If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-035-22197 | | Well ID: 34-035-22197 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.42041618, -81.7663204 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Cuyahoga County, Ohio|Cuyahoga]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[GREEN ENERGY INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2012-06-04 | | Spud Date: 2012-06-04 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Final Restoration |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.42041618 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.7663204 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 67: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1339078253 | ||
+ | | 2012-06-09 | ||
+ | | | ||
+ | | My visit to the well site today was to cement the production casing. Cement report will be filed following the completion of the drilling process. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1350407983 | ||
+ | | 2012-10-16 | ||
+ | | | ||
+ | | My visit to the well today was to check progress on the restoration Process. This well was drilled from 6/4/12 through 6/9/12, due to lack of sufficient pressure the well was plugged 0n 7/25/12 and 7/27/12. A vault and vent system was installed on 10/11/12 due to minimum leakage of shale gas around the 8.625 casing. The current vent pipe will be replaced with a longer pipe in the short term, which will complete this well. Ground restoration has begun and grass is growing on the site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -2107795869 | | -2107795869 | ||
| 2012-06-05 | | 2012-06-05 | ||
− | | | + | | |
| Well inspection on this date was to cement surface casing and to conduct Blow Off Preventer (BOP) testing. Cement report will be placed on file following completion of well drilling and cementing process. | | Well inspection on this date was to cement surface casing and to conduct Blow Off Preventer (BOP) testing. Cement report will be placed on file following completion of well drilling and cementing process. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -836472224 | | -836472224 | ||
| 2014-05-15 | | 2014-05-15 | ||
− | | | + | | |
| I isnpected the location if this former procuding unit for completion of final restoration. Cuurently there is a 4-inch diameter vent stack which extends above grade to an approximate height of 12 feet above grade. The area around the former well has been graded and vegetation has been established. Pits have been filled and all other appurtenances from production have been removed. No further activity is warranted. Final resotration is complete. | | I isnpected the location if this former procuding unit for completion of final restoration. Cuurently there is a 4-inch diameter vent stack which extends above grade to an approximate height of 12 feet above grade. The area around the former well has been graded and vegetation has been established. Pits have been filled and all other appurtenances from production have been removed. No further activity is warranted. Final resotration is complete. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -975831254 | | -975831254 | ||
| 2012-06-04 | | 2012-06-04 | ||
− | | | + | | |
| My inspection today found rig being set up. Pits were being dug prior to spudding on this date and conductor casing was set in the late afternoon. Cementing report will be filed following completion of well drilling and cementing. | | My inspection today found rig being set up. Pits were being dug prior to spudding on this date and conductor casing was set in the late afternoon. Cementing report will be filed following completion of well drilling and cementing. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-035-22197 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.42041618,"lon":-81.7663204,"icon":""}]} |
County: Cuyahoga | |
Municipality: | |
Operator Name: GREEN ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-06-04 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Final Restoration | |
Violations: 0 | |
Latitude: 41.42041618 | |
Longitude: -81.7663204 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1339078253 | 2012-06-09 | My visit to the well site today was to cement the production casing. Cement report will be filed following the completion of the drilling process. | ||||
1350407983 | 2012-10-16 | My visit to the well today was to check progress on the restoration Process. This well was drilled from 6/4/12 through 6/9/12, due to lack of sufficient pressure the well was plugged 0n 7/25/12 and 7/27/12. A vault and vent system was installed on 10/11/12 due to minimum leakage of shale gas around the 8.625 casing. The current vent pipe will be replaced with a longer pipe in the short term, which will complete this well. Ground restoration has begun and grass is growing on the site. | ||||
-2107795869 | 2012-06-05 | Well inspection on this date was to cement surface casing and to conduct Blow Off Preventer (BOP) testing. Cement report will be placed on file following completion of well drilling and cementing process. | ||||
-836472224 | 2014-05-15 | I isnpected the location if this former procuding unit for completion of final restoration. Cuurently there is a 4-inch diameter vent stack which extends above grade to an approximate height of 12 feet above grade. The area around the former well has been graded and vegetation has been established. Pits have been filled and all other appurtenances from production have been removed. No further activity is warranted. Final resotration is complete. | ||||
-975831254 | 2012-06-04 | My inspection today found rig being set up. Pits were being dug prior to spudding on this date and conductor casing was set in the late afternoon. Cementing report will be filed following completion of well drilling and cementing. |
For data sources see[2]