Well Details

Well ID: 37-005-30437
Loading map...
Operator Name: SNYDER BROS INC
First Permit Date: 2009-08-21
Last Permit Date: 2009-08-21
Spud Date: 2010-02-15
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.80359
Longitude: -79.350087

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4761.0 360.0 0.0 0.0 0.0 0.0
2012-0 4017.0 314.0 0.0 0.0 0.0 0.0
2011-0 6238.0 329.0 0.0 0.0 0.0 0.0
2010-0 5742.0 207.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1821247 2009-08-18 No Violations Noted Site constructed, drilling had not commenced at the time of the inspection. Erosion control measures were implemented as outlined in the E&S plan located onsite. The controls implemented should effectively minimize accelerated erosion & sedimentation, provided they are maintained properly.
1863467 2010-02-17 No Violations Noted Site constructed, drilling had not commenced at the time of the inspection.
1865030 2010-02-23 No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite at the time of the inspection. Pit had more than the two feet of lined freeboard. Observed no accelerated erosion & sedimentation on the site or access road at the time of the inspection. The operator should evlauate the access road and site erosion controls as the weather improves to insure they continue to function properly. During moving the rig off-site and any susbequent heavy truck traffic the operator should inspect the access road and place additional rock as neccesary. The operator should also have a plow/broom truck available to address any mud which might be transported onto Route 85.