If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31028 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.847164,"lon":-79.612275,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: West Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147436 | |
Farm/Lease Name: MINTEER-CONAWAY UNIT 1M | |
License Status: | |
Spud Date: | |
Permit Date: 2012-03-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.847164 | |
Longitude: -79.612275 |
Date | Event |
---|---|
2012-03-26 | New Permit Application |
2012-04-12 | Performed Spud Operation |
2012-05-02 | Drilling Completion |
2012-06-05 | Perforation |
2012-10-26 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-06-07 | 2012-06-07 | 6,657 | 157,734 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CLAY TREAT LT | Superior Well Services | Clay Control | Choline chloride | 67-48-1 | 80.00 | 0.00038740 | |
ICP-1000 | Superior Well Services | Iron Control Additive | 1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00339000 | ||
ANIONIC COPOLYMER | 50.00 | 0.00339000 | ||||||
ACID INHIBITOR 2 | Superior Well Services | Acid Corrosion Inhibitor | PROPRIETARY | 0.00005080 | ||||
2-Butoxyethanol | 111-76-2 | 0.00021790 | ||||||
Propargyl alcohol | 107-19-7 | 0.00021790 | ||||||
Isopropanol | 67-63-0 | 0.00021790 | ||||||
Hydrochloric Acid | Superior Well Services | Cement/Formation Breakdown | Hydrochloric acid | 7647-01-0 | 7.50 | 0.01 | ||
Water | 7732-18-5 | 92.50 | 0.22 | |||||
SUPER TSC | Superior Well Services | Paraffin & Scale Additive | ||||||
SUPER TSC | Superior Well Services | Scale Control | 1,2-Propylene glycol | 57-55-6 | 50.00 | 0.00169500 | ||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | 10.00 | 0.00033900 | |||||
ANIONIC POLYMER | 10.00 | 0.00033900 | ||||||
ANIONIC COPOLYMER | 10.00 | 0.00033900 | ||||||
Super 100NE | Superior Well Services | Surfactant/Foamer | Isopropanol | 67-63-0 | 30.00 | 0.03 | ||
2-Butoxyethanol | 111-76-2 | 7.00 | 0.00706810 | |||||
WFR-3B | Superior Well Services | Friction Reducer | 1,2-Propylene glycol | 57-55-6 | 25.00 | 0.02 | ||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | 0.00329310 | |||||
Stoddard solvent | 8052-41-3 | 10.00 | 0.00823280 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
KR-153SL | Superior Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 50.00 | 0.00169500 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00067800 | |||||
Diethylene glycol | 111-46-6 | 3.50 | 0.00011860 | |||||
Ethylene glycol | 107-21-1 | 1.00 | 0.00003390 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | SNYDER BROS INC | 52,805.00 | 147 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 57,885.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 38,821.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 29,615.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 22,714.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 20,123.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 16,685.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 15,478.00 | 356 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012 | SNYDER BROS INC | Drill Cuttings | 109.00 Tons | ON SITE ENCAPSULATION | |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 1,050.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | SNYDER BROS INC | Produced Fluid | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 270.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2012 | SNYDER BROS INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2013 | SNYDER BROS INC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2015 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | SNYDER BROS INC | Produced Fluid | 68.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | SNYDER BROS INC | Produced Fluid | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 88.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2058544 | Primary Facility | 2012-04-09 | Routine/Complete Inspection | No Violations Noted | Inspection as a result of a SPUD noticed received on 4/9/2012. At the time of inspection site construction was underway. E&S controls were installed as outlined in the plan and no accelerated erosion was observed in relation to the well pad construction or the access road. |
2067682 | Primary Facility | 2012-05-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not in production. The E&S plan was onsite and implemented as designed. No acceleration was observed in relation to the well pad or the access road. The Department notes that an open drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. |
2082487 | Primary Facility | 2012-07-11 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The E&S plan was onsite and implemented as designed. No acceleration was observed in relation to the well pad or the access road. The Department notes that at the time of inspection the Operator was in the process of restoring the site. The Department suggests the Operator leave the BMP's installed until the site has been restored. The Department also suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure erosion and sedimentation is kept at a minimum. |
2104455 | Primary Facility | 2012-10-02 | Site Restoration | No Violations Noted | At the time of inspection the well appears to be drilled and equipped for production. The well apparatus and brine tanks located onsite appear to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The site appears to meet the 70% uniform vegetative coverage criteria for restoration. The site is restored. |
2110444 | Primary Facility | 2012-10-24 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2115252 | Primary Facility | 2012-11-13 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located osnite and it appeared to be in sound condition. Site had been properly regraded, seeded, mulched, and temporary vegetative cover until the next crop planting season had been implemented. |
2170525 | Primary Facility | 2013-05-29 | Site Restoration | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2448056 | Primary Facility | 2016-02-09 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-equipment-2-100 bbl tanks look ok. |
2486992 | Primary Facility | 2016-05-24 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that the well was located amidst agricultural fields. |
For data sources see[8]