X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-24829"

m
m
Line 9: Line 9:
 
| State: Ohio
 
| State: Ohio
 
|-
 
|-
| County: <County>
+
| County: [[Wayne_County,_Ohio|Wayne]]
 
|-
 
|-
| Municipality: [[Canaan Township,_Wayne_County,_Ohio|Canaan Township]]
+
| Municipality: [[Canaan_Township,_Wayne_County,_Ohio|Canaan Township]]
 
|-
 
|-
 
| Operator Name: [[C & C PRODUCING LLC]]
 
| Operator Name: [[C & C PRODUCING LLC]]

Revision as of 05:21, 31 August 2019

Well Details

Well ID: 34-169-24829
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: C & C PRODUCING LLC
Well Pad ID:
Farm/Lease Name: DOTTERER JOSEPH E
License Status: Producing
License Date: 1991-02-04
Spud Date: 1991-03-08
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1991-03-12
Well Total Depth: 5800 ft
Configuration: Vertical
Latitude: 40.902651320
Longitude: -81.90527191

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1991-02-04 Issued Date 2/4/91 Expired Date 2/4/92 Acres 0040000 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05800 Proposed Drill Depth 05800
Original Spud 1991-03-08
Completed 1991-03-12
Reached Total Depth 1991-03-12
CO 1991-09-10 265 CSAPO FRANK A JR GeoDate 2/4/91
Completion Report Received 1991-11-27
Construction Permit Expires 1992-02-04
Change of Owner 2012-01-04 Operator changed from 265, CSAPO LIMITED to 8423, C & C PRODUCING LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5566 5572 7
1997-06-29 5523 5590 0
2006-09-11 5704 5720 33
2006-09-11 5590 5598 9

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 28 1500 Gal 0 ACIDIZED W/1800 GAL 28% ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 CSAPO LIMITED 2068 656 82
1992 CSAPO LIMITED 31144 1968 365
1993 CSAPO LIMITED 22984 1640 365
1994 CSAPO LIMITED 22513 1905 365
1995 CSAPO LIMITED 19034 1868 365
1996 CSAPO LIMITED 15485 1863 365
1997 CSAPO LIMITED 7870 1408 365
1998 CSAPO LIMITED 1088 667 365
2000 CSAPO LIMITED 161 249 365
2001 CSAPO LIMITED 115 346 365
2002 CSAPO LIMITED 95 214 365
2003 CSAPO LIMITED 127 575 365
2004 CSAPO LIMITED 188 457 365
2005 CSAPO LIMITED 171 289 365
2006 CSAPO LIMITED 75 143 365
2007 CSAPO LIMITED 184 416 365
2008 CSAPO LIMITED 244 459 365
2009 CSAPO LIMITED 197 380 365
2010 CSAPO LIMITED 391 579 365
2011 CSAPO LIMITED 336 689 365
2012 C & C PRODUCING LLC 484 815 366
2013 C & C PRODUCING LLC 358 653 365
2014 C & C PRODUCING LLC 448 748 365
2015 C & C PRODUCING LLC 317 709 365
2016 C & C PRODUCING LLC 378 613 365
2017 C & C PRODUCING LLC 377 618 365
2018 C & C PRODUCING LLC 370 838 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 CSAPO LIMITED Brine 3283 82
1992 CSAPO LIMITED Brine 1640 365
1993 CSAPO LIMITED Brine 1254 365
1994 CSAPO LIMITED Brine 1388 365
1995 CSAPO LIMITED Brine 1162 365
1996 CSAPO LIMITED Brine 676 365
1997 CSAPO LIMITED Brine 162 365
1998 CSAPO LIMITED Brine 533 365
2000 CSAPO LIMITED Brine 611 365
2001 CSAPO LIMITED Brine 173 365
2002 CSAPO LIMITED Brine 217 365
2003 CSAPO LIMITED Brine 275 365
2004 CSAPO LIMITED Brine 330 365
2005 CSAPO LIMITED Brine 372 365
2006 CSAPO LIMITED Brine 60 365
2007 CSAPO LIMITED Brine 427 365
2008 CSAPO LIMITED Brine 507 365
2009 CSAPO LIMITED Brine 575 365
2010 CSAPO LIMITED Brine 662 365
2011 CSAPO LIMITED Brine 641 365
2012 C & C PRODUCING LLC Brine 801 366
2013 C & C PRODUCING LLC Brine 715 365
2014 C & C PRODUCING LLC Brine 745 365
2015 C & C PRODUCING LLC Brine 730 365
2016 C & C PRODUCING LLC Brine 709 365
2017 C & C PRODUCING LLC Brine 638 365
2018 C & C PRODUCING LLC Brine 884 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000002440 Preliminary Restoration No Violations PASSED Y WITNESSED 6/10/91 INSPECTOR GREGORY, HAROLD DATE 06/1019/91 DATA FROM OLD VAX INFO
0508810077 2014-04-08 Production Wells No Violations This pumping unit well has no apparent problems at time of inspection.
0548455723 2017-03-20 Preliminary Restoration No Violations Inspected production well on 03/20/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes.
0714949418 2016-10-04 Production Wells No Violations Inspected production well on 10/04/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The diked area is shared with the production equipment for the Croft #1 and Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1081903715 2016-10-04 Preliminary Restoration No Violations Inspected production well on 10/04/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1438689799 2015-08-03 Production Wells No Violations This is a pumping unit well that has no apparent problems nor compliance issues at this time.
1456422914 2015-12-07 Production Wells No Violations Inspected production well on 12/07/2015. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, 1-2,100 gal plastic tank, and 2-vertical separators located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1498318073 2013-05-03 Production Wells No Violations This is a producing pump unit. No problems are apparent at this time.
1641848484 2017-03-20 Production Wells No Violations Inspected production well on 03/20/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; the diked area is shared with the tank battery for the Croft #1 and Virgil Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1770584735 2018-03-20 Production Wells No Violations Inspected production well on 03/20/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, and 1-meter box, located within an earthen dike; the diked area is shared with the tank battery for the Croft #1 and Virgil Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.

For data sources see[9]

References