If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Pickaway_County,_Ohio|Pickaway]] | | County: [[Pickaway_County,_Ohio|Pickaway]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Jackson Township,_Pickaway_County,_Ohio|Jackson Township]] |
|- | |- | ||
| Operator Name: [[HOUGHTON INVESTMENTS LLC]] | | Operator Name: [[HOUGHTON INVESTMENTS LLC]] |
Well ID: 34-129-20224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.605506896,"lon":-82.97841662,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Pickaway | |
Municipality: Jackson Township | |
Operator Name: HOUGHTON INVESTMENTS LLC | |
Well Pad ID: | |
Farm/Lease Name: RICHARDS-STEVENSON (SWIW #11) | |
License Status: Active Injection | |
License Date: 2018-08-08 | |
Spud Date: 2018-01-09 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2018-01-20 | |
Well Total Depth: 2604 ft | |
Configuration: Vertical | |
Latitude: 39.605506896 | |
Longitude: -82.97841662 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-01-23 | Proposed Formations:TREMPEALEAU, Issued Date:1/23/2009, Expired Date:1/23/2010 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Original Spud | 2009-02-02
-308. DATE CHANGED 11/7/2018. | |
Plugged/Abandoned | 2009-02-10
-308. DATE CHANGED 11/7/2018. | |
APP | 2017-11-22 | Proposed Formations:TREMPEALEAU DOLOMITE, Issued Date:11/22/2017, Expired Date:11/22/2019 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2018-01-20
-308. DATE CHANGED 11/7/2018. | |
Completion Report Received | 2018-02-21
-308. DATE CHANGED 11/7/2018. | |
APP | 2018-08-08 | Proposed Formations:TREMPEALEAU DOLOMITE, Issued Date:8/8/2018, Expired Date:8/7/2020 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Last Compliance Report | 2018-11-07
-308. DATE CHANGED 11/7/2018. | |
Record Last Modified | 2018-11-07
-308. DATE CHANGED 11/7/2018. | |
Construction Permit Expires | 2020-08-07
-308. DATE CHANGED 11/7/2018. |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0246930102 | 2008-02-18 | Drill / Deepen / Reopen | No Violations | Well as plugged on 2/10/2009, All drilling equipment removed from site except one water tank. Area has been graded and pits filled in. Well still open to surface.
- GPS well N 39.60555 W 082.97826 Acc. 9 |
0271060519 | 2009-02-10 | Plug / Plug Back | No Violations | - Drilling contractor Dow Bowman call to report that the well was dry and would be cemented.
- On site for cement plugging. Formation Cementing doing cementing. Four (4) plugs were set, 1st at bottom of well, 2nd at the Trenton formation, 3rd at surface casing and 4th at surface. - Drilling contractor plans to remove equipment of location on 2/12/2009 and locate on permit 34-129-2-0219 |
0283942137 | 2009-02-03 | Drill / Deepen / Reopen | No Violations | - On site for update of drilling progress. Drill depth 203 feet, operator will set 195 feet of conductor and cement. Operator plans on cementing conductor at 8:00 PM to night. Formation Cementing contacted. |
0371283091 | 2018-10-03 | Surface Facility Construction | No Violations | Permit to convert to salt water injection well 8-8-2018. Installed 1650 feet of 2 inch fiberglass injection line from the well to the containment dike. The injection line is threaded together from the well to the surface facility dike. The ditch has not been excavated. |
0468873912 | 2018-04-10 | Salt Water Injection Well | No Violations | I received a request from central office to perform a pre-site inspection of this proposed salt water injection well. I performed the inspection and sent the results to the UIC section at central office. |
0503065924 | 2018-01-30 | Drill / Deepen / Reopen | No Violations | Kenny Rich drilling is preparing to drill out the cement plug that was left in when the 4.5 inch diameter production string was cemented. |
0574634254 | 2019-02-05 | Salt Water Injection Well | No Violations | Inspected the containment dike, tank, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluid. |
0717131585 | 2018-09-27 | Surface Facility Construction | No Violations | Permit to convert to salt water injection well 8-8-2018. Currently constructing the earthen containment dike. The dike is 30 feet by 40 feet by 4 feet tall. A 30 mil plastic liner has been installed with a 3 inch layer of sand under the liner. Sand and gravel are being placed on top of the liner. |
0887477516 | 2009-06-10 | Final Restoration | No Violations | well was drilled and plugged on 2/10/2009. All pits have been filled area has been graded and soybean have been planted and are growing. Road has been graded and stoned. |
0925001630 | 2009-02-04 | Drill / Deepen / Reopen | No Violations | - On site for Surface Casing. 8 7/8 inch hole drilled to 720 feet, 693 feet plus 10foot landing joint of new 7inch casing place into well.
- Formation Cementing Inc. used 120 sacks of cement with 400 lbs. of accelerator and 150 lbs of cotton seed hulls. Good circulation when pumping cement into well. Cement weight 15.7 Yield 1.18. |
0967363940 | 2018-11-08 | Salt Water Injection Well | No Violations | Chiefs Order # 2018-308 Permit to inject. Witnessed initial injection operations. Inspected the containment dike, tank, injection pump, murphy pressure cut off switch, injection pressure and annulus pressure. Identification is posted on the tank. The containment dike if free of fluids. |
1129109188 | 2018-09-20 | Production Wells | No Violations | Permit to Convert to Salt Water Injection Well 8-8-2018. Berry Well Service rig on site to install used 2 3/8 inch PVC lined steel tubing with a new Parmaco Shear Tension Packer. Packer set at 2509 feet. Producers pump truck circulated fresh water and inhibitor into MartinDill Vac truck. Packer was set and annulus was pressured up to 660 psi. At 5 minutes 660 psi, at 15 minutes 650 psi. A master valve was installed on the injection tubing and the valve is closed. |
1238099804 | 2009-03-24 | Final Restoration | No Violations | - Operator has filled in all pit and graded the area. The casing has been cut below grade and operator has photo of ID plate on casing.
- The area will be used for agricultural framing, the area has also been prep for planting farm crops. - Photos taken of the area. |
1381988389 | 2018-12-13 | Salt Water Injection Well | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted at the well and tank. The containment dike is free of fluids. The two pen recorder has a current chart installed. |
1396144518 | 2018-01-12 | Urban Drill / Deepen / Reopen | No Violations | Kenny Rich Drilling has reached 1500 feet drilling out the cement plugs. The desired total depth is 2600 feet. This well will be used for a salt water injection well. |
1458571214 | 2017-12-13 | Drill / Deepen / Reopen | No Violations | Houghton Investments plans to reopen this well to use as a injection well. The permit conditions state no earthen pits are allowed. This is because of the well is in a flood plain. I have waved this requirement due to the fact the reopen will be in January and the time frame to drill out the cement plugs will be short. |
1539195930 | 2018-10-04 | Surface Facility Construction | No Violations | Permit to convert to salt water injection well 8-8-2018. Installed 1650 feet of 2 inch fiberglass injection line from the well to the containment dike. The line is approximately 3 feet deep. The injection line is not connected to the injection tubing or the injection facility. The injection line was tested at 600 psi for 15 minutes with no loss in pressure. |
1539699945 | 2018-10-16 | Surface Facility Construction | No Violations | Permit to convert to salt water injection well 8/8/2018. Injection line test. The 2 inch fiberglass injection line was tested from the injection pump to the injection tubing master valve. Test was at 590 psi, at 5 minutes 590 psi, at 15 minutes at 585 psi. A Murphy switch is installed in line with the injection pump. The 300 barrel fiberglass tank in the containment dike is anchored with four cables. Identification is posted. The containment dike is free of fluids. |
1725502983 | 2018-09-20 | Production Wells | No Violations | Permit to Convert to Salt Water Injection Well 8-8-2018. Berry Well Service rig on site to clean out open hole portion of the well. Producers service corporation is on site to do an acid treatment. An earthen pit lined with plastic has been constructed next to the well along side of the service rig. The earthen pit is being used to circulate fluid from the well. There is a steel half round tank on a trailer on the opposite side of the service rig that is being used for fresh water storage. I told Tom Atha that the Earthen pit is a permit violation. The Permit to Convert dated 8-8-2018 states: FLOODPLAIN AREA: NO EARTHEN PITS ALLOWED. The permit also states: BLOW OUT PREVENTOR REQUIRED The service rig was attempting to clean out the open hole portion of the well with out well control device installed on the wellhead. The earthen pit is to be cleaned out and plastic liner removed. Backfill the pit. All fluids to be taken to an approved class 2 injection facility. |
1873340269 | 2009-02-02 | Drill / Deepen / Reopen | No Violations | - Dow Bowman rig moved on site and in the process of setting up. One pit dug and operator mixing drilling mud. |
2052104282 | 2018-01-22 | Drill / Deepen / Reopen | No Violations | Kenny Rich drilling has cleaned out the plugged well to 2595 feet. They ran 2552 feet of 4.5 inch diameter casing. Cemenco ran 4 centralizers on the 4.5 inch diameter casing and 75 sacks of neat cement with good returns to the pit. The packer will be set at a later date. The casing was tested at 600 psi for 5 minutes with no loss in pressure. |
For data sources see[3]