If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 228: | Line 228: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
| + | [[Category:Wells]] | ||
| Well ID: 37-005-30663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.871075,"lon":-79.504658,"icon":""}]} |
| County: Armstrong | |
| Municipality: East Franklin Township | |
| Operator Name: SNYDER BROS INC | |
| Well Pad ID: 146481 | |
| Farm/Lease Name: ROBERT J HEPFL ETUX 1-55 | |
| First Permit Date: 2010-06-16 | |
| Last Permit Date: 2010-10-27 | |
| Spud Date: 2011-01-07 | |
| Unconventional: Yes | |
| Horizontal: No | |
| Producing: Yes | |
| Violations: None | |
| Latitude: 40.871075 | |
| Longitude: -79.504658 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1941058 | 2011-01-05 | No Violations Noted | Rig not yet on location at time of inspection.
Drilling pit lined. No E/S control issues on site. |
|
| 1941631 | 2011-01-07 | No Violations Noted | Waiting on cement at time of inspection. Information per drillers log and cement tickets: 62' of 13 3/8" conductor set in 17 1/2" hole and sanded in. 168' of 9 5/8" casing set in 202' 12 1/4" hole and cemented with 80 sacks of "A" containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 11:38 01-07-11. Per First Class Energy rep, cement basket run on second joint from surface at approximately 84'. Cement fell approximately 9' after truck left location.
Drilling pit lined and freeboard maintained. No E/S control issues on site. |
|
| 1943108 | 2011-01-11 | No Violations Noted | Drilling 6 1/4" hole at 1900' of proposed 6852' TD at time of inspection. Information per drillers log and cement tickets: 926' of 20 lb/ft 7" casing set in 990' of 8 7/8" hole and cemented with 200 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 14:24 01-10-11. On 01-11-11 tested BOP at 350 psi for 15 min.
Drilling pit lined and freeboard maintained. E/S controls in place and functioning as per available plan. |
|
| 1949845 | 2011-01-27 | No Violations Noted | Well is drilled. Site ID sign and E&S plan located. Pit is on-site / appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road. | |
| 2046893 | 2012-03-01 | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, and the fill and cut slopes had vegetation which met the 70% uniform coverage criteria. There were several small erosion ditches observed on the fill slope side of the well pad. The Department is requesting that the to address this issue the operator scarify the unvegetated portion and seed & mulch the remainder of the well pad to alleviate the runoff causing the minor erosion. | |
| 2082438 | 2012-07-11 | No Violations Noted | At the time of inspection the well was and equipped for production. The site is restored meeting the 70% uniform vegetative coverage criteria. No accelerated erosion or sedimentation in relation to the access road or well pad area at the time of inspection. |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2012-2 | 17828.0 | 179.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-1 | 22849.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-2 | 26495.0 | 118.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-1 | 18519.0 | 51.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|---|---|---|---|---|---|---|---|
| 2011-1 | PRODUCED FLUID | 220.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2011-1 | PRODUCED FLUID | 220.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
| 2011-2 | PRODUCED FLUID | 90.0 | Bbl | INJECTION DISPOSAL WELL | 34-049-23127 | NORTH STAR | YOUNGSTOWN | OH |
| 2011-2 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2011-2 | PRODUCED FLUID | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |