Well ID: 37-005-30437 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.80359,"lon":-79.350087,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Cowanshannock Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: | |
Farm/Lease Name: J LUNDGREN ETAL 6-73 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-21 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.803590 | |
Longitude: -79.350087 |
Date | Event |
---|---|
2009-08-21 | New Permit Application |
2010-02-15 | Performed Spud Operation |
2010-02-25 | Drilling Completion |
2010-03-16 | Perforation |
2011-07-25 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 5,742.00 | 207 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 6,238.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 4,017.00 | 314 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 4,761.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 3,517.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 3,078.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 2,664.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,985.00 | 276 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 2,848.00 | 317 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 3,414.00 | 349 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SNYDER BROS INC | Produced Fluid | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1821247 | Primary Facility | 2009-08-18 | Complaint Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Erosion control measures were implemented as outlined in the E&S plan located onsite. The controls implemented should effectively minimize accelerated erosion & sedimentation, provided they are maintained properly. |
1863467 | Primary Facility | 2010-02-17 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. |
1865030 | Primary Facility | 2010-02-23 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite at the time of the inspection. Pit had more than the two feet of lined freeboard. Observed no accelerated erosion & sedimentation on the site or access road at the time of the inspection. The operator should evlauate the access road and site erosion controls as the weather improves to insure they continue to function properly. During moving the rig off-site and any susbequent heavy truck traffic the operator should inspect the access road and place additional rock as neccesary. The operator should also have a plow/broom truck available to address any mud which might be transported onto Route 85. |
For data sources see[7]