If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.871075,"lon":-79.504658,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 146481 | |
Farm/Lease Name: ROBERT J HEPFL ETUX 1-55 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-06-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.871075 | |
Longitude: -79.504658 |
Date | Event |
---|---|
2010-06-16 | New Permit Application |
2010-10-27 | New Permit Application |
2011-01-07 | Performed Spud Operation |
2011-01-13 | Drilling Completion |
2011-03-29 | Perforation |
2013-05-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SNYDER BROS INC | 45,014.00 | 169 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 40,677.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 31,158.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 23,338.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 20,158.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 16,621.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 14,416.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 12,197.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 11,615.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | SNYDER BROS INC | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-049-23127 |
2011 | SNYDER BROS INC | Produced Fluid | 320.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1941058 | Primary Facility | 2011-01-05 | Drilling/Alteration | No Violations Noted | Rig not yet on location at time of inspection. |
1941631 | Primary Facility | 2011-01-07 | Drilling/Alteration | No Violations Noted | Waiting on cement at time of inspection. Information per drillers log and cement tickets: 62' of 13 3/8" conductor set in 17 1/2" hole and sanded in. 168' of 9 5/8" casing set in 202' 12 1/4" hole and cemented with 80 sacks of "A" containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 11:38 01-07-11. Per First Class Energy rep, cement basket run on second joint from surface at approximately 84'. Cement fell approximately 9' after truck left location. |
1943108 | Primary Facility | 2011-01-11 | Drilling/Alteration | No Violations Noted | Drilling 6 1/4" hole at 1900' of proposed 6852' TD at time of inspection. Information per drillers log and cement tickets: 926' of 20 lb/ft 7" casing set in 990' of 8 7/8" hole and cemented with 200 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 14:24 01-10-11. On 01-11-11 tested BOP at 350 psi for 15 min. |
1949845 | Primary Facility | 2011-01-27 | Routine/Complete Inspection | No Violations Noted | Well is drilled. Site ID sign and E&S plan located. Pit is on-site / appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road. |
2046893 | Primary Facility | 2012-03-01 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, and the fill and cut slopes had vegetation which met the 70% uniform coverage criteria. There were several small erosion ditches observed on the fill slope side of the well pad. The Department is requesting that the to address this issue the operator scarify the unvegetated portion and seed & mulch the remainder of the well pad to alleviate the runoff causing the minor erosion. |
2082438 | Primary Facility | 2012-07-11 | Site Restoration | No Violations Noted | At the time of inspection the well was and equipped for production. The site is restored meeting the 70% uniform vegetative coverage criteria. No accelerated erosion or sedimentation in relation to the access road or well pad area at the time of inspection. |
2165376 | Primary Facility | 2013-05-10 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2381583 | Primary Facility | 2015-06-23 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road Due to recent precipitation events the operator should consider actions to address access road erosion control maintenance and repair. |
2571272 | Primary Facility | 2017-03-14 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[7]