If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-115-24641 | | Well ID: 34-115-24641 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.677891, -81.99609772 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Morgan County, Ohio|Morgan]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ALTIER H L SERVICE CO INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2008-11-13 | | Spud Date: 2008-11-13 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.677891 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.99609772 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | - | + | | 2009-0 |
− | | | + | | style="text-align:right;" | 0.0 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | style="text-align:right;" | 0.0 |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | 2010-0 |
− | | | + | | style="text-align:right;" | 426.0 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | style="text-align:right;" | 0.0 |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | 2011-0 |
− | | | + | | style="text-align:right;" | 3166.0 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | style="text-align:right;" | 76.0 |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | 2012-0 |
− | | | + | | style="text-align:right;" | 1962.0 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | style="text-align:right;" | 0.0 |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | - | + | | 2013-0 |
− | | | + | | style="text-align:right;" | 349.0 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | style="text-align:right;" | 0.0 |
− | | | + | | |
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == Inspection Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | INSPECTION ID | ||
+ | !scope="col" | DATE | ||
+ | !scope="col" | DESCRIPTION | ||
+ | !scope="col" | COMMENT | ||
+ | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION COMMENT | ||
|- | |- | ||
− | | - | + | | -1057553113 |
− | | | + | | 2014-10-15 |
− | | | + | | |
− | | The | + | | The well is now in compliance. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1057553113 |
− | | | + | | 2014-10-15 |
− | | | + | | |
− | | The | + | | The well is now in compliance. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1057553113 |
− | | | + | | 2014-10-15 |
− | | | + | | |
− | | The | + | | The well is now in compliance. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
|- | |- | ||
|- | |- | ||
− | | - | + | | -1057553113 |
− | | | + | | 2014-10-15 |
− | | | + | | |
− | | | + | | The well is now in compliance. |
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|- | |- | ||
| 1111257861 | | 1111257861 | ||
| 2014-04-07 | | 2014-04-07 | ||
− | | | + | | |
| Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I called and talked to Sean Altier and he said once the weather improves and the ground is dry he will till and seed the dike. | | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I called and talked to Sean Altier and he said once the weather improves and the ground is dry he will till and seed the dike. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1191861871 | ||
+ | | 2014-06-23 | ||
+ | | | ||
+ | | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I spoke with Sean Altier and he said he will get his son down there to till area and plant seed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1229636807 | | 1229636807 | ||
| 2008-12-18 | | 2008-12-18 | ||
− | | | + | | |
− | | Stopped by drilling rig for update they were preparing to move rig to new drill site,TD on this well was 1280' and operator ran 1265' of used 4.5 | + | | Stopped by drilling rig for update they were preparing to move rig to new drill site,TD on this well was 1280' and operator ran 1265' of used 4.5 casing in hole and cemented in place with 30 sk cement. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1240870998 | | 1240870998 | ||
| 2009-04-27 | | 2009-04-27 | ||
− | | | + | | |
| Drlg pit emptied and filled in, restoration work not done on well site or lease road. Spud date 11/13/08, due date 8/13/09 | | Drlg pit emptied and filled in, restoration work not done on well site or lease road. Spud date 11/13/08, due date 8/13/09 | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1248376767 | | 1248376767 | ||
| 2009-12-09 | | 2009-12-09 | ||
− | | | + | | |
| Follow-up inspection revealed Preliminary Restoration not completed, no vegetation growing on well site. Spoke with Tim Altier (owner) about violation, Tim will have violation corrected in a couple weeks. | | Follow-up inspection revealed Preliminary Restoration not completed, no vegetation growing on well site. Spoke with Tim Altier (owner) about violation, Tim will have violation corrected in a couple weeks. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1382369266 | | 1382369266 | ||
| 2013-10-21 | | 2013-10-21 | ||
− | | | + | | |
| Compliance Action Follow-up -194364511: Sean Altier has repaired the stuffing box and fixed the steel line in the dike. He has cleaned up around the wellhead but still needs to clean up scald area outside of the dike, which he stated would be in the next few weeks. He thinks someone was up there messing with the equipment. | | Compliance Action Follow-up -194364511: Sean Altier has repaired the stuffing box and fixed the steel line in the dike. He has cleaned up around the wellhead but still needs to clean up scald area outside of the dike, which he stated would be in the next few weeks. He thinks someone was up there messing with the equipment. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1418683446 | | 1418683446 | ||
| 2014-01-13 | | 2014-01-13 | ||
− | | | + | | |
| Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I will return when there is better weather and work with Sean to restore vegetative growth. | | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I will return when there is better weather and work with Sean to restore vegetative growth. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1522904713 | | 1522904713 | ||
| 2009-10-29 | | 2009-10-29 | ||
− | | | + | | |
| An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. Preliminary Restoration needs done, well site and lease road needs graded, seed, lime and mulched. Need full and legible ID at well head and tank battery. Failure to comply may result in a Forfeiture of Bond. | | An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. Preliminary Restoration needs done, well site and lease road needs graded, seed, lime and mulched. Need full and legible ID at well head and tank battery. Failure to comply may result in a Forfeiture of Bond. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1743896654 | ||
+ | | 2010-05-13 | ||
+ | | | ||
+ | | Follow-up on NOV, Non-Compliance, no action has been taken to complete Preliminary Restoration. Rob Stonerock called company and explained that restoration was past due and if not complied with a forfeiture of Bond may be issued. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | -194364511 |
+ | | 2013-09-09 | ||
+ | | | ||
+ | | The pumpjack was pumping when I arrived on location. The wellhead has a stuffing box leak which is causing oil contamination down into the conductor pipe and all over the wellhead. There are two 100 bbl tanks in the dike and at the base of the brine tank there is a puddle of brine contamination as a result of a disconnected steel line. It appears as if someone unscrewed the bull plug. There was also a disconnected steel elbow piece laying at the opening. There is a large kill area 15'x 60' leading from the dike and drain pipe downhill to the gate. There is a creek just next to the area, however there is no evidence of the contamination reaching the waters. It appears as if someone released the tubing inside the dike to allow the brine contaminated water to drain downhill. It also appears that the dike was overflowing and seeping the contamination in certain areas. The operator must repair or replace any faulty equipment at the wellhead and in the dike. The operator must remove all contamination at the wellhead and in and around the dike. The operator must lime, seed and mulch the area in order to restore vegetative growth. I talked to Tim Altier and he is going to try and get a hold of his brother Sean Altier, who pumps the wells, in order to take care of the issues. Sean Altier retuned my call and didn't know anything about the issues and will head out there tonight to take a look and get things cleaned up this week. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -20641406 | ||
| 2009-10-29 | | 2009-10-29 | ||
− | | | + | | |
− | | An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. | + | | FOLLOW UP TO NOV # 1522904713 An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -356908776 | ||
+ | | 2010-08-05 | ||
+ | | | ||
+ | | Follow-up on NOV, In-Compliance. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 576642741 | | 576642741 | ||
| 2010-04-13 | | 2010-04-13 | ||
− | | | + | | |
| Follow-up inspection revealed no action taken to comply with NOV. Preliminary Restoration has not been completed. Well site and tank pad is bare, no vegetation and starting to erode. Grade well site and place water diversions in as needed, seed, lime and mulch well site and tank pad in accordance with 1509.072(A). Will notify company by letter again, spoke with company about violation during winter. | | Follow-up inspection revealed no action taken to comply with NOV. Preliminary Restoration has not been completed. Well site and tank pad is bare, no vegetation and starting to erode. Grade well site and place water diversions in as needed, seed, lime and mulch well site and tank pad in accordance with 1509.072(A). Will notify company by letter again, spoke with company about violation during winter. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 919337494 | | 919337494 | ||
| 2009-10-29 | | 2009-10-29 | ||
− | | | + | | |
| FOLLOW UP TO NOV # -20641406 FOLLOW UP TO NOV # 1522904713 An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. | | FOLLOW UP TO NOV # -20641406 FOLLOW UP TO NOV # 1522904713 An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-115-24641 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.677891,"lon":-81.99609772,"icon":""}]} |
County: Morgan | |
Municipality: | |
Operator Name: ALTIER H L SERVICE CO INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-11-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.677891 | |
Longitude: -81.99609772 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2009-0 | 0.0 | 0.0 | ||||
2010-0 | 426.0 | 0.0 | ||||
2011-0 | 3166.0 | 76.0 | ||||
2012-0 | 1962.0 | 0.0 | ||||
2013-0 | 349.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1057553113 | 2014-10-15 | The well is now in compliance. | Compliance Notice | |||
-1057553113 | 2014-10-15 | The well is now in compliance. | Compliance Notice | |||
-1057553113 | 2014-10-15 | The well is now in compliance. | Compliance Notice | |||
-1057553113 | 2014-10-15 | The well is now in compliance. | Compliance Notice | |||
1111257861 | 2014-04-07 | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I called and talked to Sean Altier and he said once the weather improves and the ground is dry he will till and seed the dike. | ||||
-1191861871 | 2014-06-23 | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I spoke with Sean Altier and he said he will get his son down there to till area and plant seed. | ||||
1229636807 | 2008-12-18 | Stopped by drilling rig for update they were preparing to move rig to new drill site,TD on this well was 1280' and operator ran 1265' of used 4.5 casing in hole and cemented in place with 30 sk cement. | ||||
1240870998 | 2009-04-27 | Drlg pit emptied and filled in, restoration work not done on well site or lease road. Spud date 11/13/08, due date 8/13/09 | ||||
1248376767 | 2009-12-09 | Follow-up inspection revealed Preliminary Restoration not completed, no vegetation growing on well site. Spoke with Tim Altier (owner) about violation, Tim will have violation corrected in a couple weeks. | ||||
1382369266 | 2013-10-21 | Compliance Action Follow-up -194364511: Sean Altier has repaired the stuffing box and fixed the steel line in the dike. He has cleaned up around the wellhead but still needs to clean up scald area outside of the dike, which he stated would be in the next few weeks. He thinks someone was up there messing with the equipment. | ||||
1418683446 | 2014-01-13 | Compliance Action Follow-up -194364511: The side slope of the dike still has not been restored from previous contamination. I will return when there is better weather and work with Sean to restore vegetative growth. | ||||
1522904713 | 2009-10-29 | An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. Preliminary Restoration needs done, well site and lease road needs graded, seed, lime and mulched. Need full and legible ID at well head and tank battery. Failure to comply may result in a Forfeiture of Bond. | ||||
-1743896654 | 2010-05-13 | Follow-up on NOV, Non-Compliance, no action has been taken to complete Preliminary Restoration. Rob Stonerock called company and explained that restoration was past due and if not complied with a forfeiture of Bond may be issued. | ||||
-194364511 | 2013-09-09 | The pumpjack was pumping when I arrived on location. The wellhead has a stuffing box leak which is causing oil contamination down into the conductor pipe and all over the wellhead. There are two 100 bbl tanks in the dike and at the base of the brine tank there is a puddle of brine contamination as a result of a disconnected steel line. It appears as if someone unscrewed the bull plug. There was also a disconnected steel elbow piece laying at the opening. There is a large kill area 15'x 60' leading from the dike and drain pipe downhill to the gate. There is a creek just next to the area, however there is no evidence of the contamination reaching the waters. It appears as if someone released the tubing inside the dike to allow the brine contaminated water to drain downhill. It also appears that the dike was overflowing and seeping the contamination in certain areas. The operator must repair or replace any faulty equipment at the wellhead and in the dike. The operator must remove all contamination at the wellhead and in and around the dike. The operator must lime, seed and mulch the area in order to restore vegetative growth. I talked to Tim Altier and he is going to try and get a hold of his brother Sean Altier, who pumps the wells, in order to take care of the issues. Sean Altier retuned my call and didn't know anything about the issues and will head out there tonight to take a look and get things cleaned up this week. | ||||
-20641406 | 2009-10-29 | FOLLOW UP TO NOV # 1522904713 An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. | ||||
-356908776 | 2010-08-05 | Follow-up on NOV, In-Compliance. | ||||
576642741 | 2010-04-13 | Follow-up inspection revealed no action taken to comply with NOV. Preliminary Restoration has not been completed. Well site and tank pad is bare, no vegetation and starting to erode. Grade well site and place water diversions in as needed, seed, lime and mulch well site and tank pad in accordance with 1509.072(A). Will notify company by letter again, spoke with company about violation during winter. | ||||
919337494 | 2009-10-29 | FOLLOW UP TO NOV # -20641406 FOLLOW UP TO NOV # 1522904713 An inspection of the well revealed Preliminary Restoration not completed, well site and lease road needs graded, then seed and mulch. Spud date 11-13-08. No ID at well head or tank battery. |
For data sources see[2]