If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395083316020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.388193,"lon":-115.088883,"icon":""}]} |
Location: 02/16-33-039-08W5/0 | |
Location Alias: 02/16-33-39-08 W5M | |
Location Alias 2: 02/16-33-039-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 102 FERRIER 16-33-39-8 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0490597 | |
License Date: 2018-08-24 | |
License Status: Amended | |
Spud Date: 2019-07-24 | |
Final Drill Date: 2019-08-02 | |
Well Total Depth: 4036.00 m | |
Surface Hole Latitude: 52.388193 | |
Surface Hole Longitude: -115.088883 |
Date | Event |
---|---|
2018-08-24 | Obtained License |
2019-07-24 | Drill To LD |
2019-07-25 | Surface Casing Operation Performed |
2019-07-29 | Direction Drilling Operation Performed - Deviate |
2019-07-31 | Direction Drilling Operation Performed - Horizontal |
2019-08-02 | Finished Drilling |
2019-08-02 | Well Log Performed |
2019-08-02 | Well Mode changed to Drilled and Cased |
2019-08-04 | Production Casing Operation Performed |
2019-08-04 | Rig Released |
2019-09-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-01 | Well Began Production |
2019-10-01 | Well Fluid changed to Crude Oil |
2019-10-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-07-24 | Stampede Drilling A Division Of Matrix Energy Technologi | 5 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-07-29 | 1770.00 | Deviate (5 - 79 degrees) |
2019-07-31 | 2545.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-09-28 | Multi-Stage Fracture | 3995.90 | 3996.00 | 0 |
2019-09-29 | Multi-Stage Fracture | 3833.20 | 3833.30 | 0 |
2019-09-29 | Multi-Stage Fracture | 3815.80 | 3815.90 | 0 |
2019-09-29 | Multi-Stage Fracture | 3798.20 | 3798.30 | 0 |
2019-09-29 | Multi-Stage Fracture | 3780.90 | 3781.00 | 0 |
2019-09-29 | Multi-Stage Fracture | 3763.60 | 3763.70 | 0 |
2019-09-29 | Multi-Stage Fracture | 3745.90 | 3746.00 | 0 |
2019-09-29 | Multi-Stage Fracture | 3728.30 | 3728.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3710.70 | 3710.80 | 0 |
2019-09-29 | Multi-Stage Fracture | 3693.30 | 3693.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3675.80 | 3675.90 | 0 |
2019-09-29 | Multi-Stage Fracture | 3972.80 | 3972.90 | 0 |
2019-09-29 | Multi-Stage Fracture | 3658.40 | 3658.50 | 0 |
2019-09-29 | Multi-Stage Fracture | 3641.00 | 3641.10 | 0 |
2019-09-29 | Multi-Stage Fracture | 3623.60 | 3623.70 | 0 |
2019-09-29 | Multi-Stage Fracture | 3606.30 | 3606.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3589.00 | 3589.10 | 0 |
2019-09-29 | Multi-Stage Fracture | 3571.50 | 3571.60 | 0 |
2019-09-29 | Multi-Stage Fracture | 3554.10 | 3554.20 | 0 |
2019-09-29 | Multi-Stage Fracture | 3537.00 | 3537.10 | 0 |
2019-09-29 | Multi-Stage Fracture | 3519.60 | 3519.70 | 0 |
2019-09-29 | Multi-Stage Fracture | 3502.30 | 3502.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3955.10 | 3955.20 | 0 |
2019-09-29 | Multi-Stage Fracture | 3484.70 | 3484.80 | 0 |
2019-09-29 | Multi-Stage Fracture | 3467.30 | 3467.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3450.00 | 3450.10 | 0 |
2019-09-29 | Multi-Stage Fracture | 3432.50 | 3432.60 | 0 |
2019-09-29 | Multi-Stage Fracture | 3415.30 | 3415.40 | 0 |
2019-09-29 | Multi-Stage Fracture | 3397.70 | 3397.80 | 0 |
2019-09-29 | Multi-Stage Fracture | 3380.40 | 3380.50 | 0 |
2019-09-29 | Multi-Stage Fracture | 3362.70 | 3362.80 | 0 |
2019-09-29 | Multi-Stage Fracture | 3345.40 | 3345.50 | 0 |
2019-09-29 | Multi-Stage Fracture | 3327.90 | 3328.00 | 0 |
2019-09-29 | Multi-Stage Fracture | 3937.60 | 3937.70 | 0 |
2019-09-29 | Multi-Stage Fracture | 3310.40 | 3310.50 | 0 |
2019-09-29 | Multi-Stage Fracture | 3292.80 | 3292.90 | 0 |
2019-09-30 | Multi-Stage Fracture | 3275.20 | 3275.30 | 0 |
2019-09-30 | Multi-Stage Fracture | 3257.80 | 3257.90 | 0 |
2019-09-30 | Multi-Stage Fracture | 3240.30 | 3240.40 | 0 |
2019-09-30 | Multi-Stage Fracture | 3223.00 | 3223.10 | 0 |
2019-09-30 | Multi-Stage Fracture | 3205.60 | 3205.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 3188.10 | 3188.20 | 0 |
2019-09-30 | Multi-Stage Fracture | 3170.50 | 3170.60 | 0 |
2019-09-30 | Multi-Stage Fracture | 3153.10 | 3153.20 | 0 |
2019-09-29 | Multi-Stage Fracture | 3920.20 | 3920.30 | 0 |
2019-09-30 | Multi-Stage Fracture | 3135.60 | 3135.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 3117.90 | 3118.00 | 0 |
2019-09-30 | Multi-Stage Fracture | 3100.40 | 3100.50 | 0 |
2019-09-30 | Multi-Stage Fracture | 3082.60 | 3082.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 3065.30 | 3065.40 | 0 |
2019-09-30 | Multi-Stage Fracture | 3047.60 | 3047.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 3029.80 | 3029.90 | 0 |
2019-09-30 | Multi-Stage Fracture | 3012.30 | 3012.40 | 0 |
2019-09-30 | Multi-Stage Fracture | 2994.70 | 2994.80 | 0 |
2019-09-30 | Multi-Stage Fracture | 2977.20 | 2977.30 | 0 |
2019-09-29 | Multi-Stage Fracture | 3902.80 | 3902.90 | 0 |
2019-09-30 | Multi-Stage Fracture | 2959.90 | 2960.00 | 0 |
2019-09-30 | Multi-Stage Fracture | 2942.40 | 2942.50 | 0 |
2019-09-30 | Multi-Stage Fracture | 2925.10 | 2925.20 | 0 |
2019-09-30 | Multi-Stage Fracture | 2907.50 | 2907.60 | 0 |
2019-09-30 | Multi-Stage Fracture | 2890.00 | 2890.10 | 0 |
2019-09-30 | Multi-Stage Fracture | 2872.60 | 2872.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 2854.90 | 2855.00 | 0 |
2019-09-30 | Multi-Stage Fracture | 2837.60 | 2837.70 | 0 |
2019-09-30 | Multi-Stage Fracture | 2820.10 | 2820.20 | 0 |
2019-09-30 | Multi-Stage Fracture | 2803.10 | 2803.20 | 0 |
2019-09-29 | Multi-Stage Fracture | 3885.20 | 3885.30 | 0 |
2019-09-30 | Multi-Stage Fracture | 2785.30 | 2785.40 | 0 |
2019-09-30 | Multi-Stage Fracture | 2768.10 | 2768.20 | 0 |
2019-09-30 | Multi-Stage Fracture | 2750.70 | 2750.80 | 0 |
2019-09-30 | Multi-Stage Fracture | 2733.20 | 2733.30 | 0 |
2019-09-30 | Multi-Stage Fracture | 2715.70 | 2715.80 | 0 |
2019-09-30 | Multi-Stage Fracture | 2698.30 | 2698.40 | 0 |
2019-09-30 | Multi-Stage Fracture | 2680.70 | 2680.80 | 0 |
2019-09-30 | Multi-Stage Fracture | 2663.20 | 2663.30 | 0 |
2019-09-30 | Multi-Stage Fracture | 2645.40 | 2645.50 | 0 |
2019-09-30 | Multi-Stage Fracture | 2627.90 | 2628.00 | 0 |
2019-09-29 | Multi-Stage Fracture | 3867.90 | 3868.00 | 0 |
2019-09-30 | Multi-Stage Fracture | 2610.40 | 2610.50 | 0 |
2019-09-30 | Multi-Stage Fracture | 2592.80 | 2592.90 | 0 |
2019-09-29 | Multi-Stage Fracture | 3850.50 | 3850.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-09-28 | 2019-09-30 | 2,238 | 7,999 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 92.7976 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 7.1106 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.371 | N/A | ||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0762 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0762 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0529 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0529 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0626 | N/A | |
Methanol | 67-56-1 | 100 | 0.0626 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0626 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-29 | 2019-09-30 | Surface Water - River | 6006 |
2019-09-29 | 2019-09-29 | Oilfield Produced Water | 54 |
2019-09-29 | 2019-09-29 | Oilfield Produced Water | 87 |
2019-09-29 | 2019-09-29 | Oilfield Produced Water | 30 |
2019-09-28 | 2019-09-28 | Oilfield Produced Water | 2675 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2101 | 0.0 | 0.0 | 0.0 |
2020 | 2057 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-08-04 | No Incident Encountered | 0.00 | 0.00 |
2019-10-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]