| Well ID: 34-019-22554
 
| Well ID: 34-019-22554
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6066726985, -81.0843025991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6066727, -81.0843026 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[R E GAS DEVELOPMENT LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-02-10
 
| Spud Date: 2014-02-10
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.6066726985
+
| Latitude: 40.6066727
 
|-
 
|-
| Longitude: -81.0843025991
+
| Longitude: -81.0843026
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 80167.0
 +
| style="text-align:right;" | 42.0
 +
|
 +
|
 +
| style="text-align:right;" | 9195.0
 +
| style="text-align:right;" | 42.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 141814.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 13256.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 101201.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 8954.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1393868827
 +
| 2014-03-03
 +
|
 +
| I was on site with Inspector Jim Bucksar to conduct an inspection of the drill site. We walked the entire perimeter of the site and found that the filter socks and silt fence  are intact and functioning properly. Our inspection of the rock channels revealed that the channels were intact and there was no erosion and sedimentation. We walked around the drilling rig and containment areas and found no spills on the containment or holes in the containment. Our inspection revealed no violations at this time. NOTE: We notified the Company Man and the Toolpusher that we were on site and were going to conduct an inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2070585789
 +
| 2014-11-19
 +
|
 +
| On site with District Supervisor -  Richard Anderson and Regional Supervisor -  Tom Hill to conduct a status check on the production well number 6H.  At the time of the inspection, the site was frozen and snow covered.  The equipment on site related to the 6 well heads also contained 12 storage tanks, 6 sand separators, 6 gas processing units, 1 oil stabilizer, 1 main service line, and 6 gas recovery units.  During the inspection, Unit #2 of the gas recovery unit had a leaking dump valve whose gas pressure fell below correct operating pressure and needed to be reset.  Contacted the well tender to come out and reset the unit.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -320955085
 
| -320955085
 
| 2014-02-11
 
| 2014-02-11
|
+
|  
 
| I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Rocky Mountain Drilling has drilled a 26 inch hole to a total depth of 100 feet and ran 100 feet of 20 inch casing (70 pounds per foot / inside diameter is 19.25 inches). Universal cemented the casing with 175 sacks of Type 1 cement with 2% CaCl and .125 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 37 barrels of cement slurry, 31 barrels of displacement, and there was 5 barrels of cement returns. My inspection revealed no violations at this time.
 
| I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Rocky Mountain Drilling has drilled a 26 inch hole to a total depth of 100 feet and ran 100 feet of 20 inch casing (70 pounds per foot / inside diameter is 19.25 inches). Universal cemented the casing with 175 sacks of Type 1 cement with 2% CaCl and .125 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 37 barrels of cement slurry, 31 barrels of displacement, and there was 5 barrels of cement returns. My inspection revealed no violations at this time.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1393868827
 
| 2014-03-03
 
|
 
| I was on site with Inspector Jim Bucksar to conduct an inspection of the drill site. We walked the entire perimeter of the site and found that the filter socks and silt fence  are intact and functioning properly. Our inspection of the rock channels revealed that the channels were intact and there was no erosion and sedimentation. We walked around the drilling rig and containment areas and found no spills on the containment or holes in the containment. Our inspection revealed no violations at this time. NOTE: We notified the Company Man and the Toolpusher that we were on site and were going to conduct an inspection.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 623493795
 
| 623493795
 
| 2014-02-20
 
| 2014-02-20
|
+
|  
 
| I was on site to witness the cementing of the 9 5/8 inch intermediate casing. I arrived on site and spoke with the security guard and he advised that cement trucks were not on site because the township road has been torn up and the trucks couldn't travel on the road. Rex Energy has a Road Use Agreement to come to the site off State Route 43 and Gallo Road ( Gallo Road is the road that has the issues). I went to the pad to talk with the Company Man ( Aaron Wilhite) and found that he was not in his office. I observed Summit Casing's Truck was on site but no crews were with the truck. I also observed that the 9 5/8 inch casing was still on the pipe racks. While departing the site, I spoke with the security guard again and he advised me that the casing crew left sometime around midnight. NOTE: I tried to call the rig at 12:03am before leaving my house, because Aaron Wilhite had advised me earlier that they would be ready to cement at approximately 1:00am. I didn't get an answer when I called the rig, so I assumed Aaron was on the rig floor or rigging up cementers.
 
| I was on site to witness the cementing of the 9 5/8 inch intermediate casing. I arrived on site and spoke with the security guard and he advised that cement trucks were not on site because the township road has been torn up and the trucks couldn't travel on the road. Rex Energy has a Road Use Agreement to come to the site off State Route 43 and Gallo Road ( Gallo Road is the road that has the issues). I went to the pad to talk with the Company Man ( Aaron Wilhite) and found that he was not in his office. I observed Summit Casing's Truck was on site but no crews were with the truck. I also observed that the 9 5/8 inch casing was still on the pipe racks. While departing the site, I spoke with the security guard again and he advised me that the casing crew left sometime around midnight. NOTE: I tried to call the rig at 12:03am before leaving my house, because Aaron Wilhite had advised me earlier that they would be ready to cement at approximately 1:00am. I didn't get an answer when I called the rig, so I assumed Aaron was on the rig floor or rigging up cementers.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:37, 14 July 2015

Well Details

Well ID: 34-019-22554
Loading map...
County: Carroll
Municipality:
Operator Name: R E GAS DEVELOPMENT LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-02-10
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.6066727
Longitude: -81.0843026

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 80167.0 42.0 9195.0 42.0
2014-4 141814.0 92.0 13256.0 92.0
2015-1 101201.0 90.0 8954.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1393868827 2014-03-03 I was on site with Inspector Jim Bucksar to conduct an inspection of the drill site. We walked the entire perimeter of the site and found that the filter socks and silt fence are intact and functioning properly. Our inspection of the rock channels revealed that the channels were intact and there was no erosion and sedimentation. We walked around the drilling rig and containment areas and found no spills on the containment or holes in the containment. Our inspection revealed no violations at this time. NOTE: We notified the Company Man and the Toolpusher that we were on site and were going to conduct an inspection.
2070585789 2014-11-19 On site with District Supervisor - Richard Anderson and Regional Supervisor - Tom Hill to conduct a status check on the production well number 6H. At the time of the inspection, the site was frozen and snow covered. The equipment on site related to the 6 well heads also contained 12 storage tanks, 6 sand separators, 6 gas processing units, 1 oil stabilizer, 1 main service line, and 6 gas recovery units. During the inspection, Unit #2 of the gas recovery unit had a leaking dump valve whose gas pressure fell below correct operating pressure and needed to be reset. Contacted the well tender to come out and reset the unit.
-320955085 2014-02-11 I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Rocky Mountain Drilling has drilled a 26 inch hole to a total depth of 100 feet and ran 100 feet of 20 inch casing (70 pounds per foot / inside diameter is 19.25 inches). Universal cemented the casing with 175 sacks of Type 1 cement with 2% CaCl and .125 pound per sack celloflake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 37 barrels of cement slurry, 31 barrels of displacement, and there was 5 barrels of cement returns. My inspection revealed no violations at this time.
623493795 2014-02-20 I was on site to witness the cementing of the 9 5/8 inch intermediate casing. I arrived on site and spoke with the security guard and he advised that cement trucks were not on site because the township road has been torn up and the trucks couldn't travel on the road. Rex Energy has a Road Use Agreement to come to the site off State Route 43 and Gallo Road ( Gallo Road is the road that has the issues). I went to the pad to talk with the Company Man ( Aaron Wilhite) and found that he was not in his office. I observed Summit Casing's Truck was on site but no crews were with the truck. I also observed that the 9 5/8 inch casing was still on the pipe racks. While departing the site, I spoke with the security guard again and he advised me that the casing crew left sometime around midnight. NOTE: I tried to call the rig at 12:03am before leaving my house, because Aaron Wilhite had advised me earlier that they would be ready to cement at approximately 1:00am. I didn't get an answer when I called the rig, so I assumed Aaron was on the rig floor or rigging up cementers.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.