X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0395083316020"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0395083316020
 
| Well ID: 0395083316020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.388258, -115.088883 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.388193, -115.088883 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/16-33-039-08W5/0
 
| Location: 02/16-33-039-08W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/16-33-039-08 W5/00
 
| Location Alias 2: 02/16-33-039-08 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 039
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 33
 
|-
 
|-
 
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
Line 17: Line 27:
 
| Well Name: YANGARRA HZ 102 FERRIER 16-33-39-8
 
| Well Name: YANGARRA HZ 102 FERRIER 16-33-39-8
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Yangarra Resources Corp.]]
 
|-
 
|-
 
| License Number: 0490597
 
| License Number: 0490597
Line 23: Line 33:
 
| License Date: 2018-08-24
 
| License Date: 2018-08-24
 
|-
 
|-
| License Status: Issued
+
| License Status: Amended
 
|-
 
|-
| Spud Date:  
+
| Spud Date: 2019-07-24
 
|-
 
|-
| Final Drill Date:  
+
| Final Drill Date: 2019-08-02
 
|-
 
|-
| Well Total Depth: N/A m
+
| Well Total Depth: 4036.00 m
 
|-
 
|-
| Surface Hole Latitude: 52.388258
+
| Surface Hole Latitude: 52.388193
 
|-
 
|-
 
| Surface Hole Longitude: -115.088883
 
| Surface Hole Longitude: -115.088883
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-08-24
 +
| Obtained License
 +
|-
 +
| 2019-07-24
 +
| Drill To LD
 +
|-
 +
| 2019-07-25
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2019-07-29
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2019-07-31
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2019-08-02
 +
| Finished Drilling
 +
|-
 +
| 2019-08-02
 +
| Well Log Performed
 +
|-
 +
| 2019-08-02
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2019-08-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 2019-08-04
 +
| Rig Released
 +
|-
 +
| 2019-09-28
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2019-09-29
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2019-09-30
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2019-10-01
 +
| Well Began Production
 +
|-
 +
| 2019-10-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2019-10-01
 +
| Well Mode changed to Flowing
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
<!--== Spud Table ==
+
== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Spud Date
 
!scope="col" | Spud Date
Line 54: Line 124:
 
!scope="col" | Activity Type
 
!scope="col" | Activity Type
 
|-
 
|-
|}-->
+
| 2019-07-24
 
+
| [[Stampede Drilling A Division Of Matrix Energy Technologi]]
<!--== Directional Drilling ==
+
| style="text-align: right;" | 5
 +
| style="text-align: right;" |
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Start Date
 
!scope="col" | Start Date
Line 62: Line 143:
 
!scope="col" | Reason
 
!scope="col" | Reason
 
|-
 
|-
|}-->
+
| 2019-07-29
 
+
| style="text-align: right;" | 1770.00
<!--== Perforation Treatments ==
+
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2019-07-31
 +
| style="text-align: right;" | 2545.40
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Perforation Date
 
!scope="col" | Perforation Date
Line 72: Line 166:
 
!scope="col" style="text-align: right;" | Number of Shots
 
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
|}-->
+
| 2019-09-28
 
+
| Multi-Stage Fracture
<!--== Fracking Activities ==
+
| style="text-align: right;" | 3995.90
 +
| style="text-align: right;" | 3996.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3972.80
 +
| style="text-align: right;" | 3972.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3955.10
 +
| style="text-align: right;" | 3955.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3937.60
 +
| style="text-align: right;" | 3937.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3920.20
 +
| style="text-align: right;" | 3920.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3902.80
 +
| style="text-align: right;" | 3902.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3885.20
 +
| style="text-align: right;" | 3885.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3867.90
 +
| style="text-align: right;" | 3868.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3850.50
 +
| style="text-align: right;" | 3850.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3833.20
 +
| style="text-align: right;" | 3833.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3815.80
 +
| style="text-align: right;" | 3815.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3798.20
 +
| style="text-align: right;" | 3798.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3780.90
 +
| style="text-align: right;" | 3781.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3763.60
 +
| style="text-align: right;" | 3763.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3745.90
 +
| style="text-align: right;" | 3746.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3728.30
 +
| style="text-align: right;" | 3728.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3710.70
 +
| style="text-align: right;" | 3710.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3693.30
 +
| style="text-align: right;" | 3693.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3675.80
 +
| style="text-align: right;" | 3675.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3658.40
 +
| style="text-align: right;" | 3658.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3641.00
 +
| style="text-align: right;" | 3641.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3623.60
 +
| style="text-align: right;" | 3623.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3606.30
 +
| style="text-align: right;" | 3606.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3589.00
 +
| style="text-align: right;" | 3589.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3571.50
 +
| style="text-align: right;" | 3571.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3554.10
 +
| style="text-align: right;" | 3554.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3537.00
 +
| style="text-align: right;" | 3537.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3519.60
 +
| style="text-align: right;" | 3519.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3502.30
 +
| style="text-align: right;" | 3502.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3484.70
 +
| style="text-align: right;" | 3484.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3467.30
 +
| style="text-align: right;" | 3467.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3450.00
 +
| style="text-align: right;" | 3450.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3432.50
 +
| style="text-align: right;" | 3432.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3415.30
 +
| style="text-align: right;" | 3415.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3397.70
 +
| style="text-align: right;" | 3397.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3380.40
 +
| style="text-align: right;" | 3380.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3362.70
 +
| style="text-align: right;" | 3362.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3345.40
 +
| style="text-align: right;" | 3345.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3327.90
 +
| style="text-align: right;" | 3328.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3310.40
 +
| style="text-align: right;" | 3310.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3292.80
 +
| style="text-align: right;" | 3292.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3275.20
 +
| style="text-align: right;" | 3275.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3257.80
 +
| style="text-align: right;" | 3257.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3240.30
 +
| style="text-align: right;" | 3240.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3223.00
 +
| style="text-align: right;" | 3223.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3205.60
 +
| style="text-align: right;" | 3205.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3188.10
 +
| style="text-align: right;" | 3188.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3170.50
 +
| style="text-align: right;" | 3170.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3153.10
 +
| style="text-align: right;" | 3153.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3135.60
 +
| style="text-align: right;" | 3135.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3117.90
 +
| style="text-align: right;" | 3118.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3100.40
 +
| style="text-align: right;" | 3100.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3082.60
 +
| style="text-align: right;" | 3082.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3065.30
 +
| style="text-align: right;" | 3065.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3047.60
 +
| style="text-align: right;" | 3047.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3029.80
 +
| style="text-align: right;" | 3029.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3012.30
 +
| style="text-align: right;" | 3012.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2994.70
 +
| style="text-align: right;" | 2994.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2977.20
 +
| style="text-align: right;" | 2977.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2959.90
 +
| style="text-align: right;" | 2960.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2942.40
 +
| style="text-align: right;" | 2942.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2925.10
 +
| style="text-align: right;" | 2925.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2907.50
 +
| style="text-align: right;" | 2907.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2890.00
 +
| style="text-align: right;" | 2890.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2872.60
 +
| style="text-align: right;" | 2872.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2854.90
 +
| style="text-align: right;" | 2855.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2837.60
 +
| style="text-align: right;" | 2837.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2820.10
 +
| style="text-align: right;" | 2820.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2803.10
 +
| style="text-align: right;" | 2803.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2785.30
 +
| style="text-align: right;" | 2785.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2768.10
 +
| style="text-align: right;" | 2768.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2750.70
 +
| style="text-align: right;" | 2750.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2733.20
 +
| style="text-align: right;" | 2733.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2715.70
 +
| style="text-align: right;" | 2715.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2698.30
 +
| style="text-align: right;" | 2698.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2680.70
 +
| style="text-align: right;" | 2680.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2663.20
 +
| style="text-align: right;" | 2663.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2645.40
 +
| style="text-align: right;" | 2645.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2627.90
 +
| style="text-align: right;" | 2628.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2610.40
 +
| style="text-align: right;" | 2610.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-09-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2592.80
 +
| style="text-align: right;" | 2592.90
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2019-09-28
 +
| 2019-09-30
 +
| style="text-align: right;" | 2,238
 +
| style="text-align: right;" | 7,999
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
|}-->
+
!scope="col" | Additive Percentage by Mass
 
+
!scope="col" | Job Percentage by Mass
<!--== Water Sources ==
+
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="10"| 1
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 92.7976
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 20/40 Mesh
 +
| rowspan="1"| Element
 +
| rowspan="1"|
 +
| Crystalline Silica (Quartz)
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 7.1106
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 30/50 Mesh
 +
| rowspan="1"| Element
 +
| rowspan="1"|
 +
| Crystalline Silica (Quartz)
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.371
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ELECC-1
 +
| rowspan="2"| Element
 +
| rowspan="2"| Clay Control
 +
| 2-Hydroxy-N.N.N-trimethylethanaminium chloride
 +
| 67-48-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0762
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Non hazardous ingredients (WHMIS criteria)
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0762
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ELEHV-3
 +
| rowspan="2"| Element
 +
| rowspan="2"| Friction Reducer
 +
| Hydrotreated light paraffinic distillate
 +
| 64742-55-8
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0529
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Non-hazardous ingredients (WHMIS criteria)
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0529
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| ELEFE-3
 +
| rowspan="3"| Element
 +
| rowspan="3"| Surfactant
 +
| Isopropyl alcohol
 +
| 67-63-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0626
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0626
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Non-hazardous ingredients (WHMIS criteria)
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0626
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Use Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-05-05
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-10 }}</ref>
 +
== Water Sources ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Water Diversion Start Date
 
!scope="col" | Water Diversion Start Date
Line 92: Line 788:
 
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 
|-
 
|-
|}-->
+
| 2019-09-29
   
+
| 2019-09-30
<!--== Production Data ==
+
| Surface Water - River
 +
| style="text-align: right;" | 6006
 +
|-
 +
| 2019-09-29
 +
| 2019-09-29
 +
| Oilfield Produced Water
 +
| style="text-align: right;" | 54
 +
|-
 +
| 2019-09-29
 +
| 2019-09-29
 +
| Oilfield Produced Water
 +
| style="text-align: right;" | 87
 +
|-
 +
| 2019-09-29
 +
| 2019-09-29
 +
| Oilfield Produced Water
 +
| style="text-align: right;" | 30
 +
|-
 +
| 2019-09-28
 +
| 2019-09-28
 +
| Oilfield Produced Water
 +
| style="text-align: right;" | 2675
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Source Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-12-31
 +
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-10}}</ref>
 +
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
Line 102: Line 828:
 
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
|}-->
+
| 2019
 
+
| style="text-align: right;" | 2101
<!--== Occurences ==
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2057
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 111: Line 854:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2019-08-04
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2019-10-07
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]
 +
[[Category:FracFocus]]

Revision as of 11:04, 10 July 2020

Well Details

Well ID: 0395083316020
Loading map...
Location: 02/16-33-039-08W5/0
Location Alias: 02/16-33-39-08 W5M
Location Alias 2: 02/16-33-039-08 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 33
County/Municipality: Clearwater County
Well Name: YANGARRA HZ 102 FERRIER 16-33-39-8
Operator Name: Yangarra Resources Corp.
License Number: 0490597
License Date: 2018-08-24
License Status: Amended
Spud Date: 2019-07-24
Final Drill Date: 2019-08-02
Well Total Depth: 4036.00 m
Surface Hole Latitude: 52.388193
Surface Hole Longitude: -115.088883

For data sources see[1][2]

Well History

Date Event
2018-08-24 Obtained License
2019-07-24 Drill To LD
2019-07-25 Surface Casing Operation Performed
2019-07-29 Direction Drilling Operation Performed - Deviate
2019-07-31 Direction Drilling Operation Performed - Horizontal
2019-08-02 Finished Drilling
2019-08-02 Well Log Performed
2019-08-02 Well Mode changed to Drilled and Cased
2019-08-04 Production Casing Operation Performed
2019-08-04 Rig Released
2019-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-01 Well Began Production
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-07-24 Stampede Drilling A Division Of Matrix Energy Technologi 5 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-07-29 1770.00 Deviate (5 - 79 degrees)
2019-07-31 2545.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-28 Multi-Stage Fracture 3995.90 3996.00 0
2019-09-29 Multi-Stage Fracture 3972.80 3972.90 0
2019-09-29 Multi-Stage Fracture 3955.10 3955.20 0
2019-09-29 Multi-Stage Fracture 3937.60 3937.70 0
2019-09-29 Multi-Stage Fracture 3920.20 3920.30 0
2019-09-29 Multi-Stage Fracture 3902.80 3902.90 0
2019-09-29 Multi-Stage Fracture 3885.20 3885.30 0
2019-09-29 Multi-Stage Fracture 3867.90 3868.00 0
2019-09-29 Multi-Stage Fracture 3850.50 3850.60 0
2019-09-29 Multi-Stage Fracture 3833.20 3833.30 0
2019-09-29 Multi-Stage Fracture 3815.80 3815.90 0
2019-09-29 Multi-Stage Fracture 3798.20 3798.30 0
2019-09-29 Multi-Stage Fracture 3780.90 3781.00 0
2019-09-29 Multi-Stage Fracture 3763.60 3763.70 0
2019-09-29 Multi-Stage Fracture 3745.90 3746.00 0
2019-09-29 Multi-Stage Fracture 3728.30 3728.40 0
2019-09-29 Multi-Stage Fracture 3710.70 3710.80 0
2019-09-29 Multi-Stage Fracture 3693.30 3693.40 0
2019-09-29 Multi-Stage Fracture 3675.80 3675.90 0
2019-09-29 Multi-Stage Fracture 3658.40 3658.50 0
2019-09-29 Multi-Stage Fracture 3641.00 3641.10 0
2019-09-29 Multi-Stage Fracture 3623.60 3623.70 0
2019-09-29 Multi-Stage Fracture 3606.30 3606.40 0
2019-09-29 Multi-Stage Fracture 3589.00 3589.10 0
2019-09-29 Multi-Stage Fracture 3571.50 3571.60 0
2019-09-29 Multi-Stage Fracture 3554.10 3554.20 0
2019-09-29 Multi-Stage Fracture 3537.00 3537.10 0
2019-09-29 Multi-Stage Fracture 3519.60 3519.70 0
2019-09-29 Multi-Stage Fracture 3502.30 3502.40 0
2019-09-29 Multi-Stage Fracture 3484.70 3484.80 0
2019-09-29 Multi-Stage Fracture 3467.30 3467.40 0
2019-09-29 Multi-Stage Fracture 3450.00 3450.10 0
2019-09-29 Multi-Stage Fracture 3432.50 3432.60 0
2019-09-29 Multi-Stage Fracture 3415.30 3415.40 0
2019-09-29 Multi-Stage Fracture 3397.70 3397.80 0
2019-09-29 Multi-Stage Fracture 3380.40 3380.50 0
2019-09-29 Multi-Stage Fracture 3362.70 3362.80 0
2019-09-29 Multi-Stage Fracture 3345.40 3345.50 0
2019-09-29 Multi-Stage Fracture 3327.90 3328.00 0
2019-09-29 Multi-Stage Fracture 3310.40 3310.50 0
2019-09-29 Multi-Stage Fracture 3292.80 3292.90 0
2019-09-30 Multi-Stage Fracture 3275.20 3275.30 0
2019-09-30 Multi-Stage Fracture 3257.80 3257.90 0
2019-09-30 Multi-Stage Fracture 3240.30 3240.40 0
2019-09-30 Multi-Stage Fracture 3223.00 3223.10 0
2019-09-30 Multi-Stage Fracture 3205.60 3205.70 0
2019-09-30 Multi-Stage Fracture 3188.10 3188.20 0
2019-09-30 Multi-Stage Fracture 3170.50 3170.60 0
2019-09-30 Multi-Stage Fracture 3153.10 3153.20 0
2019-09-30 Multi-Stage Fracture 3135.60 3135.70 0
2019-09-30 Multi-Stage Fracture 3117.90 3118.00 0
2019-09-30 Multi-Stage Fracture 3100.40 3100.50 0
2019-09-30 Multi-Stage Fracture 3082.60 3082.70 0
2019-09-30 Multi-Stage Fracture 3065.30 3065.40 0
2019-09-30 Multi-Stage Fracture 3047.60 3047.70 0
2019-09-30 Multi-Stage Fracture 3029.80 3029.90 0
2019-09-30 Multi-Stage Fracture 3012.30 3012.40 0
2019-09-30 Multi-Stage Fracture 2994.70 2994.80 0
2019-09-30 Multi-Stage Fracture 2977.20 2977.30 0
2019-09-30 Multi-Stage Fracture 2959.90 2960.00 0
2019-09-30 Multi-Stage Fracture 2942.40 2942.50 0
2019-09-30 Multi-Stage Fracture 2925.10 2925.20 0
2019-09-30 Multi-Stage Fracture 2907.50 2907.60 0
2019-09-30 Multi-Stage Fracture 2890.00 2890.10 0
2019-09-30 Multi-Stage Fracture 2872.60 2872.70 0
2019-09-30 Multi-Stage Fracture 2854.90 2855.00 0
2019-09-30 Multi-Stage Fracture 2837.60 2837.70 0
2019-09-30 Multi-Stage Fracture 2820.10 2820.20 0
2019-09-30 Multi-Stage Fracture 2803.10 2803.20 0
2019-09-30 Multi-Stage Fracture 2785.30 2785.40 0
2019-09-30 Multi-Stage Fracture 2768.10 2768.20 0
2019-09-30 Multi-Stage Fracture 2750.70 2750.80 0
2019-09-30 Multi-Stage Fracture 2733.20 2733.30 0
2019-09-30 Multi-Stage Fracture 2715.70 2715.80 0
2019-09-30 Multi-Stage Fracture 2698.30 2698.40 0
2019-09-30 Multi-Stage Fracture 2680.70 2680.80 0
2019-09-30 Multi-Stage Fracture 2663.20 2663.30 0
2019-09-30 Multi-Stage Fracture 2645.40 2645.50 0
2019-09-30 Multi-Stage Fracture 2627.90 2628.00 0
2019-09-30 Multi-Stage Fracture 2610.40 2610.50 0
2019-09-30 Multi-Stage Fracture 2592.80 2592.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-28 2019-09-30 2,238 7,999 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 92.7976 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 7.1106 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.371 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0762 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0762 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0529 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0529 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0626 N/A
Methanol 67-56-1 100 0.0626 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0626 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-29 2019-09-30 Surface Water - River 6006
2019-09-29 2019-09-29 Oilfield Produced Water 54
2019-09-29 2019-09-29 Oilfield Produced Water 87
2019-09-29 2019-09-29 Oilfield Produced Water 30
2019-09-28 2019-09-28 Oilfield Produced Water 2675

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2101 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-04 No Incident Encountered 0.00 0.00
2019-10-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References