If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-021-21156 | | Well ID: 37-021-21156 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.408886, -78.952666 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Cambria County, Pennsylvania|Cambria]] | ||
+ | |- | ||
+ | | Municipality: [[Jackson Township, Cambria County, Pennsylvania|Jackson Township]] | ||
|- | |- | ||
| Operator Name: [[PEOPLES NATURAL GAS CO LLC]] | | Operator Name: [[PEOPLES NATURAL GAS CO LLC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: READE 6 | ||
|- | |- | ||
| First Permit Date: 2010-07-15 | | First Permit Date: 2010-07-15 | ||
Line 11: | Line 19: | ||
| Last Permit Date: 2010-07-15 | | Last Permit Date: 2010-07-15 | ||
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Unconventional: No | | Unconventional: No | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: |
+ | |- | ||
+ | | Violations: 0 | ||
|- | |- | ||
| Latitude: 40.408886 | | Latitude: 40.408886 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 46: | Line 62: | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 53: | Line 75: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1911226 | | 1911226 | ||
Line 60: | Line 84: | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 67: | Line 93: | ||
| No Violations Noted | | No Violations Noted | ||
| A pre drilling meeting was held at the Rager Mtn Storage field office. DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present. Review of the Drilling procedure along with the future plans of the site. At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed along with wooden barrier. DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade. Area of disturbance is 3 acres. PPC plan is also present at the site. DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing. It appears that the well is >1000 ft from any potable wells. | | A pre drilling meeting was held at the Rager Mtn Storage field office. DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present. Review of the Drilling procedure along with the future plans of the site. At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed along with wooden barrier. DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade. Area of disturbance is 3 acres. PPC plan is also present at the site. DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing. It appears that the well is >1000 ft from any potable wells. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-021-21156 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.408886,"lon":-78.952666,"icon":""}]} |
County: Cambria | |
Municipality: Jackson Township | |
Operator Name: PEOPLES NATURAL GAS CO LLC | |
Well Pad ID: | |
Farm/Lease Name: READE 6 | |
First Permit Date: 2010-07-15 | |
Last Permit Date: 2010-07-15 | |
Spud Date: | |
Unconventional: No | |
Horizontal: No | |
Well Status: | |
Violations: 0 | |
Latitude: 40.408886 | |
Longitude: -78.952666 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1911226 | 2010-09-02 | No Violations Noted | At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed. Access road was in the process of completion. Site design showed series of drainage culverts along access road. Spud meeting schedule for the week of 9/13/10. PNG supplied DEP with a drilling plan for the proposed storage well.
|
|||
1912793 | 2010-09-14 | No Violations Noted | A pre drilling meeting was held at the Rager Mtn Storage field office. DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present. Review of the Drilling procedure along with the future plans of the site. At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed along with wooden barrier. DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade. Area of disturbance is 3 acres. PPC plan is also present at the site. DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing. It appears that the well is >1000 ft from any potable wells. |
For data sources see[3]