If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-21156 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.408886,"lon":-78.952667,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Jackson Township | |
Operator Name: PEOPLES NATURAL GAS CO LLC | |
Well Pad ID: | |
Farm/Lease Name: READE 6 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-15 | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.408886 | |
Longitude: -78.952667 |
Date | Event |
---|---|
2010-07-15 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1911226 | Primary Facility | 2010-09-02 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed. Access road was in the process of completion. Site design showed series of drainage culverts along access road. Spud meeting schedule for the week of 9/13/10. PNG supplied DEP with a drilling plan for the proposed storage well. |
1912793 | Primary Facility | 2010-09-14 | Drilling/Alteration | No Violations Noted | A pre drilling meeting was held at the Rager Mtn Storage field office. DEP representative, Paul Wyrwas, Rick Hoover, and Ed Renwick along with PNG representatives (Paul Sekinger, Nicholas Barone and others), Union Drilling and remaining subcontractors were present. Review of the Drilling procedure along with the future plans of the site. At the time of inspection, no E&S and IW issues. Site pad was in the process of completion. Filter fence was installed along with wooden barrier. DEP requested that an additional filter fencing or sock absorbent should be installed on the down gradient side of wooden barrier due high quality stream area and steepness of grade. Area of disturbance is 3 acres. PPC plan is also present at the site. DEP requested type of liner to be used at the site and request for a bond log of cement upon completion of cementing. It appears that the well is >1000 ft from any potable wells. |
For data sources see[5]