If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 226: | Line 226: | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1991-06-27 |
− | | | + | | Chemical Squeeze |
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-09-14 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 238: | Line 238: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-11-08 |
− | | | + | | Chemical Squeeze |
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-02-04 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 250: | Line 250: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-02-22 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 256: | Line 256: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-03-03 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 262: | Line 262: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-03-04 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 268: | Line 268: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-03-12 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 274: | Line 274: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-04-06 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 280: | Line 280: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-04-09 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 286: | Line 286: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1985-05-13 |
− | | | + | | Acid Treatment |
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 1992- | + | | 1992-11-06 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 298: | Line 298: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1993-04-24 |
− | | | + | | Perforation |
+ | | style="text-align: right;" | 2905.00 | ||
+ | | style="text-align: right;" | 2906.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1993-04-24 | ||
+ | | Perforation | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
+ | | style="text-align: right;" | 2917.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1993-04-26 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2905.00 | ||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1988-12-10 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 310: | Line 322: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1988-12-12 |
− | | | + | | Acid Treatment |
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-02-05 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 322: | Line 334: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-02-11 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 328: | Line 340: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-02-13 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 334: | Line 346: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-05-25 |
| Chemical Squeeze | | Chemical Squeeze | ||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
Line 340: | Line 352: | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1991-06-24 |
− | | | + | | Chemical Squeeze |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 2913.00 | | style="text-align: right;" | 2913.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 2917.00 | | style="text-align: right;" | 2917.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 502: | Line 502: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0495112202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.237904,"lon":-115.523634,"icon":""}]} |
Location: 00/02-22-049-11W5/0 | |
Location Alias: 00/02-22-49-11 W5M | |
Location Alias 2: 00/02-22-049-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 11 | |
Section: 22 | |
County/Municipality: Brazeau County | |
Well Name: KEYERA PEMBINA 2-22-49-11 | |
Operator Name: Keyera Energy Ltd. | |
License Number: 0114130 | |
License Date: 1985-03-28 | |
License Status: Suspension | |
Spud Date: 1985-04-01 | |
Final Drill Date: 1985-04-30 | |
Well Total Depth: 2940.00 m | |
Surface Hole Latitude: 53.237904 | |
Surface Hole Longitude: -115.523634 |
Date | Event |
---|---|
1985-03-28 | Obtained License |
1985-04-02 | Surface Casing Operation Performed |
1985-04-30 | Finished Drilling |
1985-04-30 | Well Log Performed |
1985-04-30 | Well Mode changed to Drilled and Cased |
1985-05-02 | Lost Circulation Occurred |
1985-05-02 | Production Casing Operation Performed |
1985-05-03 | Rig Released |
1985-05-07 | Well Log Performed |
1985-05-08 | Perforation Treatment Performed - Jet Perforation |
1985-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-05-27 | Well Began Production |
1985-05-27 | Well Fluid changed to Crude Oil |
1985-05-27 | Well Mode changed to Flowing |
1986-06-06 | Well Log Performed |
1987-05-27 | Well Log Performed |
1988-07-02 | Well Log Performed |
1988-12-10 | Perforation Treatment Performed - Chemical Squeeze |
1988-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-02-05 | Perforation Treatment Performed - Chemical Squeeze |
1991-02-11 | Perforation Treatment Performed - Chemical Squeeze |
1991-02-13 | Perforation Treatment Performed - Chemical Squeeze |
1991-05-25 | Perforation Treatment Performed - Chemical Squeeze |
1991-06-24 | Perforation Treatment Performed - Chemical Squeeze |
1991-06-27 | Perforation Treatment Performed - Chemical Squeeze |
1991-09-14 | Perforation Treatment Performed - Chemical Squeeze |
1991-11-08 | Perforation Treatment Performed - Chemical Squeeze |
1992-02-04 | Perforation Treatment Performed - Chemical Squeeze |
1992-02-22 | Perforation Treatment Performed - Chemical Squeeze |
1992-03-03 | Perforation Treatment Performed - Chemical Squeeze |
1992-03-04 | Perforation Treatment Performed - Chemical Squeeze |
1992-03-12 | Perforation Treatment Performed - Chemical Squeeze |
1992-04-06 | Perforation Treatment Performed - Chemical Squeeze |
1992-04-09 | Perforation Treatment Performed - Chemical Squeeze |
1992-11-06 | Perforation Treatment Performed - Chemical Squeeze |
1993-04-24 | Perforation Treatment Performed - Jet Perforation |
1993-04-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-04-28 | Well Log Performed |
1993-04-29 | Well Log Performed |
1993-05-11 | Well Log Performed |
1999-04-01 | Well Fluid changed to Crude Oil |
1999-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-08 | Perforation | 2913.00 | 2917.00 | 13 |
1991-06-27 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-09-14 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-11-08 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-02-04 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-02-22 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-03-03 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-03-04 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-03-12 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-04-06 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1992-04-09 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1985-05-13 | Acid Treatment | 2913.00 | 2917.00 | 0 |
1992-11-06 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1993-04-24 | Perforation | 2905.00 | 2906.00 | 13 |
1993-04-24 | Perforation | 2913.00 | 2917.00 | 13 |
1993-04-26 | Acid Treatment | 2905.00 | 2917.00 | 0 |
1988-12-10 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1988-12-12 | Acid Treatment | 2913.00 | 2917.00 | 0 |
1991-02-05 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-02-11 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-02-13 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-05-25 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
1991-06-24 | Chemical Squeeze | 2913.00 | 2917.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 3053 | 0.0 | 0.0 | 0.0 |
1986 | 4629 | 0.0 | 0.0 | 0.0 |
1987 | 5371 | 0.0 | 0.0 | 0.0 |
1988 | 6357 | 0.0 | 0.0 | 0.0 |
1989 | 7272 | 0.0 | 0.0 | 0.0 |
1990 | 8320 | 0.0 | 0.0 | 0.0 |
1991 | 8043 | 0.0 | 0.0 | 0.0 |
1992 | 7845 | 0.0 | 0.0 | 0.0 |
1993 | 6699 | 0.0 | 0.0 | 0.0 |
1994 | 7137 | 0.0 | 0.0 | 0.0 |
1995 | 6047 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-05-02 | Lost Circulation | 2940.00 | 2940.00 |
For data sources see[6]