforation |
2012-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-24 | Well Abandoned |
2012-04-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-06-01 | Perforation | 2626.20 | 2635.50 | 7 |
1979-06-02 | Perforation | 2618.00 | 2626.20 | 7 |
1979-06-04 | Acid Treatment | 2618.00 | 2635.50 | 0 |
1979-06-07 | Acid Treatment | 2618.00 | 2635.50 | 0 |
2012-01-10 | Packing Device Capped w/Cement | 2580.00 | 2595.00 | 0 |
2012-01-13 | Perforation | 1001.00 | 1003.00 | 17 |
2012-01-15 | Cement Squeeze | 1001.00 | 1003.00 | 0 |
2012-01-19 | Perforation | 2555.00 | 2556.00 | 17 |
2012-01-20 | Cement Squeeze | 2555.00 | 2556.00 | 0 |
2012-01-22 | Perforation | 2556.00 | 2557.00 | 17 |
2012-01-25 | Perforation | 2579.00 | 2580.00 | 17 |
2012-01-31 | Cement Squeeze | 2579.00 | 2580.00 | 0 |
2012-02-03 | Cement Plug | 2357.00 | 2579.00 | 0 |
2012-02-09 | Packing Device Capped w/Cement | 2344.00 | 2345.00 | 0 |
2012-02-09 | Packing Device Capped w/Cement | 1323.00 | 1330.00 | 0 |
2012-02-09 | Perforation | 1321.00 | 1323.00 | 17 |
2012-02-09 | Perforation | 1017.00 | 1019.00 | 17 |
2012-02-11 | Cement Squeeze | 1321.00 | 1323.00 | 0 |
2012-02-11 | Cement Plug | 1019.00 | 1321.00 | 0 |
2012-02-11 | Cement Squeeze | 1017.00 | 1019.00 | 0 |
2012-02-11 | Cement Plug | 933.00 | 1017.00 | 0 |
2012-02-11 | Packing Device Capped w/Cement | 895.00 | 905.00 | 0 |
2012-02-12 | Perforation | 893.00 | 895.00 | 17 |
2012-02-12 | Perforation | 724.00 | 726.00 | 17 |
2012-02-13 | Cement Squeeze | 893.00 | 895.00 | 0 |
2012-02-13 | Cement Plug | 726.00 | 893.00 | 0 |
2012-02-13 | Cement Squeeze | 724.00 | 726.00 | 0 |
2012-02-13 | Cement Plug | 619.00 | 724.00 | 0 |
2012-02-14 | Perforation | 594.00 | 596.00 | 17 |
2012-02-15 | Perforation | 508.00 | 510.00 | 17 |
2012-02-17 | Cement Squeeze | 594.00 | 596.00 | 0 |
2012-02-17 | Packing Device Capped w/Cement | 494.00 | 591.00 | 0 |
2012-02-17 | Perforation | 485.00 | 487.00 | 17 |
2012-02-23 | Packing Device Capped w/Cement | 462.00 | 480.00 | 0 |
2012-02-24 | Perforation | 315.00 | 316.00 | 17 |
2012-02-24 | Cement Squeeze | 315.00 | 316.00 | 0 |
2012-02-25 | Packing Device Capped w/Cement | 301.00 | 310.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]