X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31028"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31028
 
| Well ID: 37-005-31028
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.847164, -79.612275 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.847164, -79.612275 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 04/12/2012
+
| Spud Date: 2012-04-12
 
|-
 
|-
| Permit Date: 3/26/2012
+
| Permit Date: 2012-03-26
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2012-06-07
 +
| 2012-06-07
 +
| style="text-align: right;" | 6657.00
 +
| style="text-align: right;" | 157734.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="23"| 1
 +
| rowspan="1"| CLAY TREAT LT
 +
| rowspan="1"| Superior Well Services
 +
| rowspan="1"| Clay Control
 +
| Choline chloride
 +
| 67-48-1
 +
| style="text-align: right;" | 80.00
 +
| style="text-align: right;" | 0.00038740
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| ICP-1000
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Iron Control Additive
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00339000
 +
| style="text-align: right;" |
 +
|-
 +
| ANIONIC COPOLYMER
 +
|
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00339000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| ACID INHIBITOR 2
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Acid Corrosion Inhibitor
 +
| PROPRIETARY
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00005080
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021790
 +
| style="text-align: right;" |
 +
|-
 +
| Propargyl alcohol
 +
| 107-19-7
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021790
 +
| style="text-align: right;" |
 +
|-
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00021790
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Hydrochloric Acid
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Cement/Formation Breakdown
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.01
 +
| style="text-align: right;" |
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 92.50
 +
| style="text-align: right;" | 0.22
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="0"| SUPER TSC
 +
| rowspan="0"| Superior Well Services
 +
| rowspan="0"| Paraffin & Scale Additive
 +
|- valign="top"
 +
| rowspan="4"| SUPER TSC
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Scale Control
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00169500
 +
| style="text-align: right;" |
 +
|-
 +
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
 +
| 37971-36-1
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00033900
 +
| style="text-align: right;" |
 +
|-
 +
| ANIONIC POLYMER
 +
|
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00033900
 +
| style="text-align: right;" |
 +
|-
 +
| ANIONIC COPOLYMER
 +
|
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00033900
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Super 100NE
 +
| rowspan="2"| Superior Well Services
 +
| rowspan="2"| Surfactant/Foamer
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 +
|-
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00706810
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| WFR-3B
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Friction Reducer
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 25.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
| Ethoxylated C12-16 alcohols
 +
| 68551-12-2
 +
| style="text-align: right;" | 4.00
 +
| style="text-align: right;" | 0.00329310
 +
| style="text-align: right;" |
 +
|-
 +
| Stoddard solvent
 +
| 8052-41-3
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00823280
 +
| style="text-align: right;" |
 +
|-
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| KR-153SL
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Biocide
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00169500
 +
| style="text-align: right;" |
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.00067800
 +
| style="text-align: right;" |
 +
|-
 +
| Diethylene glycol
 +
| 111-46-6
 +
| style="text-align: right;" | 3.50
 +
| style="text-align: right;" | 0.00011860
 +
| style="text-align: right;" |
 +
|-
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00003390
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 142: Line 353:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 147: Line 359:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-1
+
| 2012
| Drill Cuttings (in Tons)
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 109.00 Tons
 
| ON SITE ENCAPSULATION
 
|
 
|-
 
| 2012-1
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 270.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 525-1
 
|-
 
| 2012-1
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,050.00 Bbl
 
| style="text-align: right;" | 1,050.00 Bbl
Line 165: Line 366:
 
| WMGR123SW008
 
| WMGR123SW008
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 200.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW008
 
| WMGR123SW008
 
|-
 
|-
| 2012-1
+
| 2012
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 177: Line 380:
 
| 34-155-21447
 
| 34-155-21447
 
|-
 
|-
| 2012-2
+
| 2012
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 100.00 Bbl
+
| style="text-align: right;" | 160.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| WMGR123SW008
+
| 34-155-23795
 
|-
 
|-
| 2012-2
+
| 2012
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 189: Line 394:
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2012-2
+
| 2012
| Produced Fluid (in Barrels)
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 160.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 270.00 Bbl
| 34-155-23795
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 525-1
 
|-
 
|-
| 2013-1
+
| 2012
| Produced Fluid (in Barrels)
+
| [[SNYDER BROS INC]]
| style="text-align: right;" | 160.00 Bbl
+
| Drill Cuttings (in Tons)
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 109.00 Tons
| 34-155-21438
+
| ON SITE ENCAPSULATION
 +
|  
 
|-
 
|-
| 2013-2
+
| 2013
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
 
|-
 
|-
| 2014-1
+
| 2014
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 93.00 Bbl
 
| style="text-align: right;" | 93.00 Bbl
Line 213: Line 422:
 
| 34-155-23759
 
| 34-155-23759
 
|-
 
|-
| 2014-2
+
| 2014
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 95.00 Bbl
 
| style="text-align: right;" | 95.00 Bbl
Line 219: Line 429:
 
| 34-155-23732
 
| 34-155-23732
 
|-
 
|-
| 2015-2
+
| 2015
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 225: Line 436:
 
| 34-155-23223
 
| 34-155-23223
 
|-
 
|-
| 2016-2
+
| 2016
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 68.00 Bbl
 
| style="text-align: right;" | 68.00 Bbl
Line 231: Line 443:
 
| 34-155-23223
 
| 34-155-23223
 
|-
 
|-
| 2018-05
+
| 2018
 +
| [[SNYDER BROS INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
Line 256: Line 469:
 
| 2058544
 
| 2058544
 
| Primary Facility
 
| Primary Facility
| 04/09/2012
+
| 2012-04-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 263: Line 476:
 
| 2067682
 
| 2067682
 
| Primary Facility
 
| Primary Facility
| 05/14/2012
+
| 2012-05-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 270: Line 483:
 
| 2082487
 
| 2082487
 
| Primary Facility
 
| Primary Facility
| 07/11/2012
+
| 2012-07-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 277: Line 490:
 
| 2104455
 
| 2104455
 
| Primary Facility
 
| Primary Facility
| 10/02/2012
+
| 2012-10-02
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 284: Line 497:
 
| 2110444
 
| 2110444
 
| Primary Facility
 
| Primary Facility
| 10/24/2012
+
| 2012-10-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 291: Line 504:
 
| 2115252
 
| 2115252
 
| Primary Facility
 
| Primary Facility
| 11/13/2012
+
| 2012-11-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 298: Line 511:
 
| 2170525
 
| 2170525
 
| Primary Facility
 
| Primary Facility
| 05/29/2013
+
| 2013-05-29
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 347: Line 560:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 06/07/2012
 
| 06/07/2012
 
| style="text-align: right;" | 6657.00
 
| style="text-align: right;" | 157734.0
 
| style="text-align: right;" |
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="23"| 1
 
| rowspan="1"| CLAY TREAT LT
 
| rowspan="1"| Superior Well Services
 
| rowspan="1"| Clay Control
 
| Choline chloride
 
| 67-48-1
 
| style="text-align: right;" | 80.00
 
| style="text-align: right;" | 0.00038740
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| ICP-1000
 
| rowspan="2"| Superior Well Services
 
| rowspan="2"| Iron Control Additive
 
| 1,2-Propylene glycol
 
| 57-55-6
 
| style="text-align: right;" | 50.00
 
| style="text-align: right;" | 0.00339000
 
| style="text-align: right;" |
 
|-
 
| ANIONIC COPOLYMER
 
|
 
| style="text-align: right;" | 50.00
 
| style="text-align: right;" | 0.00339000
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="4"| ACID INHIBITOR 2
 
| rowspan="4"| Superior Well Services
 
| rowspan="4"| Acid Corrosion Inhibitor
 
| PROPRIETARY
 
|
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00005080
 
| style="text-align: right;" |
 
|-
 
| 2-Butoxyethanol
 
| 111-76-2
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00021790
 
| style="text-align: right;" |
 
|-
 
| Propargyl alcohol
 
| 107-19-7
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00021790
 
| style="text-align: right;" |
 
|-
 
| Isopropanol
 
| 67-63-0
 
| style="text-align: right;" |
 
| style="text-align: right;" | 0.00021790
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| Hydrochloric Acid
 
| rowspan="2"| Superior Well Services
 
| rowspan="2"| Cement/Formation Breakdown
 
| Hydrochloric acid
 
| 7647-01-0
 
| style="text-align: right;" | 7.50
 
| style="text-align: right;" | 0.01
 
| style="text-align: right;" |
 
|-
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 92.50
 
| style="text-align: right;" | 0.22
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="0"| SUPER TSC
 
| rowspan="0"| Superior Well Services
 
| rowspan="0"| Paraffin & Scale Additive
 
|- valign="top"
 
| rowspan="4"| SUPER TSC
 
| rowspan="4"| Superior Well Services
 
| rowspan="4"| Scale Control
 
| 1,2-Propylene glycol
 
| 57-55-6
 
| style="text-align: right;" | 50.00
 
| style="text-align: right;" | 0.00169500
 
| style="text-align: right;" |
 
|-
 
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
 
| 37971-36-1
 
| style="text-align: right;" | 10.00
 
| style="text-align: right;" | 0.00033900
 
| style="text-align: right;" |
 
|-
 
| ANIONIC POLYMER
 
|
 
| style="text-align: right;" | 10.00
 
| style="text-align: right;" | 0.00033900
 
| style="text-align: right;" |
 
|-
 
| ANIONIC COPOLYMER
 
|
 
| style="text-align: right;" | 10.00
 
| style="text-align: right;" | 0.00033900
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="2"| Super 100NE
 
| rowspan="2"| Superior Well Services
 
| rowspan="2"| Surfactant/Foamer
 
| Isopropanol
 
| 67-63-0
 
| style="text-align: right;" | 30.00
 
| style="text-align: right;" | 0.03
 
| style="text-align: right;" |
 
|-
 
| 2-Butoxyethanol
 
| 111-76-2
 
| style="text-align: right;" | 7.00
 
| style="text-align: right;" | 0.00706810
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="4"| WFR-3B
 
| rowspan="4"| Superior Well Services
 
| rowspan="4"| Friction Reducer
 
| 1,2-Propylene glycol
 
| 57-55-6
 
| style="text-align: right;" | 25.00
 
| style="text-align: right;" | 0.02
 
| style="text-align: right;" |
 
|-
 
| Ethoxylated C12-16 alcohols
 
| 68551-12-2
 
| style="text-align: right;" | 4.00
 
| style="text-align: right;" | 0.00329310
 
| style="text-align: right;" |
 
|-
 
| Stoddard solvent
 
| 8052-41-3
 
| style="text-align: right;" | 10.00
 
| style="text-align: right;" | 0.00823280
 
| style="text-align: right;" |
 
|-
 
| Distillates, petroleum, hydrotreated light
 
| 64742-47-8
 
| style="text-align: right;" | 30.00
 
| style="text-align: right;" | 0.02
 
| style="text-align: right;" |
 
|-
 
|- valign="top"
 
| rowspan="4"| KR-153SL
 
| rowspan="4"| Superior Well Services
 
| rowspan="4"| Biocide
 
| Polyethylene glycol
 
| 25322-68-3
 
| style="text-align: right;" | 50.00
 
| style="text-align: right;" | 0.00169500
 
| style="text-align: right;" |
 
|-
 
| 2,2-Dibromo-3-nitrilopropionamide
 
| 10222-01-2
 
| style="text-align: right;" | 20.00
 
| style="text-align: right;" | 0.00067800
 
| style="text-align: right;" |
 
|-
 
| Diethylene glycol
 
| 111-46-6
 
| style="text-align: right;" | 3.50
 
| style="text-align: right;" | 0.00011860
 
| style="text-align: right;" |
 
|-
 
| Ethylene glycol
 
| 107-21-1
 
| style="text-align: right;" | 1.00
 
| style="text-align: right;" | 0.00003390
 
| style="text-align: right;" |
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 05:19, 20 August 2019

Well Details

Well ID: 37-005-31028
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 147436
Farm/Lease Name: MINTEER-CONAWAY UNIT 1M
License Status: Active
Spud Date: 2012-04-12
Permit Date: 2012-03-26
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.847164
Longitude: -79.612275

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-06-07 2012-06-07 6657.00 157734.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CLAY TREAT LT Superior Well Services Clay Control Choline chloride 67-48-1 80.00 0.00038740
ICP-1000 Superior Well Services Iron Control Additive 1,2-Propylene glycol 57-55-6 50.00 0.00339000
ANIONIC COPOLYMER 50.00 0.00339000
ACID INHIBITOR 2 Superior Well Services Acid Corrosion Inhibitor PROPRIETARY 0.00005080
2-Butoxyethanol 111-76-2 0.00021790
Propargyl alcohol 107-19-7 0.00021790
Isopropanol 67-63-0 0.00021790
Hydrochloric Acid Superior Well Services Cement/Formation Breakdown Hydrochloric acid 7647-01-0 7.50 0.01
Water 7732-18-5 92.50 0.22
SUPER TSC Superior Well Services Paraffin & Scale Additive
SUPER TSC Superior Well Services Scale Control 1,2-Propylene glycol 57-55-6 50.00 0.00169500
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00033900
ANIONIC POLYMER 10.00 0.00033900
ANIONIC COPOLYMER 10.00 0.00033900
Super 100NE Superior Well Services Surfactant/Foamer Isopropanol 67-63-0 30.00 0.03
2-Butoxyethanol 111-76-2 7.00 0.00706810
WFR-3B Superior Well Services Friction Reducer 1,2-Propylene glycol 57-55-6 25.00 0.02
Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00329310
Stoddard solvent 8052-41-3 10.00 0.00823280
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
KR-153SL Superior Well Services Biocide Polyethylene glycol 25322-68-3 50.00 0.00169500
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00067800
Diethylene glycol 111-46-6 3.50 0.00011860
Ethylene glycol 107-21-1 1.00 0.00003390

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 SNYDER BROS INC 52,805.00 147 0.00 0 0.00 0
2013 SNYDER BROS INC 57,885.00 362 0.00 0 0.00 0
2014 SNYDER BROS INC 38,821.00 365 0.00 0 0.00 0
2015 SNYDER BROS INC 29,615.00 356 0.00 0 0.00 0
2016 SNYDER BROS INC 22,714.00 358 0.00 0 0.00 0
2017 SNYDER BROS INC 20,123.00 360 0.00 0 0.00 0
2018 SNYDER BROS INC 16,685.00 357 0.00 0 0.00 0
2019 SNYDER BROS INC 3,831.00 87 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SNYDER BROS INC Fracing Fluid Waste (in Barrels) 1,050.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Produced Fluid (in Barrels) 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 SNYDER BROS INC Produced Fluid (in Barrels) 160.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Fracing Fluid Waste (in Barrels) 270.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 SNYDER BROS INC Drill Cuttings (in Tons) 109.00 Tons ON SITE ENCAPSULATION
2013 SNYDER BROS INC Produced Fluid (in Barrels) 240.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid (in Barrels) 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 SNYDER BROS INC Produced Fluid (in Barrels) 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2015 SNYDER BROS INC Produced Fluid (in Barrels) 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 68.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 50.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2058544 Primary Facility 2012-04-09 Routine/Complete Inspection No Violations Noted Inspection as a result of a SPUD noticed received on 4/9/2012. At the time of inspection site construction was underway. E&S controls were installed as outlined in the plan and no accelerated erosion was observed in relation to the well pad construction or the access road.
2067682 Primary Facility 2012-05-14 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not in production. The E&S plan was onsite and implemented as designed. No acceleration was observed in relation to the well pad or the access road. The Department notes that an open drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.
2082487 Primary Facility 2012-07-11 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The E&S plan was onsite and implemented as designed. No acceleration was observed in relation to the well pad or the access road. The Department notes that at the time of inspection the Operator was in the process of restoring the site. The Department suggests the Operator leave the BMP's installed until the site has been restored. The Department also suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure erosion and sedimentation is kept at a minimum.
2104455 Primary Facility 2012-10-02 Site Restoration No Violations Noted At the time of inspection the well appears to be drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The site appears to meet the 70% uniform vegetative coverage criteria for restoration. The site is restored.
2110444 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2115252 Primary Facility 2012-11-13 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located osnite and it appeared to be in sound condition. Site had been properly regraded, seeded, mulched, and temporary vegetative cover until the next crop planting season had been implemented.
2170525 Primary Facility 2013-05-29 Site Restoration No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2448056 Primary Facility 2016-02-09 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-equipment-2-100 bbl tanks look ok.
2486992 Primary Facility 2016-05-24 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that the well was located amidst agricultural fields.

For data sources see[7]

References