If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24829 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: C & C PRODUCING LLC | |
Well Pad ID: | |
Farm/Lease Name: DOTTERER JOSEPH E | |
License Status: Producing | |
License Date: 1991-02-04 | |
Spud Date: 1991-03-08 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1991-03-12 | |
Well Total Depth: 5800.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1991-02-04 | Issued Date 2/4/91 Expired Date 2/4/92 Acres 0040000 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05800 Proposed Drill Depth 05800 |
Original Spud | 1991-03-08 | |
Completed | 1991-03-12 | |
Reached Total Depth | 1991-03-12 | |
CO | 1991-09-10 | 265 CSAPO FRANK A JR GeoDate 2/4/91 |
Completion Report Received | 1991-11-27 | |
Construction Permit Expires | 1992-02-04 | |
Change of Owner | 2012-01-04 | Operator changed from 265, CSAPO LIMITED to 8423, C & C PRODUCING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5566 | 5572 | 7 |
5523 | 5590 | 0 | |
1997-06-29 | 5523 | 5590 | 0 |
5566 | 5572 | 7 | |
5523 | 5590 | 0 | |
2006-09-11 | 5704 | 5720 | 33 |
2006-09-11 | 5590 | 5598 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 28 | 1500 Gal | 0 | ACIDIZED W/1800 GAL 28% ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CSAPO LIMITED | 2068.00 | 656.00 | 82 |
1992 | CSAPO LIMITED | 31144.00 | 1968.00 | 365 |
1993 | CSAPO LIMITED | 22984.00 | 1640.00 | 365 |
1994 | CSAPO LIMITED | 22513.00 | 1905.00 | 365 |
1995 | CSAPO LIMITED | 19034.00 | 1868.00 | 365 |
1996 | CSAPO LIMITED | 15485.00 | 1863.00 | 365 |
1997 | CSAPO LIMITED | 7870.00 | 1408.00 | 365 |
1998 | CSAPO LIMITED | 1088.00 | 667.00 | 365 |
2000 | CSAPO LIMITED | 161.00 | 249.00 | 365 |
2001 | CSAPO LIMITED | 115.00 | 346.00 | 365 |
2002 | CSAPO LIMITED | 95.00 | 214.00 | 365 |
2003 | CSAPO LIMITED | 127.00 | 575.00 | 365 |
2004 | CSAPO LIMITED | 188.00 | 457.00 | 365 |
2005 | CSAPO LIMITED | 171.00 | 289.00 | 365 |
2006 | CSAPO LIMITED | 75.00 | 143.00 | 365 |
2007 | CSAPO LIMITED | 184.00 | 416.00 | 365 |
2008 | CSAPO LIMITED | 244.00 | 459.00 | 365 |
2009 | CSAPO LIMITED | 197.00 | 380.00 | 365 |
2010 | CSAPO LIMITED | 391.00 | 579.00 | 365 |
2011 | CSAPO LIMITED | 336.00 | 689.00 | 365 |
2012 | C & C PRODUCING LLC | 484.00 | 815.00 | 366 |
2013 | C & C PRODUCING LLC | 358.00 | 653.00 | 365 |
2014 | C & C PRODUCING LLC | 448.00 | 748.00 | 365 |
2015 | C & C PRODUCING LLC | 317.00 | 709.00 | 365 |
2016 | C & C PRODUCING LLC | 378.00 | 613.00 | 365 |
2017 | C & C PRODUCING LLC | 377.00 | 618.00 | 365 |
2018 | C & C PRODUCING LLC | 370.00 | 838.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CSAPO LIMITED | Brine | 3283 | 82 |
1992 | CSAPO LIMITED | Brine | 1640 | 365 |
1993 | CSAPO LIMITED | Brine | 1254 | 365 |
1994 | CSAPO LIMITED | Brine | 1388 | 365 |
1995 | CSAPO LIMITED | Brine | 1162 | 365 |
1996 | CSAPO LIMITED | Brine | 676 | 365 |
1997 | CSAPO LIMITED | Brine | 162 | 365 |
1998 | CSAPO LIMITED | Brine | 533 | 365 |
2000 | CSAPO LIMITED | Brine | 611 | 365 |
2001 | CSAPO LIMITED | Brine | 173 | 365 |
2002 | CSAPO LIMITED | Brine | 217 | 365 |
2003 | CSAPO LIMITED | Brine | 275 | 365 |
2004 | CSAPO LIMITED | Brine | 330 | 365 |
2005 | CSAPO LIMITED | Brine | 372 | 365 |
2006 | CSAPO LIMITED | Brine | 60 | 365 |
2007 | CSAPO LIMITED | Brine | 427 | 365 |
2008 | CSAPO LIMITED | Brine | 507 | 365 |
2009 | CSAPO LIMITED | Brine | 575 | 365 |
2010 | CSAPO LIMITED | Brine | 662 | 365 |
2011 | CSAPO LIMITED | Brine | 641 | 365 |
2012 | C & C PRODUCING LLC | Brine | 801 | 366 |
2013 | C & C PRODUCING LLC | Brine | 715 | 365 |
2014 | C & C PRODUCING LLC | Brine | 745 | 365 |
2015 | C & C PRODUCING LLC | Brine | 730 | 365 |
2016 | C & C PRODUCING LLC | Brine | 709 | 365 |
2017 | C & C PRODUCING LLC | Brine | 638 | 365 |
2018 | C & C PRODUCING LLC | Brine | 884 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1708668044 | 2020-4-28 0:00: | PW | No Violations | |
-508810077 | 2014-4-8 0:00:0 | PW | No Violations | 0.50 |
-548455723 | 2017-3-20 0:00: | PL | No Violations | |
0000002440 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 6/10/91 INSPECTOR GREGORY, HAROLD DATE 06/1019/91 DATA FROM OLD VAX INFO | |
0508810077 | 2014-04-08 | Production Wells | No Violations | This pumping unit well has no apparent problems at time of inspection. |
0548455723 | 2017-03-20 | Preliminary Restoration | No Violations | Inspected production well on 03/20/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0714949418 | 2016-10-04 | Production Wells | No Violations | Inspected production well on 10/04/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The diked area is shared with the production equipment for the Croft #1 and Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1081903715 | 2016-10-04 | Preliminary Restoration | No Violations | Inspected production well on 10/04/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1438689799 | 2015-08-03 | Production Wells | No Violations | This is a pumping unit well that has no apparent problems nor compliance issues at this time. |
1456422914 | 2015-12-07 | Production Wells | No Violations | Inspected production well on 12/07/2015. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, 1-2,100 gal plastic tank, and 2-vertical separators located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1498318073 | 2013-05-03 | Production Wells | No Violations | This is a producing pump unit. No problems are apparent at this time. |
1641848484 | 2017-03-20 | Production Wells | No Violations | Inspected production well on 03/20/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; the diked area is shared with the tank battery for the Croft #1 and Virgil Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1770584735 | 2018-03-20 | Production Wells | No Violations | Inspected production well on 03/20/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, and 1-meter box, located within an earthen dike; the diked area is shared with the tank battery for the Croft #1 and Virgil Gasser #2 wells (PN: 169-20815/24727). The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
2440 | PL | No Violations | ||
714949418 | 2016-10-4 0:00: | PW | No Violations |
For data sources see[9]