X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112202000

Well Details

Well ID: 0495112202000
Loading map...
Location: 00/02-22-049-11W5/0
Location Alias: 00/02-22-49-11 W5M
Location Alias 2: 00/02-22-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 22
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 2-22-49-11
Operator Name: Keyera Energy Ltd.
License Number: 0114130
License Date: 1985-03-28
License Status: Suspension
Spud Date: 1985-04-01
Final Drill Date: 1985-04-30
Well Total Depth: 2940.00 m
Surface Hole Latitude: 53.237904
Surface Hole Longitude: -115.523634

For data sources see[1][2]

Well History

Date Event
1985-03-28 Obtained License
1985-04-02 Surface Casing Operation Performed
1985-04-30 Finished Drilling
1985-04-30 Well Log Performed
1985-04-30 Well Mode changed to Drilled and Cased
1985-05-02 Lost Circulation Occurred
1985-05-02 Production Casing Operation Performed
1985-05-03 Rig Released
1985-05-07 Well Log Performed
1985-05-08 Perforation Treatment Performed - Jet Perforation
1985-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-27 Well Began Production
1985-05-27 Well Fluid changed to Crude Oil
1985-05-27 Well Mode changed to Flowing
1986-06-06 Well Log Performed
1987-05-27 Well Log Performed
1988-07-02 Well Log Performed
1988-12-10 Perforation Treatment Performed - Chemical Squeeze
1988-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-05 Perforation Treatment Performed - Chemical Squeeze
1991-02-11 Perforation Treatment Performed - Chemical Squeeze
1991-02-13 Perforation Treatment Performed - Chemical Squeeze
1991-05-25 Perforation Treatment Performed - Chemical Squeeze
1991-06-24 Perforation Treatment Performed - Chemical Squeeze
1991-06-27 Perforation Treatment Performed - Chemical Squeeze
1991-09-14 Perforation Treatment Performed - Chemical Squeeze
1991-11-08 Perforation Treatment Performed - Chemical Squeeze
1992-02-04 Perforation Treatment Performed - Chemical Squeeze
1992-02-22 Perforation Treatment Performed - Chemical Squeeze
1992-03-03 Perforation Treatment Performed - Chemical Squeeze
1992-03-04 Perforation Treatment Performed - Chemical Squeeze
1992-03-12 Perforation Treatment Performed - Chemical Squeeze
1992-04-06 Perforation Treatment Performed - Chemical Squeeze
1992-04-09 Perforation Treatment Performed - Chemical Squeeze
1992-11-06 Perforation Treatment Performed - Chemical Squeeze
1993-04-24 Perforation Treatment Performed - Jet Perforation
1993-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-28 Well Log Performed
1993-04-29 Well Log Performed
1993-05-11 Well Log Performed
1999-04-01 Well Fluid changed to Crude Oil
1999-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-08 Perforation 2913.00 2917.00 13
1991-06-27 Chemical Squeeze 2913.00 2917.00 0
1991-09-14 Chemical Squeeze 2913.00 2917.00 0
1991-11-08 Chemical Squeeze 2913.00 2917.00 0
1992-02-04 Chemical Squeeze 2913.00 2917.00 0
1992-02-22 Chemical Squeeze 2913.00 2917.00 0
1992-03-03 Chemical Squeeze 2913.00 2917.00 0
1992-03-04 Chemical Squeeze 2913.00 2917.00 0
1992-03-12 Chemical Squeeze 2913.00 2917.00 0
1992-04-06 Chemical Squeeze 2913.00 2917.00 0
1992-04-09 Chemical Squeeze 2913.00 2917.00 0
1985-05-13 Acid Treatment 2913.00 2917.00 0
1992-11-06 Chemical Squeeze 2913.00 2917.00 0
1993-04-24 Perforation 2905.00 2906.00 13
1993-04-24 Perforation 2913.00 2917.00 13
1993-04-26 Acid Treatment 2905.00 2917.00 0
1988-12-10 Chemical Squeeze 2913.00 2917.00 0
1988-12-12 Acid Treatment 2913.00 2917.00 0
1991-02-05 Chemical Squeeze 2913.00 2917.00 0
1991-02-11 Chemical Squeeze 2913.00 2917.00 0
1991-02-13 Chemical Squeeze 2913.00 2917.00 0
1991-05-25 Chemical Squeeze 2913.00 2917.00 0
1991-06-24 Chemical Squeeze 2913.00 2917.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3053 0.0 0.0 0.0
1986 4629 0.0 0.0 0.0
1987 5371 0.0 0.0 0.0
1988 6357 0.0 0.0 0.0
1989 7272 0.0 0.0 0.0
1990 8320 0.0 0.0 0.0
1991 8043 0.0 0.0 0.0
1992 7845 0.0 0.0 0.0
1993 6699 0.0 0.0 0.0
1994 7137 0.0 0.0 0.0
1995 6047 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-05-02 Lost Circulation 2940.00 2940.00

For data sources see[6]

References