Well Details

Well ID: 37-005-30671
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2010-06-21
Last Permit Date: 2010-06-21
Spud Date: 2010-10-06
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.622905
Longitude: -79.361166

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1778.0 365.0 0.0 0.0 0.0 0.0
2012-0 2436.0 366.0 0.0 0.0 0.0 0.0
2011-0 3637.0 334.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2010-0 DRILLING FLUID WASTE 480.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 FRACING FLUID WASTE 1520.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-0 PRODUCED FLUID 55.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 PRODUCED FLUID 65.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1918565 2010-10-07 No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Site erosion controls had been implemented as outlined in the E&S plan. Noted in the E&S plan there were inadequate erosion controls. Specifically the plan did not utilize an effective method to deal with runoff on the access road and the short length of road and proximity to the paved road necessitated the rocking of the entire access road. Contacted operator representative Robert Carnahan regarding this matter. Mr. Carnahan called WQS Higgins back and stated that the road will be regraded to inslope to the cut side, a collection ditch rocked with rip-rap for stability will be implemented in the next few days. These actions should sufficiently address the access road concerns noted by WQS Higgins.
1920402 2010-10-08 No Violations Noted drilling - awaiting cement/E&S ok/ID&pit ok
1947311 2011-02-03 No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded. Observed no erosion or sedimentation issues in relation to the access road or well-site. The operator should insure that the vegetative cover take hold and achieves the 70% uniform coverage criteria. In addition the operator should have the well tagged with the appropriate permit number as soon as possible.
1961081 2011-03-25 No Violations Noted Drilling complete. Well equipped for production. Site reclaimation underway. No open pits.
2125187 2012-12-21 No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.